100 m³/d MBR wastewater treatment system for unidentified soil waste

Proposed MBR treatment for an unidentified soil-waste stream, subject to source clarification, water analysis and confirmation of reuse requirements.

Project Background

The client-supplied design basis is 100 m³/d with an unspecified soil-waste source and no water analysis or confirmed reuse destination. The design must also establish daily flow variation, operating hours, peak conditions, pollutants, site constraints and whether complete treatment, sludge handling or only membrane equipment is required.

Our Solution

We propose screening, flow equalisation and source-appropriate pretreatment before an MBR biological reactor. The MBR stage provides mixed-liquor solids separation without a conventional clarifier, while chlorine dioxide can disinfect the treated water where validated for the application. A dedicated sludge line will condition and dewater residual solids with a plate-and-frame filter press; the final destination must be based on testing and local requirements. Equipment may also require DAF or lamella clarification if oil, solids or settleable material is significant. MBR suitability, pretreatment, disinfection, storage and sludge reuse remain subject to source identification, water analysis and the intended reuse or discharge standard.

What We Asked First

Please confirm the waste source, intended project use, flow variation and operating schedule, pH, COD, BOD₅, TSS, ammonia, TN, TP, oil, salinity and special pollutants, reuse or discharge requirements, site details, electrical supply and delivery location.

Proposed Process Train

  1. 1Source segregation and flow equalisation
  2. 2Screening and grit removal
  3. 3Biological treatment with MBR
  4. 4Chlorine dioxide disinfection
  5. 5Treated-water storage or reuse
  6. 6Sludge conditioning and plate-and-frame dewatering
  7. 7Dewatered sludge collection for an approved use or disposal

For Similar Projects

Prepare the source description, complete water analysis, flow and load record, reuse or discharge criteria, site drawings, available utilities and required supply scope before selecting equipment or confirming the process design.

Ref. A-032. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

This project is listed in the 100 m³/d capacity class: the design value rounded up to the next 5 at its second significant digit. Exact design values are not published.
The process train under assessment is: Source segregation and flow equalisation → Screening and grit removal → Biological treatment with MBR → Chlorine dioxide disinfection → Treated-water storage or reuse → Sludge conditioning and plate-and-frame dewatering → Dewatered sludge collection for an approved use or disposal.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.