Set the discharge and reuse objective
The first decision for an effluent treatment plant in Bordeaux is whether the wastewater will enter the public sewer, receive dedicated on-site treatment, or be reclaimed for reuse. For industrial flows, DAF can pretreat suspended solids, oil, grease and colloidal material; MBR combines activated sludge with filtration below 1 μm; and UF removes bacteria, colloids and suspended solids without chemicals. The appropriate train depends on verified flow, pH, COD, nutrients, oil and grease, contaminants and receiving-route requirements. HydropureWater's published ranges are 4–300 m³/h for DAF, 10–2,000 m³/day for MBR and 2,000–40,000 L/h for UF, but those figures do not establish Bordeaux site compliance.
Start the procurement record with one precise receiving route: public sewer, direct discharge under site-specific requirements, or defined reuse. The supplied evidence does not establish current Bordeaux-specific discharge limits, so do not infer them from general equipment literature or a supplier's generic compliance statement.
For each route, obtain the applicable permit conditions, sewer acceptance criteria, connection requirements or reuse specification from the site owner and relevant authority. Identify who will approve the route, what monitoring is required and whether acceptance depends on instantaneous concentration, daily load, sampling frequency or another defined test basis.
The University of Twente thesis Direct nanofiltration of wastewater treatment plant effluent identifies nanofiltration as a candidate polishing option for WWTP effluent intended for agricultural or direct or indirect potable use. That research does not establish acceptance at a particular Bordeaux site, nor does it replace project-specific wastewater testing and approval. The industrial effluent treatment plant selection method therefore begins with the receiving route and required water quality, not with a preferred machine.
Complete this objective before selecting equipment:
- Record the receiving authority, permit reference, applicable limits and required analytical methods.
- Define whether reuse concerns process water, washing, irrigation or potable-related application; do not use an undefined “reuse” label.
- List the final water-quality specification, test methods, sampling points and acceptance authority.
- State treatment objectives, including pollutant loads rather than concentrations alone.
Build the wastewater characterisation brief
Peak flow, sustained load and wastewater chemistry must be defined for the actual production operation before a quotation can be compared reliably. Request representative laboratory results and operating records rather than a generic “typical industrial wastewater” description.
For wine-related effluent, Matevi France reports pH of 4.1–6.5, TSS of 0.15–1.5 g/L, COD of 8–35 g/L and BOD5 of 4–21 g/L. These values apply to wine-making effluent and must not be transferred automatically to another Bordeaux industry. The same source reports that 50–60% of wine effluent volumes are produced during grape harvest and the first rackings, making seasonal concentration and flow critical to the design basis.
| Design input | Evidence or request to obtain | Why it changes procurement |
|---|---|---|
| Flow profile | Flow records, average flow, peak flow, batch discharges, operating hours and seasonal variation | Determines equalisation and whether the quoted duty represents feed, clarified flow or filtrate flow |
| Organic load | COD and BOD5 results; for wine effluent, Matevi France reports pH 4.1–6.5, TSS 0.15–1.5 g/L, COD 8–35 g/L and BOD5 4–21 g/L | Sets biological loading and the need for pretreatment |
| Physical contaminants | TSS, oil and grease, grit, screenings and colloidal material | Indicates whether DAF, screening or clarification should precede biological treatment or membranes |
| Nutrients and process chemistry | Nitrogen and phosphorus compounds, pH, temperature and production-specific contaminants | Defines biological feed requirements, chemical dosing and temperature constraints |
| Operating history | Prior results, bypasses, downtime, cleaning cycles and production changes | Exposes peak events and assumptions that a catalog duty may omit |
Use the industrial DAF versus lamella pretreatment as a process-comparison reference, not as a source of Bordeaux wastewater values. Before finalising the duty, obtain representative laboratory results, flow records, peak and sustained loads, prior operating history, bypasses and downtime records.
Compare the feasible treatment routes

The receiving route determines the treatment functions required, so ensure each technology is evaluated against specific site constraints. Sewer connection is feasible only after the authority confirms acceptance conditions for the actual wastewater. The supplied evidence contains no verified Bordeaux-specific sewer limits, so a supplier's sewer statement should not be treated as approval.
DAF is a candidate when suspended solids, oil, grease or colloidal material require removal before clarification or biological treatment. HydropureWater lists 4–300 m³/h across 13 standard models for industrial and municipal pretreatment applications. That published range supports an initial commercial screen only; it does not establish performance on the project wastewater. The available DAF pretreatment system should therefore be tested against the measured load, expected wastewater characteristics and pretreatment duty.
MBR is relevant where biological treatment and fine membrane separation are both required. HydropureWater lists 10–2,000 m³/day capacity and filtration below 1 μm for its integrated MBR wastewater treatment system. Evaluate it through MBR versus conventional activated sludge, focusing on the actual wastewater, treatment objectives, membrane fouling, cleaning and residual-sludge handling.
