Proposed compact wastewater treatment system for distillery

Proposed treatment for compact distillery wastewater, subject to confirmation of flow, pollutant loads, discharge route and site constraints.

Project Background

The client requires a compact wastewater treatment system for a small distillery using purchased ethanol to prepare distilled beverages. The stated volume is approximately 2000 tons, but its measurement period and meaning are unclear. Design requires confirmation of wastewater sources, daily and peak flows, COD, BOD₅, TSS, pH, oil and alcohol concentrations, receiving or reuse requirements, site area, power availability and treatment scope.

Our Solution

A proposed compact treatment train would begin with source segregation, screening, grit removal, equalisation and pH control, followed by oil and solids separation. Anaerobic treatment could reduce readily biodegradable organics where the confirmed COD load and temperature support it, while aerobic biological treatment would address residual dissolved organics and BOD₅. Secondary clarification and filtration would provide polishing, and chlorine dioxide disinfection would be applied where required for the confirmed reuse or discharge route. Sludge would be thickened and dewatered before appropriate handling, with the final route selected under local requirements. The process, equipment sizing and disinfection scope will be revised after flow, water-quality, site and power data are confirmed.

What We Asked First

Please confirm the measurement period represented by approximately 2000 tons, daily and peak wastewater flows, source segregation, COD, BOD₅, TSS, pH, oil and alcohol concentrations, discharge or reuse standard, available footprint, power supply and whether full treatment or disinfection only is required.

Proposed Process Train

  1. 1Source segregation and equalisation
  2. 2Screening and grit removal
  3. 3Equalisation and pH control
  4. 4Oil and solids separation
  5. 5Anaerobic treatment
  6. 6Aerobic biological treatment
  7. 7Secondary clarification and filtration
  8. 8Chlorine dioxide disinfection and sludge handling

For Similar Projects

Prepare the wastewater flow and quality dataset, source layout, treatment objective, available footprint, utilities and sludge-disposal route before detailed equipment sizing and final process selection.

Ref. A-007. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

The process train under assessment is: Source segregation and equalisation → Screening and grit removal → Equalisation and pH control → Oil and solids separation → Anaerobic treatment → Aerobic biological treatment → Secondary clarification and filtration → Chlorine dioxide disinfection and sludge handling.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.