Choose MBR or CAS from the required water pathway
For petroleum wastewater in Clark, MBR is usually the stronger choice when reuse, low solids carryover, limited space, or recurring oil and FOG shocks make clarifier settling unreliable. Conventional activated sludge may cost less when the facility has stable loading, usable aeration and clarifier assets, and discharge-only service. Neither replaces oil-water separation and equalization. Final selection requires a segregated 12-month wastewater dataset, current Clark permit or reuse criteria, and a lifecycle comparison of energy, chemicals, labor, sludge disposal and recovered-water value.
The decision starts with the destination of the treated water, not with a preference between equipment types. A discharge-only route allows CAS when the biological load is stable and the existing clarifier has useful service life. A firm process-reuse requirement usually favors MBR because membrane retention avoids dependence on secondary-clarifier settling, although reuse-specific polishing may still be necessary. Cooling-tower makeup and boiler feed also require an assessment of conductivity, silica, hardness, scaling and residual oxidant; low TSS alone does not establish reuse suitability.
A hybrid is appropriate when existing CAS biology and civil assets remain economically useful but the reuse pathway demands better solids separation than the clarifier can provide. That option requires an integrated hydraulic study because the added separation stage, controls, maintenance access and redundancy can change the footprint and operating burden.
For Clark, the current permit, sewer acceptance criteria, groundwater restrictions, receiving-water requirements and end-user reuse specification are mandatory buyer checks. The supplied research supports refinery technology screening; it does not establish Clark-specific limits.
| Verified site condition | Preliminary selection | Buyer verification |
|---|---|---|
| Process reuse, cooling-tower makeup or boiler feed is required | MBR, with reuse-specific polishing where required | End-user water specification, actual water chemistry and polishing validation |
| Discharge-only service with stable loading and usable aeration and clarifier assets | CAS | Current permit, asset condition, sludge route and lifecycle cost |
| Useful CAS assets remain but solids separation must improve | Hybrid | Integrated footprint, controls, bypass and redundancy |
| Recurrent FOG or emulsified-oil shocks | Enhanced pretreatment followed by MBR or CAS | Stream characterization, equalization performance and fouling or settling assessment |
| Groundwater injection or sensitive receiving context | Defer final selection | Current authorization, aquifer or receiving constraints and monitoring requirements |
The MBR cost and lifecycle-cost guide provides a useful screening framework, but it does not replace Clark-specific permit or reuse review.
Compare the two treatment trains
MBR and conventional activated sludge both use aerated biology for dissolved-organics treatment and can support nitrification, but they separate solids in fundamentally different ways: MBR retains biomass on membranes, while CAS depends on settling in a secondary clarifier. That difference becomes decisive when FOG, surfactants or variable loading impair floc formation or clarifier performance.
The HydropureWater 2026 petroleum-wastewater comparison cites the 2023 Membranes review for MBR solids retention time of 20–60 days and hydraulic retention time of 4–8 hours, compared with CAS SRT of 5–15 days and HRT of 6–12 hours. The same planning source reports MBR effluent COD below 50 mg/L, TSS below 5 mg/L and oil and grease below 2 mg/L, versus CAS COD of 60–100 mg/L and TSS of 20–30 mg/L. These are refinery planning references, not guarantees for a Clark facility.
MBR offers a physical solids barrier and does not require a secondary clarifier for biomass retention. It also shifts operating attention toward scour-air availability, transmembrane-pressure monitoring, clean-in-place execution and membrane replacement planning. CAS requires controlled sludge wasting, scum removal and active management of filamentous bulking, but its civil and biological arrangements may already be in place.
The verified HydropureWater product catalog states a 60% footprint reduction for its integrated submerged-PVDF MBR system compared with conventional systems. That is a catalog claim, not a guaranteed Clark layout; a scaled plan must include equalization, pretreatment, blowers, CIP equipment and maintenance access.
| Parameter | MBR | CAS | Selection consequence |
|---|---|---|---|
| Biological solids separation | Membrane retention | Secondary-clarifier settling | Favor MBR where consistent solids capture is critical |
| Planning SRT | 20–60 days | 5–15 days | Verify against site loading and temperature |
| Planning HRT | 4–8 hours | 6–12 hours | Requires a vendor hydraulic calculation |
| Planning effluent COD | Below 50 mg/L | 60–100 mg/L | Screening values only |
| Planning effluent TSS | Below 5 mg/L | 20–30 mg/L | Relevant to downstream polishing and reuse |
| Principal operating focus | Scour air, pressure monitoring, CIP and replacement | Sludge wasting, scum removal and bulking control | Compare against actual operator capability |
The DF flat-sheet membrane module should be evaluated as a component of the complete biological and pretreatment design, not as a complete treatment plant.
