What treatment does a Bobo-Dioulasso data center need?
A Bobo-Dioulasso data center typically needs two coordinated treatment trains: one for cooling-tower blowdown and another for sanitary or process wastewater. Blowdown should first be reduced through side-stream filtration and higher cooling cycles of concentration, then treated with multi-media filtration, UF and brackish RO for reuse as cooling-tower makeup. The closest Burkina Faso 2026 guide uses a 200–600 mg/L TDS feed envelope, 10–50 mg/L suspended solids in blowdown and a four-stage pretreatment-to-RO train. Because Burkina Faso is landlocked, brine needs an approved buffer, haulage or evaporation route; ZLD should remain a site-specific option rather than the baseline.
Cooling-tower blowdown is the periodic purge used to control dissolved-solids concentration, scaling and corrosion within the circulating cooling-water system. It is a controllable loss of water and dissolved salts, so it belongs directly in the data center water balance and should be evaluated as a reuse feedstock before it is treated as wastewater.
Sanitary wastewater requires a different design basis because it carries organics, biological solids and a distinct disinfection and disposal requirement. Process wastewater may contain site-specific contaminants and should remain separate unless analysis proves compatibility. Cooling blowdown, sanitary flow, process effluent and stormwater must therefore have separate flow diagrams, treatment objectives and permit pathways.
No supplied source establishes Bobo-Dioulasso cooling-water chemistry. The closest documented regional information concerns Ouagadougou and must not be presented as Bobo-Dioulasso measurements. Before equipment selection, the project team needs the makeup-water source, heat-rejection arrangement, measured blowdown flow, required cycles of concentration, seasonal heat load, chemical program, concentrate destination and permitted discharge route.
Build the cooling-water mass balance before choosing equipment
The cooling-water mass balance must precede membrane sizing because facility power rating alone does not determine treatment flow. It must also identify whether the better first intervention is cooling-system optimization, pretreatment, reuse or brine control.
HydropureWater’s 2026 Ouagadougou guide calculates blowdown as evaporation divided by cycles of concentration minus one. Its 50 MW heat-load example at 80% cooling-tower efficiency produces approximately 33,000 kg/h of blowdown at four cycles and 19,900 kg/h at six cycles. The same 2026 guide reports that increasing cycles from four to six cuts blowdown by roughly one-third, making cooling optimization the lowest-capital freshwater-saving step before committing to a membrane train.
Genesis Water Technologies states that a tower operating at four cycles typically loses approximately 25–30% of makeup water through blowdown. Increasing cycles reduces discharge volume but increases scaling, corrosion and water-quality risks, so the target cannot be selected without chemical and source-water analysis.
- Obtain makeup flow, evaporation rate, drift, bypass flow, seasonal heat load and the existing cycles-of-concentration target.
- Reconcile the incoming water, evaporation, drift, blowdown and residual discharge in a documented water balance.
- Model the same operating case at candidate cycles of concentration before sizing side-stream filters, UF or RO.
- Validate the preliminary balance against Bobo-Dioulasso source-water tests and operating data.
| Reference calculation | Cycles of concentration | Blowdown | Source and scope |
|---|---|---|---|
| 50 MW heat load, 80% cooling-tower efficiency | 4 | Approximately 33,000 kg/h | HydropureWater, 2026 Ouagadougou guide |
| 50 MW heat load, 80% cooling-tower efficiency | 6 | Approximately 19,900 kg/h | HydropureWater, 2026 Ouagadougou guide |
| Makeup-water loss through blowdown | 4 | Approximately 25–30% | Genesis Water Technologies, 2026 |
The bidder should also document how automatic chemical dosing responds to changes in heat load, makeup chemistry and cycles of concentration. The outputs of this section remain preliminary until verified with Bobo-Dioulasso-specific source water and operating data.
Characterize the blowdown before the membranes

Membrane selection depends on the chemistry actually entering the treatment train, not on a regional nominal feed envelope. HydropureWater’s 2026 Ouagadougou guide gives a blowdown design envelope of 1,200–6,000 mg/L TDS and 10–50 mg/L suspended solids. Genesis Water Technologies independently reports the same TDS range and explains that it varies with cycles of concentration and source-water quality.
