~200 m³/d modular MBR wastewater treatment system

Proposed modular wastewater treatment package for phased expansion, subject to wastewater characterisation and applicable discharge requirements.

Project Background

The client requires a modular treatment system that can be expanded from an initial ~200 m³/d design basis to twice that capacity within two to three years. The wastewater source, average and peak flow bases, operating hours, influent characteristics, discharge destination and applicable permit limits remain to be confirmed before final process and equipment selection.

Our Solution

The proposed solution is a modular MBR wastewater treatment package comprising inlet screening, flow equalisation, biological treatment with flat-sheet membrane separation, disinfection, flow-paced transfer, and a dedicated sludge-handling train. Screening protects downstream equipment, equalisation smooths variable loads, biological treatment and membrane separation provide a compact treatment stage, and disinfection addresses the final microbiological control requirement. Thickening and plate-and-frame dewatering reduce sludge volume before controlled storage and disposal. The configuration should preserve common treatment modules, utilities and controls so additional capacity can be added without redesigning the complete plant. Final pretreatment, membrane area, disinfection method, residuals handling and module arrangement will be adjusted after wastewater data, operating criteria and the applicable discharge standard are confirmed.

What We Asked First

Please confirm the wastewater source, flow basis, peak factors, operating hours, influent analysis or engineer-approved design values, discharge destination and permit limits, installation conditions, electrical supply, project scope, delivery location and commissioning programme.

Proposed Process Train

  1. 1Influent characterisation and flow monitoring
  2. 2inlet screening and grease or solids removal where required
  3. 3equalisation and flow control
  4. 4biological MBR treatment with flat-sheet membrane separation
  5. 5disinfection and flow-paced transfer
  6. 6sludge thickening and dewatering
  7. 7dewatered sludge storage and controlled disposal

For Similar Projects

Prepare a wastewater source and process profile, flow data, influent analyses, discharge criteria, site utilities and delivery schedule before selecting the final configuration and expansion boundaries.

Ref. A-033. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

This project is listed in the ~200 m³/d capacity class: the design value rounded up to the next 5 at its second significant digit. Exact design values are not published.
The process train under assessment is: Influent characterisation and flow monitoring → inlet screening and grease or solids removal where required → equalisation and flow control → biological MBR treatment with flat-sheet membrane separation → disinfection and flow-paced transfer → sludge thickening and dewatering → dewatered sludge storage and controlled disposal.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us