Define the Nansana treatment objective
A Nansana data center should compare three routes for wastewater and cooling blowdown treatment: compliant discharge, partial reuse for toilet flushing or landscaping, and advanced treatment for cooling-tower make-up. The likely technical train includes side-stream filtration, ultrafiltration, brackish reverse osmosis and chemical dosing, with concentrate buffered and managed on site because Uganda has no marine outfall. The supplied Kampala design envelope uses 200–600 mg/L borehole TDS and targets CoC 5–6, but Nansana-specific source water, permit limits and discharge points must be verified before equipment is selected.
Start by separating cooling-tower blowdown, domestic sewage and process wastewater. These streams have different contaminants, reuse destinations and regulatory duties, so combining them into one inlet flow can obscure the treatment required for each stream. Cooling blowdown requires solids removal, corrosion and biocide control, and a defined fate for concentrated salts. Domestic sewage requires treatment appropriate to its discharge or reuse endpoint. Process wastewater must be assessed against the specific production chemistry rather than assumed to behave like blowdown.
The first decision is whether the project will discharge, partially reuse, or recover the blowdown as cooling-tower make-up. That choice depends on the confirmed outlet, freshwater constraint, facility heat load, future expansion and whether the site can carry the electrical and civil requirements of the selected route. A permitted discharge remains conditional on site-specific approval; a reuse route still needs a defined receiving demand and water-quality target.
The supplied Kampala/Lake Victoria screening basis is 200–600 mg/L TDS and 8–20 mg/L silica for municipal and shallow-borehole feed, with Lake Victoria surface water described as lower in TDS but more turbid and microbiologically variable after rainfall (HydropureWater field data, 2026). These values are not verified Nansana source data. Before FEED, request source-water chemistry, feed temperature, electricity-availability data, daily flow profiles and the proposed discharge point, then confirm the Uganda NEMA wastewater compliance pathway with the relevant authority.
| Input or decision | Evidence currently available | What Nansana must verify |
|---|---|---|
| Cooling source-water screening | 200–600 mg/L TDS and 8–20 mg/L silica for Kampala municipal and shallow-borehole feed (HydropureWater field data, 2026) | Representative Nansana samples across seasons and the selected source |
| Discharge route | Schedule 6 screening values include TDS ≤2,000 mg/L, pH 6.0–9.0, residual chlorine <0.5 mg/L and temperature rise ≤5 °C (HydropureWater field data, 2026) | Exact permit conditions, receiving point, sewer capacity and cooling or blending requirement |
| Reuse route | UV or chlorine dioxide is identified for non-cooling reuse polish (HydropureWater field data, 2026) | Reuse demand, health criteria, storage and downstream distribution requirements |
| Cooling make-up recovery | BWRO is the principal advanced-treatment route in the supplied Uganda design basis | Make-up-water quality, recovery, concentrate destination and power availability |
For the wider decision framework, see how to compare discharge and reuse routes for a data center.
Compare discharge, partial reuse and cooling reuse
Compliant discharge has the lowest treatment complexity, but it remains subject to the confirmed Nansana permit and the supplied Schedule 6 screening values: TDS ≤2,000 mg/L, pH 6.0–9.0, residual chlorine <0.5 mg/L and temperature rise ≤5 °C (HydropureWater field data, 2026). The route should include suspended-solids removal, dechlorination where chlorine is used, temperature management and monitored discharge rather than direct release of untreated blowdown.
Partial reuse can match treated blowdown to toilet-flushing or landscaping demand. The supplied Uganda design basis identifies UV or chlorine dioxide as secondary-disinfection options for non-cooling reuse, alongside solids removal (HydropureWater field data, 2026). Partial reuse reduces discharge and freshwater demand, but it does not eliminate the need to manage residual dissolved salts and treatment chemicals. It also requires confirmation that the reuse demand is reliable enough to avoid producing water that has nowhere to go during shutdowns.
Cooling-tower make-up recovery requires the most complete treatment train and the strongest concentrate-management plan. Side-stream filtration and UF protect the membranes, while brackish reverse osmosis supplies low-TDS permeate. Conventional BWRO is generally limited to 75–80% recovery before scaling becomes unmanageable (IDE Tech, 2026). Pushing beyond that point requires a different recovery philosophy rather than simply increasing membrane pressure or recovery (IDE Tech, 2026).
