Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

MBR Membrane Bioreactor Wastewater Treatment System

MBR Membrane Bioreactor Wastewater Treatment System
MBR Membrane Bioreactor Wastewater Treatment System

Integrated MBR membrane bioreactor system combining activated sludge treatment with submerged PVDF membrane filtration. Delivers near-reuse-quality effluent (<1 μm filtration) with 60% smaller footprint than conventional systems. Ideal for municipal sewage, industrial process water, and water reuse projects from 10 to 2,000 m³/day.

The HydropureWater MBR Integrated Wastewater Treatment System combines advanced membrane bioreactor (MBR) technology with biological treatment in a single, factory-assembled package. By replacing the conventional secondary clarifier with submerged PVDF ultrafiltration membranes, this system achieves superior effluent quality — with virtually all particles larger than 1 μm removed — making the treated water suitable for direct non-potable reuse including irrigation, industrial process water, cooling tower makeup, and toilet flushing.

The integrated design delivers all the advantages of MBR technology in a compact, pre-engineered unit that can be deployed rapidly with minimal civil works, meeting or exceeding EU Directive 91/271/EEC, US EPA Guidelines for Water Reuse, and WHO water reuse recommendations.

Key Features

  • Superior effluent quality — sub-micron membrane filtration produces clear, low-turbidity effluent suitable for direct water reuse
  • 60% smaller footprint — high MLSS concentration (7,000–18,000 mg/L, 5× conventional) allows dramatically smaller biological reactors
  • No secondary clarifier needed — membranes replace sedimentation, eliminating bulking sludge problems entirely
  • Low excess sludge production — extended sludge retention time (SRT) reduces sludge handling and disposal costs
  • Independent HRT/SRT control — hydraulic and sludge retention times are decoupled for optimized biological performance
  • Effective pathogen removal — physical membrane barrier significantly reduces bacteria and virus concentrations
  • No chemical dosing required — biological process operates without coagulant or flocculant addition for routine operation
  • High automation — PLC-controlled operation with remote monitoring capability

How It Works

The integrated MBR system operates on a two-zone biological process:

  1. Anoxic Zone (A-stage) — packed media promotes contact between wastewater and activated sludge under anoxic conditions, achieving denitrification and partial organic removal
  2. Aerobic Membrane Zone (O-stage) — submerged PVDF membrane modules operate under fine bubble aeration. The membranes retain activated sludge and large organic molecules while allowing treated permeate to pass through. Aeration serves the dual purpose of biological oxygen supply and continuous membrane scouring to prevent fouling.

The membrane barrier maintains biomass concentration at 7,000–18,000 mg/L — approximately 5 times higher than conventional activated sludge systems. This dramatically increases volumetric treatment efficiency while allowing independent control of hydraulic retention time (HRT) and sludge retention time (SRT) for process optimization.

Technical Specifications

ParameterSpecification
Treatment Capacity10 – 2,000 m³/day (custom sizes available)
Biological ProcessA/O (Anoxic/Aerobic) with submerged MBR
Membrane TypePVDF flat sheet / hollow fiber, submerged configuration
Membrane Pore Size0.1 – 0.4 μm (microfiltration / ultrafiltration)
MLSS Concentration7,000 – 18,000 mg/L
Effluent Turbidity< 1 NTU
Footprint ReductionUp to 60% smaller than conventional activated sludge
Effluent StandardMeets EU Directive 91/271/EEC, US EPA reuse guidelines
AutomationPLC with SCADA-ready interface; remote monitoring optional

Applications

  • Municipal & Domestic Wastewater: municipal sewage treatment, residential communities, hospitals, resorts, highway service areas
  • Water Reuse Projects: industrial process water recycling, irrigation reuse, cooling tower makeup, toilet flushing
  • Industrial Wastewater: landfill leachate, slaughterhouse & food processing, brewery & beverage, textile dyeing, electroplating
  • Plant Upgrades & Retrofits: effluent quality upgrades to meet stricter discharge limits, capacity expansion of existing treatment plants, conversion to water reuse

Why Choose HydropureWater MBR Systems?

HydropureWater MBR systems deliver the gold standard in compact wastewater treatment — near-reuse-quality effluent from a footprint 60% smaller than conventional plants, with no clarifier to maintain and no sludge bulking to worry about. Whether you are building a new treatment facility, upgrading an aging plant to meet tighter discharge limits, or implementing a water reuse program, our integrated MBR packages arrive factory-tested and ready for rapid installation. With proven PVDF membrane technology, fully automatic PLC control, and a track record across municipal, commercial, and industrial applications, the HydropureWater MBR is engineered for reliable, low-cost operation over the long term.

Frequently Asked Questions

What effluent quality can the MBR system achieve?

The MBR system achieves CODcr ≤60 mg/L, BOD₅ ≤20 mg/L, NH₃-N ≤15 mg/L, and SS ≤20 mg/L, meeting China Class 1A discharge standard.

What are the main advantages of MBR over conventional activated sludge?

MBR offers a smaller footprint, superior effluent quality, 80% less sludge production, and eliminates the need for a secondary clarifier.

Is the MBR system suitable for industrial wastewater retrofit?

Yes, the MBR system is ideal for upgrading existing municipal and industrial treatment plants to meet stricter discharge standards.

How long do MBR membranes last?

MBR membranes last 5–8 years with proper maintenance and automated chemical cleaning (CIP).

After-Sales Service & Support

  • 12-Month Full Warranty — covers all manufacturing defects in materials and workmanship
  • Lifetime Technical Support — our engineering team provides remote diagnostics and troubleshooting assistance
  • Spare Parts Guarantee — critical spare parts shipped within 48 hours worldwide
  • On-Site Commissioning — factory-trained engineers available for installation supervision and operator training
  • Preventive Maintenance Programs — customized maintenance schedules to maximize equipment lifespan

Proposed for These Projects

Engineering assessments where this product is part of our proposed solution. These projects are not yet delivered.

Project demand matrix →

Ready to Solve Your Wastewater Challenges?

Get a free consultation and customized quote from our engineering team.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us