Village-scale UF unit under a rural drinking-water safety programme: 200 m³/day from a local surface source.
Project Background
A village under a rural drinking-water safety programme needed reliable purification of a local surface source with minimal operator attention.
Our Solution
FRP sand filter plus a UF skid with automatic backwash; no coagulant dosing required at this turbidity range.
Process Train
- 1Raw-water pump
- 2FRP sand filter
- 3UF membrane skid
- 4Clean-water tank
- 5Village distribution
Ref. D-004. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).