Proposed aquaculture live-fish transport wastewater treatment system

Proposed treatment for closed-loop Mediterranean seawater used in live-fish transport, designed around TAN control and reuse of treated water.

Project Background

The client-supplied design basis is a closed recirculating seawater system for a live-fish transport trailer. TAN starts near 0 and may increase by approximately 2 mg/L per day, with a client target of TAN ≤5 mg/L. The water has high salinity, pH near 8.0, chloride near 19,900 mg/L, and no confirmed discharge specification. The proposed process is subject to water temperature, alkalinity, TSS, organic loading, fish species, stocking density, space, weight and power data.

Our Solution

The proposed solution uses a multimedia filter to remove suspended solids and protect the downstream membrane, followed by a particulate filter and UF for additional solids separation and biological-risk control. Chlorine dioxide is proposed for final disinfection, with dosing adjusted after confirming residual requirements and contact conditions. Filter backwash and UF reject water should be collected, characterised and returned to the process headworks or routed for separate treatment depending on solids, salinity and space. TAN control may require additional biological or chemical treatment once temperature, alkalinity, loading and operating conditions are confirmed. Final equipment sizing, membrane selection and disinfection dosage remain subject to the client’s data.

What We Asked First

Please confirm water temperature, alkalinity, actual TSS and organic loading, fish species and stocking density, available trailer dimensions and weight limits, power supply, required treatment objectives, sampling results and the intended reuse or discharge route before final design.

Proposed Process Train

  1. 1Equalisation and solids capture
  2. 2Granular multimedia filtration
  3. 3Coarse particulate filtration
  4. 4Ultrafiltration
  5. 5Chlorine dioxide disinfection
  6. 6Treated-water storage and reuse

For Similar Projects

Prepare representative water samples, current and expected water-quality data, fish-loading information, trailer drawings, utilities and discharge or reuse requirements. These will allow confirmation of process stages, equipment sizing and operating controls.

Ref. A-028. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

The process train under assessment is: Equalisation and solids capture → Granular multimedia filtration → Coarse particulate filtration → Ultrafiltration → Chlorine dioxide disinfection → Treated-water storage and reuse.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us