The source-water comparison is also unresolved. HydropureWater’s 2026 Ouagadougou guide cites a 200–600 mg/L TDS and 8–20 mg/L silica envelope as a conservative regional comparison point, but expressly requires site-specific testing before FEED. Those values must not be relabelled as Bobo-Dioulasso results.
| Parameter | Documented reference value | Procurement implication |
|---|---|---|
| Blowdown TDS | 1,200–6,000 mg/L | Require measured range across seasons and tower operating conditions; source: HydropureWater and Genesis Water Technologies, 2026 |
| Blowdown suspended solids | 10–50 mg/L | Specify solids removal and membrane-protection performance; source: HydropureWater and Genesis Water Technologies, 2026 |
| Closest regional source-water TDS | 200–600 mg/L | Preliminary comparison only pending Bobo-Dioulasso testing; source: HydropureWater, 2026 Ouagadougou guide |
| Closest regional source-water silica | 8–20 mg/L | Preliminary comparison only pending Bobo-Dioulasso testing; source: HydropureWater, 2026 Ouagadougou guide |
The laboratory program should cover calcium, magnesium, alkalinity, silica, sulfate, chloride, conductivity, suspended solids, organics and residual treatment chemicals. Each result should identify the analytical method, sampling location and sample date. Biocides, corrosion inhibitors, antiscalants and dispersants concentrate in blowdown and can affect membrane compatibility, biocide performance and discharge quality.
Require a treatment-chemical compatibility statement from each bidder. If the cooling system uses legacy chromate- or phosphate-based programs, the bidder must explain the transition sequence and demonstrate how residuals will be controlled. The proposed multi-media filtration and UF pretreatment should be matched to the measured chemistry, not merely to flow.
Select a pretreatment and reuse train
The practical baseline is side-stream solids control followed by media filtration, PVDF UF and brackish RO, with chemical conditioning and concentrate handling included in the same scope. HydropureWater’s 2026 Ouagadougou guide recommends this four-stage sequence for Burkina Faso conditions, but Bobo-Dioulasso feed testing must govern final sizing.
For pretreatment, HydropureWater’s 2026 guide specifies multi-media filtration with automatic backwash and turbidity below 3 NTU. Genesis Water Technologies reports self-cleaning spiral filters at 10–25 microns, with capacity equivalent to 1–5% of circulating flow. For UF, Genesis reports pore sizes of 0.01–0.1 microns, operation at 10–30 psi and 90–95% recovery. HydropureWater specifies 0.03–0.1 micron PVDF, 90–95% recovery, 10–30 psi and SDI15 below 3.
| Process | Documented operating basis | Bid requirement |
|---|---|---|
| Multi-media filtration | Automatic backwash; turbidity below 3 NTU | Source: HydropureWater, 2026 Ouagadougou guide |
| Self-cleaning side-stream screen | 10–25 microns; capacity equal to 1–5% of circulating flow | Source: Genesis Water Technologies, 2026 |
| PVDF UF | 0.03–0.1 micron; 10–30 psi; 90–95% recovery; SDI15 below 3 | Source: HydropureWater, 2026 Ouagadougou guide |
| Conventional blowdown RO | 50–85% recovery; 150–400 psi | Source: Genesis Water Technologies, 2026 |
| BWRO permeate and concentrate | Permeate 10–50 mg/L TDS; concentrate 5,000–8,000 mg/L TDS | Source: HydropureWater, 2026 Ouagadougou guide |
Conventional recovery must be quoted at the project feed chemistry and temperature. IDE reports that conventional BWRO commonly reaches 75–80% recovery before scaling becomes unmanageable. Its MAXH₂O desalter example operated at around 95% recovery and reduced silica in the permeate to approximately 1 mg/L, but that example also used controlled salt precipitation and a different high-recovery process architecture.
Conventional staged or antiscalant-intensive RO is generally simpler to procure and operate. Higher recovery can reduce freshwater demand and concentrate volume, but it requires explicit control of scaling chemistry, salt precipitation, cleaning and solids handling. Bid comparison should therefore include permeate and concentrate flow, concentrate chemistry, chemical consumption, cleaning frequency and concentrate route—not recovery alone.
The candidate train should incorporate a PVDF ultrafiltration system for blowdown pretreatment and an industrial reverse osmosis system for cooling-tower reuse, with automatic dosing tied to measured feed chemistry.
Plan the brine route before committing to high recovery

Burkina Faso’s landlocked geography makes concentrate management a design constraint, not an accessory. HydropureWater’s 2026 Ouagadougou guide states that there is no marine outfall for brine concentrate and identifies an on-site buffer tank followed by licensed haulage to a registered disposal site or a lined evaporation pond as the baseline pathways.
