Beverage plant process water: single-pass RO with automatic antiscalant dosing to protect membranes on a hard municipal supply.
Project Background
A beverage producer needed consistent low-TDS process water for syrup preparation and bottle rinsing from a municipal supply with variable hardness.
Our Solution
Single-pass RO (3 m³/h) with an automatic antiscalant dosing device ahead of the high-pressure pump, extending the interval between chemical cleanings.
Process Train
- 1Raw-water pump
- 2Quartz sand filter
- 3Activated carbon filter
- 4Precision filter
- 5Antiscalant dosing
- 6High-pressure pump
- 7RO membranes
- 8Product-water tank
Ref. D-009. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).