Operating optimization should precede capital expansion. In the supplied 50 MW example, evaporation is approximately 99,537 kg/h; changing from CoC 4 to CoC 6 reduces blowdown from about 33,000 kg/h to 19,900 kg/h (HydropureWater field data, 2026). The reduction comes from operating the cooling system at a higher concentration, but biological growth, scaling and chemical control must remain manageable. Confirm CoC through site trials and water chemistry rather than adopting it solely from the reference case.
| Decision test | Compliant discharge | Partial reuse | Cooling make-up recovery |
|---|---|---|---|
| Primary objective | Meet the confirmed discharge permit | Meet a defined non-cooling reuse specification | Reduce freshwater make-up while controlling cooling chemistry |
| Typical unit operations | Solids removal, dechlorination where needed, temperature control and monitoring | Solids removal, filtration and secondary disinfection | Side-stream filtration, UF, BWRO, chemical dosing and concentrate handling |
| Main operating risk | Permit exceedance or inadequate sewer and receiving-water capacity | No receiving demand, microbiological control or reuse-water quality failure | Membrane scaling, concentrate accumulation and power interruption |
| Concentrate obligation | Lower salt load, but discharge quality still requires confirmation | Remaining salts must remain within the reuse specification | Explicit buffer and approved final destination are required |
| Selection condition | Use when the confirmed outlet and permit support the route | Use when measured non-cooling demand matches production | Use when cooling-water chemistry, recovery and concentrate handling can be demonstrated |
The data center blowdown discharge and reuse decision matrix provides a useful external comparison, but the Nansana permit and site inputs must remain the controlling evidence.
Size the blowdown balance before quoting equipment

The blowdown flow must come from the facility heat load and operating cycles of concentration before equipment is quoted. For the supplied relationship, blowdown equals evaporation divided by (cycles of concentration minus one). In the 50 MW reference case at 80% cooling-tower efficiency, evaporation is approximately 99,537 kg/h; CoC 4 produces about 33,000 kg/h of blowdown, while CoC 6 produces about 19,900 kg/h (HydropureWater field data, 2026).
Use CoC 5–6 as the preliminary comparison range for the Kampala/Nansana design, then confirm whether biological growth, scaling and chemical control remain manageable at the intended operating point (HydropureWater field data, 2026). Measure evaporation and blowdown across the operating range rather than assuming the reference relationship captures all site losses. Verify make-up flow, blowdown duration, simultaneous blowdown events and future heat-load expansion.
- Establish the design heat load and corresponding evaporation rate.
- Select the permitted operating range for cycles of concentration.
- Calculate preliminary blowdown and make-up requirements from the measured water balance.
- Apply measured peak-hour and continuous-flow profiles to equipment sizing.
- Check the selected recovery rate against concentrate volume and final destination.
The supplied reference cases indicate a 50 m³/day BWRO skid for a 2–5 MW facility and a 200–300 m³/day train for a 10–20 MW facility (HydropureWater field data, 2026). These are preliminary scopes, not Nansana selections. Equipment sizing must reflect measured peak blowdown, operating hours, redundancy and future expansion.
| Design step | Supplied basis | FEED requirement |
|---|---|---|
| Heat load and evaporation | 50 MW at 80% efficiency gives approximately 99,537 kg/h evaporation (HydropureWater field data, 2026) | Nansana design heat load and measured operating profile |
| Cycles of concentration | CoC 4 gives about 33,000 kg/h blowdown; CoC 6 gives about 19,900 kg/h (HydropureWater field data, 2026) | Confirmed control range after chemistry and operating review |
| Reference treatment capacity | 50 m³/day BWRO for 2–5 MW; 200–300 m³/day for 10–20 MW (HydropureWater field data, 2026) | Calculated peak and average demand with future expansion allowance |
A separate data-center blowdown treatment sizing comparison can support vendor discussions, but it cannot replace the Nansana water balance.
Match the treatment train to water chemistry
Side-stream filtration is the first barrier for blowdown solids and must precede the membrane train. The supplied blowdown contains 10–50 mg/L suspended solids from corrosion products and biofilm fragments, along with accumulated biocides and corrosion inhibitors (HydropureWater field data, 2026). Filtration protects the downstream UF and RO membranes while reducing the solids load that otherwise increases cleaning frequency and chemical demand.
The supplied UF benchmark uses 0.03–0.1 μm pores, 90–95% recovery and 10–30 psi operating pressure, with SDI15 held below 3 for downstream RO protection (HydropureWater field data, 2026). A hollow-fiber UF system for RO pretreatment should therefore be assessed against feed variability, backwash requirements, recoverability and cleaning access, rather than selected only by nominal flow.
For cooling make-up, the supplied BWRO benchmark is 75–85% recovery, producing 10–50 mg/L TDS permeate. Concentrate is described at 5,000–8,000 mg/L TDS and must not enter an unregulated storm drain or surface-water outfall (HydropureWater field data, 2026). An industrial RO system for cooling-water recovery must be guaranteed against the measured feed composition, not only the preliminary Kampala envelope.
