Hospital purified-water plant: two-stage RO with a sterilised return loop feeding departments from one central tank.
Project Background
A hospital needed centrally produced purified water for several departments, distributed through a loop that would not regrow bacteria.
Our Solution
Two-stage RO with softening, a purified-water tank and a variable-frequency supply loop with return-line sterilisation, so water circulates rather than stagnates.
Process Train
- 1Raw-water pump
- 2Quartz sand filter
- 3Activated carbon filter
- 4Two-stage RO
- 5Precision filter
- 6Softening
- 7Purified-water tank
- 8Variable-frequency supply with return-loop sterilisation
- 9Points of use
Ref. D-015. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).