Proposed treatment for office campus sewage intended for irrigation reuse, subject to source characterisation, flow verification and applicable reuse requirements.
Project Background
The client-supplied design basis is ~200 m³/d for office campus sewage intended for irrigation reuse. Catering and other mixed drains must be verified, together with flow basis, wastewater quality, irrigation exposure and reuse limits. The proposed package treatment train includes pretreatment, biological treatment, clarification, filtration, disinfection, storage and residual management, with final scope subject to client data.
Our Solution
The proposed solution is a buried package treatment plant sized initially against the client-supplied design basis of ~200 m³/d, subject to hydraulic and load verification. A rotary screen removes gross solids, equalisation balances wastewater quality and flow, and anaerobic followed by aerobic biological stages reduce biodegradable organics and nitrogen. Clarification separates biomass, multimedia filtration polishes suspended solids, and ultraviolet disinfection reduces viable organisms before irrigation storage. Settled sludge should be thickened and dewatered, with the clarified filtrate returned to the headworks and conditioned sludge managed under the applicable local requirements. Catering inflows, peak loads, groundwater conditions, reuse exposure and standards may change the pretreatment, process selection, disinfection, storage and residual-management arrangements.
What We Asked First
Please confirm the location, whether burial is required, design flow basis, discharge periods, maximum hourly flow, available equalisation storage, wastewater sources, recent quality data, irrigation method, public-contact exposure, reuse limits, residual-water destination and required supply scope.
Proposed Process Train
- 1Rotary mechanical bar screen
- 2equalisation and flow balancing
- 3anaerobic reactor
- 4aerobic biological treatment
- 5secondary clarification
- 6multimedia filtration
- 7ultraviolet disinfection
- 8irrigation storage
- 9controlled residual management
For Similar Projects
Prepare flow records, wastewater sampling results, source and drainage plans, irrigation details, reuse and discharge requirements, site constraints and a clear equipment, installation, commissioning and training scope.
Ref. A-034. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).