All-stainless (SS316) RO purifier producing drinking water for wards and staff at a hospital.
Project Background
A hospital wanted a hygienic, easy-to-clean drinking-water plant with no plastic wetted parts in the pretreatment.
Our Solution
SS316 filter vessels and frame with an RO stage and purified-water tank supplying direct-drinking dispensers.
Process Train
- 1Raw-water pump
- 2SS316 sand filter
- 3SS316 carbon filter
- 4Precision filter
- 5RO
- 6Purified tank
- 7Direct-drinking points
Ref. D-016. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).