A proposed packaged domestic sewage treatment system for client review, subject to confirmation of the design basis and receiving requirements.
Project Background
The client requires treatment of domestic sewage at a client-supplied design basis of 12–15 m³/d, with the final plant configuration to be confirmed. The proposed package includes a composite reactor, aeration and ventilation equipment, pipework, controls, access covers and inlet and outlet connections. Influent characteristics, discharge limits and the intended effluent destination remain to be provided.
Our Solution
The proposed solution is a packaged biological treatment system suitable for domestic sewage, comprising inlet screening and equalisation, anaerobic biological treatment, aerated secondary treatment, solids separation, filtration and disinfection. The composite reactor provides a compact installation footprint, while aeration and ventilation support biological treatment and the solids separator returns retained biomass to the treatment stages. Disinfection is included as a final barrier before the effluent is routed for disposal or reuse, subject to the applicable receiving requirements. Settled and excess sludge will undergo digestion and mechanical dewatering before temporary storage and authorised collection or disposal. Final process selection, equipment arrangement and treatment objectives will be confirmed after the client provides the influent data, required effluent limits, receiving destination and site information.
What We Asked First
Please confirm the applicable ten discharge parameters and their limits or specification, the receiving water or reuse purpose, whether the stated design flow applies to one complete system or the total project, and the required delivery and installation location.
Proposed Process Train
- 1Incoming domestic sewage screening and flow equalisation
- 2Anaerobic biological treatment in a composite tank
- 3Secondary biological treatment with aeration and settled solids separation
- 4Effluent filtration
- 5Disinfection
- 6Treated effluent collection and disposal or reuse
- 7Digestion and dewatering of accumulated sludge
- 8Storage and periodic collection of dewatered sludge
For Similar Projects
Prepare the effluent limits, reuse or discharge destination, representative influent samples and site information so the treatment train, civil works, installation scope and sludge handling route can be finalised.
Ref. A-036. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).