Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Blog & Industry Insights

Looking for guides for a specific country? Browse wastewater treatment guides by country →

Data Center Cooling Blowdown Treatment in Yekaterinburg: 2026 Guide

Published: Oct 17, 2026

2026 engineering guide to cooling blowdown and wastewater treatment for data centers in Yekaterinburg, Russia — climate-driven design, reuse train, and compliance.

Data Center Cooling Blowdown Treatment in Yekaterinburg: 2026 Guide

How Transportation Equipment Plants Near Norfolk Meet 2026 Pretreatment Limits

Published: Oct 17, 2026

Engineering guide to how Norfolk-area transportation equipment plants meet 2026 EPA and HRSD pretreatment limits before sewer discharge, with equipment and compliance steps.

How Transportation Equipment Plants Near Norfolk Meet 2026 Pretreatment Limits

Package Treatment Plants Near a Borehole: 2026 Engineering & Siting Guide

Published: Oct 17, 2026

Siting a package treatment plant close to a water borehole in 2026: setback distances, contamination risks, plant selection and discharge compliance for engineers.

Package Treatment Plants Near a Borehole: 2026 Engineering & Siting Guide

DAF or Clarifier for Mining/Metals Wastewater in Kennewick: 2026 Factory Guide

Published: Oct 17, 2026

2026 buyer's guide for Kennewick mining and metals factories: DAF vs clarifier for TSS, FOG and metals removal, with Washington design criteria and sizing tips.

DAF or Clarifier for Mining/Metals Wastewater in Kennewick: 2026 Factory Guide

Filter Press for Meat Processing Wastewater: 2026 Design Guide

Published: Oct 17, 2026

2026 engineering guide to designing a filter press for meat processing wastewater — slurry conditioning, plate sizing, FOG handling, and DAF integration.

Filter Press for Meat Processing Wastewater: 2026 Design Guide

How to Size a Containerized MBR STP in Stockholm, Sweden (2026 Guide)

Published: Oct 17, 2026

Step-by-step 2026 engineering guide to sizing a containerized MBR STP for residential and camp projects in Stockholm, Sweden — load, container, membrane, cold-climate tips.

How to Size a Containerized MBR STP in Stockholm, Sweden (2026 Guide)

Effluent Treatment Plant in Luxor 2026: Process, Capacity & Compliance

Published: Oct 17, 2026

Plan an effluent treatment plant in Luxor, Egypt for 2026 — process design for hotels, textiles and agriculture near the Nile, with reuse and discharge compliance.

Effluent Treatment Plant in Luxor 2026: Process, Capacity & Compliance

Data Center Cooling Blowdown Treatment in Belem, Brazil (2026 Guide)

Published: Oct 17, 2026

2026 engineering guide to data center cooling blowdown and wastewater treatment in Belem, Brazil — technology train, costs, and discharge compliance.

Data Center Cooling Blowdown Treatment in Belem, Brazil (2026 Guide)

Bellevue Mining Pretreatment 2026: Meeting Sewer Discharge Limits

Published: Oct 17, 2026

How mining and metals plants near Bellevue meet 2026 sewer pretreatment limits: 40 CFR Part 436, local POTW rules, and the six-step treatment train.

Bellevue Mining Pretreatment 2026: Meeting Sewer Discharge Limits

Number of STPs in Tamil Nadu 2024-25: Policy & Capacity Map

Published: Oct 17, 2026

STP count in Tamil Nadu for 2024-25, TNPCB discharge standards, NGT norms, and how operators plan capacity for compliant sewage treatment.

Number of STPs in Tamil Nadu 2024-25: Policy & Capacity Map

Welspun unit wins ₹66 crore NDMC sewer rehabilitation contract, Oct 2026

Published: Oct 16, 2026

On 9 October 2026, the New Delhi Municipal Council issued a Letter of Acceptance to Welspun Michigan Engineers Limited for a sewer rehabilitation project valued at approximately ₹66 crore (excluding GST) with an 18-month execution window. The award raises the Welspun Enterprises subsidiary's order book to about ₹2,356.66 crore and reflects municipal demand for trenchless rehabilitation of aged urban sewers rather than new pipeline laying. For plant managers and procurement leads, the deal signals continued Indian metro spending on specialised sewer renewal and a competitive edge held by contractors with trenchless technology capability.

