Small township unit turning river water into domestic water: pressure filtration and UF with a stainless clean-water tank.
Project Background
A township needed domestic water from a river source at a site with limited power and no full-time operator.
Our Solution
Pressure filter ahead of a compact UF unit, all skid-mounted, with a modular stainless tank for storage.
Process Train
- 1River intake
- 2Pressure filter
- 3UF unit
- 4Stainless clean-water tank
Ref. D-006. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).