The same guide gives a conservative 2,000 mg/L TDS benchmark, a temperature rise of no more than 5 °C, pH from 6.0 to 9.0 and residual chlorine below 0.5 mg/L. These are preliminary design benchmarks pending site-specific ONEA permit confirmation, not confirmed Bobo-Dioulasso limits.
| Decision | Evidence-supported basis | Required action |
|---|---|---|
| Direct disposal of RO concentrate | Concentrate at 5,000–8,000 mg/L TDS; no marine outfall in landlocked Burkina Faso | Do not assume a permitted outlet; source: HydropureWater, 2026 Ouagadougou guide |
| Buffer and licensed haulage | Identified baseline pathway | Name licensed hauler, registered site, truck route and operating owner |
| Lined evaporation pond | Identified baseline pathway | Obtain site-specific dry-season evaporation and meteorological data before FEED |
| MVC concentration | 95–98% recovery and distillate below 10 mg/L TDS | Evaluate for water-scarce or no-discharge conditions; source: Genesis Water Technologies, 2026 |
| Permit benchmarks | 2,000 mg/L TDS, ΔT no more than 5 °C, pH 6.0–9.0, residual chlorine below 0.5 mg/L | Confirm with ONEA; source: HydropureWater, 2026 Ouagadougou guide |
HydropureWater states that the project-level environmental impact assessment under the Code de l’environnement and ANEVE requirements must be confirmed with local counsel; current threshold tables and decree references should not be asserted without that review. The project should sequence the decision as follows: confirm the permitted discharge route, calculate concentrate flow and chemistry, reserve buffer capacity, validate the selected haulage or evaporation route, and only then compare conventional RO with higher-recovery salt-management processes.
Genesis Water Technologies reports MVC energy consumption of 15–25 kWh per 1,000 US gallons of distillate. MVC or ZLD should therefore be evaluated against local power availability, operator capability and the cost of maintaining a dependable brine route. Every bidder must name the concentrate destination, operating responsibility, disposal owner and evidence that the route will remain viable throughout the project life.
Size the package by facility class and expected load
Preliminary skid scale and budget must be tied to an explicit water-balance case. HydropureWater’s 2026 Ouagadougou guide uses approximately 50 m³/day of BWRO at five cycles for a 2–5 MW colocation reference case, with a total installed scope of $400,000–$800,000. For a 10–20 MW hyperscale reference case, it uses a 200–300 m³/day BWRO train with side-stream filtration, UF, chemical dosing and concentrate handling, at $1.2 million–$2.5 million installed.
| Reference case | Treatment scope | Installed reference cost |
|---|---|---|
| 2–5 MW colocation | Approximately 50 m³/day BWRO at CoC 5 plus side-stream filtration | $400,000–$800,000 |
| 10–20 MW hyperscale | 200–300 m³/day BWRO, side-stream filtration, UF, chemical dosing and concentrate handling | $1.2 million–$2.5 million |
| 50,000 GPD blowdown RO | Standalone RO reference | $250,000–$500,000 |
All costs above are reference-case estimates from HydropureWater’s 2026 Ouagadougou guide or Genesis Water Technologies’ 2026 article, not Bobo-Dioulasso quotations. They should not be transferred without adjustment for local civil work, taxes, concentrate logistics, power upgrades, land and site-specific permits unless expressly included.
HydropureWater’s 2026 guide reports operating cost of $1.50–$3.00 per thousand gallons treated, with chemical dosing adding another 10–15%. Genesis reports the same treatment-cost interval and includes energy, chemicals, membrane replacement and maintenance. A bidder should state the treatment basis, currency, power tariff, membrane assumptions and disposal charge behind every operating-cost line.
Use these figures to establish budget order and commercial comparability, not to select equipment. The controlling quantities remain verified makeup flow, evaporation, cycles of concentration, source chemistry and the permitted reuse target.
Include sanitary and process wastewater where it applies

The cooling-blowdown package is not a complete data center wastewater solution. Sanitary wastewater must be classified separately and assigned to sewer connection, on-site treatment or a permitted combination. Process wastewater should remain a separate line until its contaminants, flow variability and reuse or disposal destination are established.
Where on-site biological treatment is justified, the WSZ package plant is documented at 1–80 m³/h, while the MBR system is documented at 10–2,000 m³/day. These capacities must be matched to the verified sanitary flow, available footprint, effluent objective and local operating capability. The bid should define biological loading, sludge production, odor control, disinfection and operator attendance rather than compare package names alone.
Cooling blowdown and sanitary influent should not be combined merely because both originate within the facility. Blowdown treatment targets dissolved salts, scaling minerals and concentrated treatment chemicals; sanitary treatment targets organics and biological solids. Combining them can increase membrane loading, complicate recovery and transfer the sanitary permit conditions into the cooling-water train.
