Large multi-vessel RO array (70 m³/h) engineered for a dairy's process and CIP water demand.
Project Background
A dairy enterprise needed a high-capacity RO plant for process and cleaning-in-place water, with reliability suited to continuous production.
Our Solution
A customised multi-vessel RO array with duty/standby high-pressure pumps, softening ahead of the membranes, and a sanitary product tank.
Process Train
- 1Multi-media filtration
- 2Activated carbon
- 3Softening
- 4Precision filter
- 5High-pressure pumps
- 6Multi-vessel RO array
- 7Product tank
Ref. D-012. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).