Proposed industrial wastewater treatment system – Ethiopia

A proposed industrial wastewater treatment solution for Ethiopia, with final process selection subject to client-supplied wastewater and discharge data.

Project Background

The client is requesting an industrial wastewater treatment solution in Ethiopia. Wastewater source, industry, daily and peak flow, influent quality, and discharge or reuse targets have not yet been provided. The proposed design will therefore be adjusted after the client confirms the project status, treatment basis, required equipment scope, and applicable receiving or reuse requirements.

Our Solution

Our complete proposed solution begins with a rotary mechanical bar screen to remove coarse solids, followed by an equalisation tank to balance variable industrial loads and provide controlled feeding. Multimedia filtration and activated-carbon polishing can be added where suspended solids, colloids, colour, or organic contaminants require it. An MBR system is proposed for biological treatment and membrane separation, reducing sludge volume and providing a high-quality clarified effluent suitable for reuse assessment. Chlorine dioxide or UV disinfection can be applied where pathogen control is required. Sludge is to be dewatered using a plate and frame filter press, with residual disposal assessed against local requirements. Final equipment, sizing, and treatment targets will be confirmed after the client provides the wastewater basis.

What We Asked First

Please confirm whether the project remains active, the wastewater source and industry, daily and peak flow, influent pollutant data, discharge or reuse targets, project stage, and the required equipment scope.

Proposed Process Train

  1. 1Rotary mechanical bar screen
  2. 2Equalisation and flow-balancing tank
  3. 3Multimedia filtration and activated-carbon polishing as required
  4. 4MBR membrane bioreactor
  5. 5Chlorine dioxide or UV disinfection
  6. 6Reuse or discharge assessment
  7. 7Plate and frame filter press for sludge dewatering

For Similar Projects

Prepare the wastewater source, flow and peak-load data, pollutant analysis, target reuse or discharge standard, project schedule, and required equipment scope before detailed design and equipment selection.

Ref. A-021. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

The process train under assessment is: Rotary mechanical bar screen → Equalisation and flow-balancing tank → Multimedia filtration and activated-carbon polishing as required → MBR membrane bioreactor → Chlorine dioxide or UV disinfection → Reuse or discharge assessment → Plate and frame filter press for sludge dewatering.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.