Welspun unit wins ₹66 crore NDMC sewer rehabilitation contract, Oct 2026

Leaked Russian plan lists Ukrainian wastewater facilities among 60 priority energy targets, Oct 2026

Published: Oct 16, 2026

A report published 9 October 2026 by Uacrisis.org details a Russian planning document dated August 2026 that lists Ukraine's power generation, water supply, wastewater treatment facilities and heating system as four priority target categories, totalling 60 facilities including the country's hydroelectric and nuclear power plants. The plan names Kyiv, Kharkiv and Odesa as top targets and proposes 90 percent cuts to electricity and heating, plus severe sewage disruption, in those cities. For operators and procurement leads, the relevant signal is that municipal wastewater assets are classified alongside substations and boiler houses rather than as civilian infrastructure.

Leaked Russian plan lists Ukrainian wastewater facilities among 60 priority energy targets, Oct 2026

Gibraltar environment minister briefs MEPs in Brussels on new urban wastewater plant, October 2026

Published: Oct 16, 2026

On 9 October, Gibraltar's Minister for the Environment and Climate Change, John Cortes, met Members of the European Parliament and other Brussels-based interlocutors to discuss implementation of the UK-EU Agreement in respect of Gibraltar. The talks centred on the Agreement's environmental provisions and the planned new urban wastewater treatment plant, with Cortes countering what he called unsubstantiated environmental allegations from local Spanish actors. The Government said the EU ratification process remains on track ahead of the European Parliament's consent vote in December. For plant managers and procurement leads, the signal is a politically backed new-build municipal wastewater scheme being positioned against a high-profile compliance framework, which will shape specification, consenting and tender timing.

Gibraltar environment minister briefs MEPs in Brussels on new urban wastewater plant, October 2026

India PFAS contamination review flags drinking-water gap, October 2026

Published: Oct 16, 2026

A 14 October 2026 explainer from Vajiram & Ravi has put India's regulatory gap on per- and polyfluoroalkyl substances, or PFAS, back in focus, warning that testing gaps, ineffective treatment systems and missing drinking-water limits are leaving utilities without a clear compliance path. The piece notes that IARC classified PFOA as carcinogenic to humans and PFOS as possibly carcinogenic in 2025, that investigations have covered Gujarat, Maharashtra, Tamil Nadu and West Bengal, and that conventional biological wastewater treatment cannot remove these chemicals. A Bureau of Indian Standards working group is now working on baseline data, testing methods and possible limits, meaning any plant drawing from flagged catchments will need to scope advanced polishing separately.

India PFAS contamination review flags drinking-water gap, October 2026

US senators challenge EPA wastewater surveillance plan, October 2026

Published: Oct 16, 2026

On 15 October 2026, 47 Democratic US senators led by Sen. Patty Murray (D-Wash.) sent a six-page letter to EPA Administrator Lee Zeldin opposing an EPA plan to test metropolitan-area wastewater for mifepristone and misoprostol, the drugs used in medication abortion. The formal investigation, launched in September 2026, follows 2025 research confirming the test was technically possible and a June 2025 letter from dozens of Republican legislators asking the EPA about detection methods. The senators argue the program is a politically driven misuse of the Safe Drinking Water Act. For plant operators and procurement leads, the immediate impact is a new federal sampling request that may land on existing influent and effluent monitoring rather than any new treatment-stage requirement.

US senators challenge EPA wastewater surveillance plan, October 2026

Lviv awards wastewater aerotank design contracts to firm with Russian ties, October 2026

Published: Oct 16, 2026

On 2 October 2026, NGL.media reported that Lvivvodokanal awarded three aerotank design contracts worth a combined UAH 8.2 million to Kharkiv-based Intechengineering, its first public-procurement work. The Lviv plants handle about 400,000 m³/day through a 1960s–70s mechanical-plus-biological train, with the design scope limited to aerotanks. NGL.media linked Intechengineering's owner to the Ukrainian-Russian RPE Ecopolymer consortium, whose Russian arm in the Kaluga region remains active, and said it held the story for four months at the request of security forces reviewing the utility's contracts. For operators and buyers, the reported project is a legacy activated-sludge aeration retrofit, not a build contract, and no influent or effluent design parameters were published.

