Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Underground Package Sewage Treatment Plant (WSZ Series)

Underground Package Sewage Treatment Plant (WSZ Series)
Underground Package Sewage Treatment Plant (WSZ Series)

WSZ series underground integrated sewage treatment plant combines anoxic/aerobic (A/O) biological contact oxidation with sedimentation and disinfection in a single buried package unit. Fully automated with no operator required, it handles 1–80 m³/h for residential communities, hotels, hospitals, factories, and rural areas. Can be installed below grade with landscaping above, or mounted on a trailer for mobile deployment.

The WSZ series underground package sewage treatment plant is an advanced, fully integrated wastewater treatment system designed for decentralized applications. Installed below ground level, the unit allows the surface above to be used for landscaping, parking, or other purposes — eliminating the need for dedicated treatment buildings, heating, or insulation. The system operates on a fully automatic control platform requiring no on-site operator, no sludge recirculation, and minimal maintenance.

Engineered for municipal and light industrial organic wastewater, the WSZ series delivers treated effluent that meets or exceeds EU Urban Waste Water Treatment Directive (91/271/EEC) secondary treatment standards and US EPA NPDES discharge requirements for BOD, TSS, and pathogen reduction.

Key Features

  • Below-grade installation — buried beneath the surface, allowing green space, parking, or landscaping above the unit
  • Fully automatic operation — PLC-controlled with no dedicated operator required; simple maintenance access
  • Zero sludge recirculation — simplified process with minimal excess sludge production
  • Compact footprint — integrated seven-stage process in a single tank reduces land requirements by up to 50%
  • Flexible construction materials — available in full stainless steel (SS304/316), carbon steel (Q235), carbon steel + FRP composite, full FRP cylindrical, or reinforced concrete
  • Mobile deployment option — can be trailer-mounted for emergency or temporary wastewater treatment
  • Submersible pump integration — pumps installed inside the unit reduce civil works and capital cost
  • Stable effluent quality — consistent output regardless of influent flow variations

How It Works

The WSZ system employs a proven A/O (Anoxic/Aerobic) biological contact oxidation process, integrating seven treatment stages in a single package unit:

  1. Bar Screen & Equalization Tank — coarse solids removal and flow equalization
  2. Primary Sedimentation Tank — gravity settling of suspended solids
  3. Anoxic Zone (A-stage) — denitrification under anoxic conditions with bio-media
  4. Aerobic Contact Oxidation Zone (O-stage) — BOD/COD removal via attached-growth biomass with fine bubble aeration
  5. Secondary Clarifier — final solids-liquid separation
  6. Disinfection Chamber — chlorine or UV disinfection for pathogen removal
  7. Sludge Holding Tank & Blower Room — sludge storage and aeration equipment

Process Flow: Raw Sewage → Bar Screen → Equalization Tank → Pump → Primary Settler → A-Stage (Anoxic) → O-Stage (Aerobic) → Secondary Clarifier → Disinfection → Treated Effluent Discharge

Technical Specifications

ParameterStandard ModelEnhanced Model
Treatment Capacity1.0 – 80.0 m³/h (24 – 1,920 m³/day)Custom design for >80 m³/h
Influent COD≤ 250 mg/L≤ 400 mg/L
Influent COD (Custom)Custom engineering available for COD > 400 mg/L
Biological ProcessA/O Contact Oxidation
Construction MaterialsSS304/316, Carbon Steel (Q235), Steel+FRP Composite, Full FRP, Reinforced Concrete
InstallationBelow grade (buried) or above grade; trailer-mounted option available
Effluent StandardMeets EU Directive 91/271/EEC & US EPA secondary treatment standards
Automation LevelFully automatic PLC control, no dedicated operator required

Applications

  • Residential communities, villages, and rural townships
  • Hotels, resorts, and hospitality facilities
  • Hospitals and healthcare institutions
  • Office buildings and commercial complexes
  • Highway service areas and railway stations
  • Factories, mining sites, and industrial parks
  • Tourist attractions and scenic areas
  • Slaughterhouses, seafood processing, and food manufacturing wastewater
  • Military installations and remote camps
  • Temporary or emergency wastewater treatment (trailer-mounted)

Why Choose HydropureWater WSZ Series?

The WSZ underground package plant delivers a proven, low-maintenance solution for decentralized wastewater treatment. With its buried installation eliminating visual and noise impact, fully automatic operation requiring zero dedicated staff, and flexible material options to match any site condition or budget, the WSZ series is the go-to choice for municipalities, developers, and industrial operators who need reliable treatment without the complexity of a conventional plant. Whether installed permanently below a landscaped area or mounted on a trailer for rapid deployment, the WSZ system provides consistent, regulation-compliant effluent quality with the lowest total cost of ownership in its class.

Frequently Asked Questions

What is the treatment capacity range of the WSZ series?

The WSZ series covers 1–80 m³/h (24–1,920 m³/day). Custom designs are available for higher flow requirements.

Can the WSZ system be installed above ground?

Yes, the WSZ system is available as buried, above-grade, or trailer-mounted configurations for emergency deployment scenarios.

What construction materials are available?

SS304/316 stainless steel, carbon steel Q235, carbon steel + FRP composite, full FRP cylindrical, and reinforced concrete options are available.

Does the WSZ system require a dedicated operator?

No, the WSZ system features fully automatic PLC control and requires only periodic inspection.

After-Sales Service & Support

  • 12-Month Full Warranty — covers all manufacturing defects in materials and workmanship
  • Lifetime Technical Support — our engineering team provides remote diagnostics and troubleshooting assistance
  • Spare Parts Guarantee — critical spare parts shipped within 48 hours worldwide
  • On-Site Commissioning — factory-trained engineers available for installation supervision and operator training
  • Preventive Maintenance Programs — customized maintenance schedules to maximize equipment lifespan

Proposed for These Projects

Engineering assessments where this product is part of our proposed solution. These projects are not yet delivered.

Project demand matrix →

Ready to Solve Your Wastewater Challenges?

Get a free consultation and customized quote from our engineering team.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us