Control oil, FOG and variable petroleum streams

Neither clarifier nor membrane can be sized safely until the petroleum waste streams are characterized separately. Produced water, desalter brine, tank-bottom draws, spent caustic, wash water and stormwater runoff can differ in contaminants, temperature and operating pattern. Combining them into one average can hide slug loads and make equalization, biological loading and pretreatment appear smaller than the operating risk.
Use a segregated 12-month dataset covering flow, temperature, COD, BOD, TSS, free and emulsified oil, FOG, phenols, PAHs, sulfides, ammonia, pH, conductivity and salinity. Preserve individual-stream records, identify sampling frequency and averaging periods, and identify excursions rather than relying only on monthly composites.
The HydropureWater 2026 comparison reports refinery planning values of 30–70 °C, free or emulsified oil often at 50–500 mg/L, phenols at 10–100 mg/L and ammonia at 20–80 mg/L. These are non-Clark refinery planning values, not Clark discharge limits or design guarantees.
Free oil, grease, surfactants, incompatible chemicals, excessive suspended material and unsuitable pH require upstream control. A DAF pretreatment system for oil and FOG may be appropriate if measured stream characteristics support it, but it does not remove every dissolved contaminant and does not eliminate the need for equalization, pH control or biological treatment.
| Design input | Why it changes the biological selection | Required evidence |
|---|---|---|
| Free and emulsified oil | Determines whether biological systems will be protected by upstream oil-water separation | Stream-specific analytical records and removal-performance data |
| FOG and surfactants | Influences equalization, DAF performance, settling and membrane fouling | Characterization, recovery data and measured loading sequence |
| Phenols, PAHs and sulfides | Changes toxicity, aeration demand and biological treatment assumptions | Influent limits, loading calculations and toxicity-control basis |
| Temperature, pH and salinity | Changes biological activity, equalization and materials requirements | 12-month records, operating ranges and excursion frequency |
| Flow and slug characteristics | Determines equalization volume and hydraulic response | Continuous flow and event records for each stream |
The treatment selection should follow the measured data, not a generic assumption that all petroleum wastewater can be handled by one biological train.
Compare capital, operating and reuse economics
MBR usually carries a higher capital and operating burden, but the difference can change when reuse creates a firm avoided water or sewer cost. The correct comparison is therefore a site-specific lifecycle model, not a comparison of equipment quotations with different scopes.
HydropureWater’s supplied 2026 planning references give new-build MBR capital cost of $2.0 million–$8.5 million and CAS capital cost of $1.2 million–$4.5 million for systems serving 50–500 m³/day, depending on capacity and pretreatment. These are directional screening ranges, not quotations for Clark. Indicative MBR operating cost is $0.40–$0.75/m³, with MBR estimated at 20–30% above CAS because of scour air and periodic CIP.
The same references give scour-air energy demand of 0.7–1.4 kWh/m³ and, in a separate refinery estimate, 0.8–1.5 kWh/m³. Bidder energy models should be reconciled with the guaranteed design flow, selected equipment and local electricity price. A higher MBR capital cost may also reduce downstream solids loading, but bidders must demonstrate that benefit rather than assume it.