Require a separate water-by-water stream diagram and capacity table covering sanitary wastewater, process wastewater, stormwater, cooling makeup, cooling blowdown, sludge and chemical waste. Each stream should identify flow variability, treatment objective, destination, operating owner and permit dependency.
The MBR treatment option and underground integrated sewage treatment option should therefore be evaluated as separate sanitary modules rather than added automatically to the BWRO skid.
Turn the concept into a bid-ready supplier brief
A comparable bid must fix the design basis, performance guarantees and concentrate responsibility before commercial evaluation. Unqualified recovery percentages are not acceptable because they conceal feed assumptions and the resulting brine load.
| Bid item | Minimum submission requirement |
|---|---|
| Guaranteed performance | Treatment flow, feed-water range, permeate quality, recovery, concentrate flow and concentrate TDS |
| Design basis | Water analysis, source-water variability, temperature range and chemical-storage requirements |
| Operating philosophy | Backup-power approach, membrane replacement assumptions and operator staffing |
| Monitoring | Automatic SCADA export of flow, pH, conductivity and temperature |
| Lifecycle cost | Energy, chemicals, membrane replacement, maintenance and concentrate disposal, with treatment basis and currency |
| Acceptance | FAT, site acceptance, membrane-cleaning intervals, operator training and spare-parts strategy |
| Concentrate responsibility | Written matrix naming the destination, disposal owner, operator and licensed parties where applicable |
HydropureWater’s 2026 Ouagadougou guide states that manual logs do not survive an ANEVE audit and requires automatic export of flow, pH, conductivity and temperature records. The project should specify the data format, retention period, access rights and integration with the data-center control system.
Factory and site acceptance should test the guaranteed permeate flow and quality, recovery, concentrate flow and chemistry, automatic controls, chemical dosing, power-transfer response, alarms, data export and operator procedures. The package should also include a written concentrate-disposal responsibility matrix, supported by treatment spares, valves and filter media holding periods.
The selected route must also be checked against the coagulant dosing system design criteria where coagulation is proposed, and against media filtration design principles for the pretreatment barrier.
Frequently Asked Questions
What will a Bobo-Dioulasso data center wastewater package cost?
For preliminary budgeting, HydropureWater’s 2026 Ouagadougou guide places a 2–5 MW colocation reference scope at $400,000–$800,000 installed and a 10–20 MW hyperscale reference scope at $1.2 million–$2.5 million installed. Neither is a Bobo-Dioulasso quotation. Request a site-specific price stating whether it includes pretreatment, UF, RO, dosing, tanks, civil work, installation, commissioning, concentrate logistics and taxes. Also request the treatment basis and currency behind the operating-cost estimate, because HydropureWater reports $1.50–$3.00 per thousand gallons treated, with chemical dosing adding another 10–15% in its 2026 reference case.
How should a supplier be selected for cooling-blowdown reuse?
Select on guaranteed performance and evidence, not on the highest recovery percentage. Require a feed-water range, permeate TDS, recovery at that feed, concentrate flow, concentrate TDS and chemical consumption. The proposal must also provide O&M pricing and a named concentrate route with its licensed hauler or disposal site where applicable. HydropureWater’s 2026 guide reports BWRO concentrate at 5,000–8,000 mg/L TDS, so the concentrate guarantee is as important as the permeate guarantee.
Can facility MW be used to size the treatment package?
No. MW does not directly establish treatment flow. The buyer must confirm makeup flow, evaporation, drift, bypass, cycles of concentration, source chemistry, seasonal heat load and the cooling-tower makeup reuse target. HydropureWater’s 2026 Ouagadougou mass balance illustrates why: its 50 MW example at 80% cooling-tower efficiency produces approximately 33,000 kg/h of blowdown at four cycles and 19,900 kg/h at six cycles. The vendor should size the skid from the verified water balance and guarantee performance at the stated feed conditions.
What permits and environmental assessments apply to brine and discharge?
Current ANEVE and ONEA requirements must be confirmed locally. HydropureWater’s 2026 Ouagadougou guide cites a project-level EIA under the Code de l’environnement and ANEVE requirements, but says current thresholds and decree references must be checked with local counsel. It also treats 2,000 mg/L TDS, a temperature rise no more than 5 °C, pH 6.0–9.0 and residual chlorine below 0.5 mg/L as conservative benchmarks pending site-specific ONEA confirmation. These values are not confirmed Bobo-Dioulasso permit limits and should not be used to defer the regulatory review.