Stainless-frame RO plant with 8-inch membranes supplying 300 m³/day of process water to a beverage line.
Project Background
A beverage factory needed a compact RO plant for 300 m³/day of process water with stainless construction suitable for a food environment.
Our Solution
Skid-mounted RO with 8-inch membrane housings on a stainless frame, automatic flushing and conductivity monitoring on the product line.
Process Train
- 1Raw-water pump
- 2Multi-media filter
- 3Activated carbon
- 4Precision filter
- 5High-pressure pump
- 68-inch RO membranes
- 7Product tank
Ref. D-011. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).