UF is a candidate for solids-, colloid- and bacteria-sensitive reuse applications or for RO pretreatment. HydropureWater lists 2,000–40,000 L/h flow, 0.03 μm PVDF membranes, automatic backwash and air scour, and turbidity acceptance up to 300 ppm. These specifications do not replace the receiving-route specification or verify the required reuse outcome.
| Route or stage | Primary function | Use it when | Evidence boundary |
|---|---|---|---|
| Public sewer | Transfer wastewater to the public network | The sewer authority confirms that the actual wastewater and discharge route are acceptable | No Bordeaux-specific sewer limits are established in the supplied evidence |
| DAF pretreatment | Remove suspended solids, oil, grease and colloidal material | Characterisation shows contaminants that should be removed before clarification or biological treatment | HydropureWater's published range is 4–300 m³/h across 13 models; suitability remains wastewater-specific |
| MBR biological treatment | Combine activated sludge with membrane separation | Biological treatment and fine membrane separation are required | Published capacity is 10–2,000 m³/day and filtration is below 1 μm |
| UF polishing | Remove solids, colloids and bacteria without chemicals | A defined reuse or RO-pretreatment specification calls for membrane polishing | Published flow, membrane, cleaning and turbidity specifications do not prove project acceptance |
| Constructed wetland research | Investigate micropollutant removal from WWTP effluent | It remains research for route development | Wageningen University's thesis was published on 23 September 2022 and does not prove suitability for a Bordeaux industrial site |
Size the treatment train and auxiliary systems
Equalisation, biological and membrane stages must be sized based on peak and sustained flows and loads, rather than average flow alone. A batch discharge may control equalisation volume, DAF feed demand or membrane operating sequence even when its share of annual volume is small. State whether batch storage, duty cycling and off-hour operation are included.
The Matevi France wine-effluent source identifies screening before evaporation and describes activated sludge as a biological process. These are process precedents for wine wastewater, not Bordeaux design standards. For another industry, the equivalent decisions must follow from its characterisation and treatment objective.
Specify the complete auxiliary scope: inlet screening, equalisation and mixing, chemical dosing, aeration, sludge collection and handling, controls, electrical supply, utilities, bypass provisions and maintenance access. The available rotary mechanical bar screen and automatic chemical dosing system can be evaluated within that wider scope, but neither should be selected without the upstream wastewater characteristics and treatment train.
For every quoted flow, identify whether it is wastewater feed, clarified flow or filtrate flow. Also state operating hours, duty cycle, batch-discharge assumptions, hydraulic recovery, membrane cleaning, fouling management, chemical consumption, sludge output and bypass conditions.
Ask suppliers to disclose design assumptions: peak and sustained hydraulic loads, contaminant loads, equalisation strategy, pretreatment performance, membrane cleaning frequency, sludge handling, utility availability, control philosophy and operating staff requirements. Where the supplier has not demonstrated operation on comparable wastewater, require that limitation to appear in the quotation.
Issue a comparable supplier and acceptance brief

A comparable quotation must state the same wastewater, receiving route, design duty and acceptance method. Require every supplier to identify design flow, wastewater basis, operating hours, duty cycle, treatment objectives, utilities, controls, guarantees, exclusions, commissioning obligations and performance-test method.
| Supplier deliverable | Required response before technical evaluation | Acceptable evidence |
|---|---|---|
| Design basis | Flow profile, pollutant loads, wastewater characteristics and intended receiving route | Supplier repeats and accepts the buyer's stated basis, including exclusions |
| Equipment scope | Process stages, capacities, materials, controls, utilities and auxiliaries | Equipment list with defined flow basis, operating hours and duty cycle |
| Commercial breakdown | Equipment, civil works, installation, utilities, controls, commissioning, performance testing and sludge handling | Itemised quotation with exclusions and assumptions |
| Performance guarantee | Parameter, limit, test method, sampling basis and acceptance condition | Verifiable method tied to the stated wastewater and receiving route |
| References | Similar wastewater, comparable hydraulic and contaminant duties, same receiving route and demonstrated handover | Reference scope and supplier's role, checked against comparable duties |
| Commissioning and handover | Site tests, operator training, spares, maintenance and documentation | Agreed handover deliverables and responsibilities |
Request itemised pricing for equipment, civil works, installation, utilities, controls, commissioning, performance testing, sludge handling and exclusions. Compare references against similar wastewater, comparable hydraulic and contaminant duties, the same receiving route, relevant guarantees and demonstrated handover.
Treat a general statement that equipment is “compliant” as incomplete unless the supplier identifies the requirement, applies it to the stated wastewater and receiving route, and provides a verifiable acceptance method. The comparison structure used for MBR versus activated sludge for EV wastewater is relevant only if the reference wastewater and route are sufficiently comparable; the product name itself is not evidence of equivalence.
Before accepting a guarantee, confirm the test duration, sampling frequency, laboratory methods, parameter averaging or maximum-value rules, rejected-feed conditions and remedy for failure. Attach the characterisation results and permit or reuse requirements to the guarantee schedule.
Frequently Asked Questions
Why do published equipment capacities not establish the required size of a Bordeaux wastewater treatment plant?
Published capacities describe equipment envelopes, not site demand. The required size depends on the verified peak and sustained flows, pollutant loads, batch profile, wastewater characteristics, operating hours and receiving-route objectives. HydropureWater's DAF, MBR and UF ranges can screen suppliers, but the buyer's wastewater and permit documents must establish the actual duty.
How should DAF, MBR and UF be compared for an industrial ETP in Bordeaux?
Compare them by treatment function. DAF is pretreatment for suspended solids, oil, grease and colloidal material; MBR combines biological treatment with membrane separation; UF provides solids, colloid and bacteria removal for specified polishing or reuse applications. The integrated MBR wastewater treatment system is therefore not a substitute for defining pretreatment and reuse requirements.
What should a buyer request before accepting a supplier's price and performance guarantee?
Request the wastewater characterisation, flow records, receiving-route conditions, treatment objectives, design basis, utility requirements, controls scope, exclusions, commissioning plan