Lviv awards wastewater aerotank design contracts to firm with Russian ties, October 2026

Indian water systems miss PFAS problem as studies flag treatment gaps, Oct 2026

Published: Oct 16, 2026

A report published on 15 October 2026 has warned that India's water and sewage systems are not equipped for PFAS even as studies keep finding the compounds in groundwater, sewage and treated water. An IIT-Madras study found PFAS concentrations in treated water at a Chennai plant were 5 to 103 per cent higher than in raw water, and a GITAM-led study around Visakhapatnam detected 38 of 77 PFAS compounds tested, with sewage estimated at about 41 per cent of median coastal concentrations. The report says India has no PFAS-specific limits, no national monitoring framework and no commercially proven removal systems, which matters for plant managers and procurement teams who may need to add polishing and monitoring stages to existing trains.

Indian water systems miss PFAS problem as studies flag treatment gaps, Oct 2026

CSE to host roundtable on decentralised wastewater treatment and bulk reuse in India, October 2026

Published: Oct 16, 2026

On 14 October 2026, the Centre for Science and Environment (CSE) announced a stakeholder roundtable on decentralised wastewater treatment and bulk reuse in India, framing urban water stress as a lived reality. The notice targets fit-for-purpose non-potable reuse (flushing, landscaping, cooling, industrial processes) and recovery of sludge and other solids as compost, soil amendments, energy feedstock or nutrients. The roundtable will work through three questions: where India stands today, what enables or constrains adoption, and what must change technically, regulatorily and institutionally. No project capacity, cost or supplier was reported, so the event is a policy and procurement direction signal rather than a contract award.

CSE to host roundtable on decentralised wastewater treatment and bulk reuse in India, October 2026

NGT seeks MoEFCC reply on industrial effluent and ZLD rules, Oct 2026

Published: Oct 16, 2026

On 5 October 2026, the National Green Tribunal's principal bench issued notice to the Ministry of Environment, Forest and Climate Change in a petition by environment activist Narender Sirohi, reported by The Times of India on 9 October 2026. The petition seeks a statutory overhaul of industrial effluent and zero liquid discharge safeguards, flagging a contradiction between a Jan 2026 MoEFCC office memorandum barring tanker transport of effluent to CETPs and a 9 September 2024 notification still in force that permits such tanker transport with GPS and real-time monitoring. It also asks NGT to stop MoEFCC from clearing ZLD amendments that divert treated effluent to agriculture or horticulture, and to set up a national public reporting platform. The next hearing is set for 21 January 2027, with MoEFCC's affidavit reply due one week before.

NGT seeks MoEFCC reply on industrial effluent and ZLD rules, Oct 2026

Spain's combined sewer overflows send untreated waste into rivers and seas, October 2026

Published: Oct 16, 2026

A 9 October 2026 Phys.org feature by Elisenda Ballesté explains how Spain's combined sewers spill untreated wastewater into rivers and the sea once treatment plants are overwhelmed by heavy rain, with outfalls along the Besòs River in Barcelona cited as a working example. The piece links the spills to E. coli and enterococci exceedances that trigger red flags, and notes that monitoring outside the summer season does not capture long-term pollutants. It also documents local responses, including 11 storm tanks in Barcelona keeping about 900 tonnes of suspended solids a year out of the sea, and the new European Directive on Urban Waste Water that will require event-by-event discharge monitoring and retention measures.

Spain's combined sewer overflows send untreated waste into rivers and seas, October 2026

Indian wastewater planners urged to rethink centralised STP scale, October 2026

Published: Oct 16, 2026

An analysis published on 9 October 2026 by The Policy Edge argues that India's urban water challenge is a question of infrastructure scale rather than quantity, using Mumbai as the worked example. The article, drawn from Water Policy research by Shweta Lokhande at IIT Bombay, shows that Indian cities often run sewage treatment plants more than 20 years old that receive less than 50 percent of their design flow, and that collection networks can absorb 70 to 80 percent of sewerage project costs. It favours a missing middle of mid-sized, distributed plants over either very small or very large single units, a shift also being advocated for water systems in the Gulf.