| Economic input | MBR treatment | CAS treatment | Clark verification |
|---|---|---|---|
| New-build capital | $2.0 million–$8.5 million | $1.2 million–$4.5 million | Scope-identical quotations for 50–500 m³/day planning cases |
| Indicative operating cost | $0.40–$0.75/m³ | Not numerically supplied | Calculate from local electricity, labor, chemicals and disposal |
| Relative operating estimate | 20–30% above CAS | Baseline | Vendor energy and chemical model |
| Scour-air energy | 0.7–1.4 kWh/m³; separate estimate 0.8–1.5 kWh/m³ | Not applicable to the same extent | Reconcile with blower efficiency and operating profile |
| Reuse value | Potential benefit where MBR enables required reuse | Potential benefit only if treatment and polishing criteria are met | Confirm firm demand, local water and sewer charges, and end-user acceptance |
Model electricity, chemicals, labor, membrane replacement, sludge disposal, water purchase, sewer charges and recovered-water value using Clark-specific values. Do not transfer a generic refinery reuse saving to Clark until local rates and firm reuse demand are verified.
Build a bidder-ready design basis

A signed design basis should define the design flow, segregated influent, required water pathway, pretreatment, biological basis, outlet criteria and battery limits before bids are compared. A blended plant average is not an acceptable sizing basis for variable petroleum streams.
Require bidders to state the guaranteed design flow, influent limits, SRT, HRT, membrane material and pore size, design flux, scour-air demand, cleaning chemistry, redundancy, controls and replacement intervals. Require the same complete scope for each alternative: oil and FOG pretreatment, equalization, biological tanks, blowers, pumps, controls, electrical and civil work, commissioning, training and performance testing. Clarify membrane replacement responsibility and critical-equipment redundancy.
The HydropureWater 2026 planning reference gives CIP intervals of every 6–12 months and membrane life of 5–8 years. These are planning references rather than guarantees for petroleum duty. Bidders must state assumptions supporting their proposed intervals.
Distinguish complete-plant capacity from module output. The verified catalog lists DF configurations at 32–135 m³/day per configuration; those figures do not represent complete-plant capacity. The MBR versus activated-sludge buyer framework provides a useful structure for checking that distinction.
| Bid package item | Minimum bidder response | Owner acceptance check |
|---|---|---|
| Design basis | Guaranteed flow, segmented influent basis, SRT, HRT and water pathway | Matches the signed Clark site basis |
| Membrane design | Material, pore size, design flux, scour air, CIP chemistry and replacement interval | Calculations and operating assumptions are stated |
| Equipment scope | Complete pretreatment-to-discharge or reuse scope | No excluded civil, electrical, controls or polishing items |
| Performance guarantee | Effluent limits, sampling method, test duration and remedy for noncompliance | Tied to verified permit or reuse criteria |
| Redundancy | Blower, pump, membrane train and bypass strategy | Consistent with required availability |
| Acceptance testing | Commissioning, training, performance test and handover documents | Defined before contract award |
Require bidders to document the technical basis for every guarantee. Permit and reuse compliance remains a Clark buyer-verification item; neither technology automatically establishes compliance with an unverified requirement.
Frequently Asked Questions
Should the MBR and CAS planning ranges be used for a Clark budget?
Use the MBR capital range of $2.0 million–$8.5 million and CAS range of $1.2 million–$4.5 million only for initial screening within the cited 50–500 m³/day planning scope, according to the HydropureWater 2026 comparison. Before budget approval, request a site-specific Clark quotation with identical pretreatment, civil, electrical, controls, commissioning and reuse-polishing scope.
What should determine plant size for petroleum wastewater in Clark?
Size from segregated stream data and the required water pathway, not a blended average. Require a 12-month record for flow, temperature, COD, BOD, TSS, oil, FOG, phenols, PAHs, sulfides, ammonia, pH, conductivity and salinity, then require each bidder to state how its design flow, SRT, HRT and equalization capacity follow from that record.
Which supplier qualifications should be checked before selecting an MBR system?
Check whether the supplier supplies a complete design basis, guaranteed flow, influent limits, membrane details, scour-air calculations, CIP procedure, redundancy, controls, maintenance plan and performance remedy. Also verify that module output is not presented as complete-plant capacity and that the proposed operating support is available for the project.
How should Clark permit and reuse compliance be addressed?
Obtain the current permit, sewer acceptance criteria, groundwater or receiving-water requirements and any end-user reuse specification before issuing the equipment specification. Require the bidder to map each applicable requirement to a guaranteed parameter, sampling method and acceptance test; a technology label such as MBR is not evidence of compliance.