Chemical control forms part of the treatment scope. The supplied train includes antiscalant, biocide and pH adjustment, with automatic records of flow, pH, conductivity and temperature for the NEMA audit trail (HydropureWater field data, 2026). Include LSI and RSI control, which the source places in the −0.5 to +0.5 band, and verify that the selected dosing strategy is compatible with the permitted discharge or reuse target.
| Barrier | Supplied parameter benchmark | Supplier acceptance check |
|---|---|---|
| Side-stream filtration | Blowdown suspended solids of 10–50 mg/L before the membrane train (HydropureWater field data, 2026) | Duty at measured peak flow, specified solids loading and automatic cleaning |
| Ultrafiltration | 0.03–0.1 μm pores, 90–95% recovery, 10–30 psi and SDI15 below 3 (HydropureWater field data, 2026) | Guaranteed permeate quality, backwash sequence and recovery from power loss |
| Brackish RO | 75–85% recovery and 10–50 mg/L TDS permeate (HydropureWater field data, 2026) | Guarantee against site feed chemistry and stated cleaning method |
| Chemical control | Antiscalant, biocide and pH adjustment with SCADA export (HydropureWater field data, 2026) | Complete materials list, dosing range, interlocks and automatic records |
| Concentrate | 5,000–8,000 mg/L TDS in the supplied BWRO design basis (HydropureWater field data, 2026) | Quantity, composition basis, storage and final destination |
Lake Victoria feed-water chemistry should be checked as a possible source rather than assumed: the supplied research describes lower TDS but higher turbidity and microbial load after rainfall, requiring dedicated coagulation ahead of media filtration if that source is selected (HydropureWater field data, 2026).
Plan concentrate and reliability before FEED closes

Concentrate management can determine whether the selected treatment route is deliverable. Because Uganda is landlocked, the supplied design basis assumes an on-site buffer tank plus either a licensed hauler to a registered disposal site or a lined evaporation pond (HydropureWater field data, 2026). The buyer must obtain written confirmation that the proposed hauler, receiving site and handling method are acceptable; the research does not verify a Nansana destination.
A small MVC polisher is the high-recovery option identified for water-scarce or zero-liquid-discharge sites. The supplied research places ZLD polish at $3M–$8M, while a 200–300 m³/day BWRO train with side-stream filtration, UF, chemical dosing and concentrate handling is placed at $1.2M–$2.5M installed (HydropureWater field data, 2026). These figures support preliminary budget bands only; Nansana quotations must state capacity, recovery, feed assumptions, civil works and concentrate exclusions.
Reliability is part of the treatment design. The supplied Kampala guidance identifies unreliable grid power as a constraint and calls for generator-backed pumps, blowers and SCADA, including membrane-system ride-through through a 30-second transfer event (HydropureWater field data, 2026). Verify that controls, valves, chemical storage and safe restart sequences remain available during power and process interruptions.
Before accepting a proposal, require the supplier to state the concentrate quantity, final destination, maximum recovery, cleaning method, redundancy and SCADA export. The automatic chemical dosing system scope should identify chemical compatibility, interlocks and records; permit requirements do not by themselves establish chemical compatibility.
Frequently Asked Questions
How should treatment capacity be sized for a Nansana data center?
Size from the measured heat load, evaporation, selected cycles of concentration and hourly blowdown profile, not from installed facility power alone. The supplied 50 MW example provides a preliminary relationship, but Nansana must confirm peak blowdown, operating duration and future expansion before selecting UF, RO or storage capacity.
What budget should be allowed for wastewater and cooling-blowdown treatment?
Budget depends on the selected route, measured capacity and recovery. The supplied reference scopes give preliminary bands of $400,000–$800,000 for a 2–5 MW installation and $1.2M–$2.5M for a 10–20 MW BWRO train, while ZLD polish is listed at $3M–$8M (HydropureWater field data, 2026). Request itemized quotations stating feed assumptions, recovery, civil works, power backup and concentrate disposal.
How should suppliers be selected for Nansana treatment equipment?
Compare demonstrated guarantees rather than brochure capacity: measured feed flow and chemistry, permeate quality, recovery, cleaning method, redundancy, power-interruption performance and SCADA export. Also require the concentrate quantity and final destination in writing, because a membrane proposal without an accepted brine route is incomplete.
What must be verified before claiming Uganda NEMA wastewater compliance?
Confirm the applicable NEMA permit, EIA requirement, discharge point, sewer capacity and site-specific limits with the relevant authority. The supplied Kampala guidance identifies Schedule 6 values and an EIA framework, but it does not verify Nansana’s exact permit or receiving conditions. Attach the approved permit and monitoring plan to the procurement specification.