~60 m³/d MBR wastewater treatment system for data centre reuse

Proposed treatment and storage system for data centre domestic sewage intended for Type 1 irrigation reuse, subject to confirming the design basis.

Project Background

The client-supplied design basis is domestic sewage from a data centre with a nominal capacity of ~60 m³/d. The proposed treatment train is intended to support non-potable irrigation reuse. Final process sizing, disinfection criteria and treatment boundaries require confirmation of the wastewater flow basis, water quality, applicable Type 1 requirements and whether cooling-related streams are included.

Our Solution

The proposed solution uses a mechanical screen to remove gross solids, equalisation to buffer variable domestic loads, and an anoxic-aerobic biological stage to address organic matter and nutrients. MBR membrane filtration provides a solids-free reclaimed stream suitable for downstream disinfection and storage. Chlorine dioxide is proposed for final disinfection, with storage and distribution arranged for non-potable irrigation. Dewatering equipment handles settled biological excess sludge. The final configuration, capacities and equipment selection will be adjusted after the flow basis, wastewater analysis, cooling-stream boundary and applicable irrigation standard are confirmed.

What We Asked First

Please confirm whether the stated capacity is average or maximum, operating hours, peak factors and batch discharges; provide representative wastewater analysis; identify the jurisdiction and Type 1 irrigation criteria; and clarify whether cooling tower blowdown, RO concentrate or cleaning wastewater are included.

Proposed Process Train

  1. 1Rotary mechanical bar screen
  2. 2Equalisation tank
  3. 3Anoxic biological reactor
  4. 4Aerobic biological reactor
  5. 5MBR membrane filtration
  6. 6Chlorine dioxide disinfection
  7. 7Reclaimed water storage and distribution
  8. 8Residual sludge conditioning and dewatering

For Similar Projects

Prepare the flow and operating profile, representative wastewater analysis, site and reuse requirements, cooling-drainage inventory, applicable irrigation standard, and delivery and installation information before final equipment sizing.

Ref. A-005. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

This project is listed in the ~60 m³/d capacity class: the design value rounded up to the next 5 at its second significant digit. Exact design values are not published.
The process train under assessment is: Rotary mechanical bar screen → Equalisation tank → Anoxic biological reactor → Aerobic biological reactor → MBR membrane filtration → Chlorine dioxide disinfection → Reclaimed water storage and distribution → Residual sludge conditioning and dewatering.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?