Indian wastewater planners urged to rethink centralised STP scale, October 2026

Gradiant lands five India design-build water contracts, names new MD, October 2026

Published: Oct 16, 2026

On 9 October 2026, Gradiant announced five new design-build contracts in India covering ultrapure water, wastewater treatment and zero liquid discharge systems for semiconductor, printed circuit board and solar manufacturing customers, the appointment of Hari Prasad, formerly of Pentair, as Managing Director, India, and a plan to grow its India workforce by more than 40% during the year. One of the five is a repeat order from a global semiconductor manufacturer expanding a fabrication facility, and India orders are on track to more than double with revenue set to more than triple. Customer names and contract values were not disclosed. For operators scoping fab-class ZLD projects, the announcement signals that single-accountable water packages, high-recovery pretreatment and thermal ZLD finishing are the design pattern bidders will be asked to deliver in India.

Gradiant lands five India design-build water contracts, names new MD, October 2026

How to Size a Containerized MBR STP in Colombo, Sri Lanka (2026 Guide)

Published: Oct 16, 2026

2026 engineering guide to sizing a containerized MBR STP in Colombo for residential and camp projects — flow rates, container options, and SLSI effluent targets.

How to Size a Containerized MBR STP in Colombo, Sri Lanka (2026 Guide)

Data Center Cooling Blowdown Treatment in Khulna, Bangladesh (2026 Guide)

Published: Oct 16, 2026

2026 engineering guide to cooling blowdown and wastewater treatment for data centers in Khulna, Bangladesh — salinity, power, and reuse targets.

Data Center Cooling Blowdown Treatment in Khulna, Bangladesh (2026 Guide)

How Chemicals Plants Near Farmers Branch Meet 2026 Pretreatment Limits

Published: Oct 16, 2026

2026 engineering guide to chemical plant pretreatment compliance near Farmers Branch, TX: federal PFAS rule status, Dallas POTW limits, and treatment trains.

How Chemicals Plants Near Farmers Branch Meet 2026 Pretreatment Limits

Matabeleland North Province Industrial Wastewater Discharge Treatment Fee (2026 Guide)

Published: Oct 16, 2026

How Matabeleland North industrial wastewater discharge fees are structured in 2026, what EMA/ZINWA charge, and how to budget for treatment and discharge.

Matabeleland North Province Industrial Wastewater Discharge Treatment Fee (2026 Guide)

DAF or Clarifier for Mining/Metals Wastewater in Rosebud, US: 2026 Factory Guide

Published: Oct 16, 2026

Compare DAF vs clarifier for mining and metals factories in Rosebud, US in 2026. 40 CFR Part 437 metals limits, removal efficiency, and selection framework.

DAF or Clarifier for Mining/Metals Wastewater in Rosebud, US: 2026 Factory Guide

Filter Press for Fruit Juice Wastewater Design: 2026 Guide

Published: Oct 16, 2026

Filter press design for fruit juice wastewater: sludge conditioning, plate sizing, cloth selection and 2026 compliance tips for juice processors.

Filter Press for Fruit Juice Wastewater Design: 2026 Guide

How to Size a Containerized MBR STP in Madrid, Spain (2026 Guide)

Published: Oct 16, 2026

Step-by-step 2026 engineering guide to sizing a containerized MBR STP for residential and camp projects in Madrid, Spain — flow, load, and container selection.

How to Size a Containerized MBR STP in Madrid, Spain (2026 Guide)

Verschil Natte Scrubber Droge Scrubber: 2026 Technische Vergelijking

Published: Oct 16, 2026

Verschil natte scrubber droge scrubber uitgelegd: werking, verwijderingsefficiëntie, drukval, OPEX en 2026 toepassingen voor industriële gaswassers.

Verschil Natte Scrubber Droge Scrubber: 2026 Technische Vergelijking
AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us