Compact integrated submerged-membrane unit installed on a forested hillside to purify stream, river and mountain-spring water.
Project Background
A remote hillside site needed to purify stream and spring water without a pumped pressure-membrane train or a large building.
Our Solution
Integrated submerged UF unit with stainless-steel tank body, gravity-assisted flow and simple air-scour cleaning, delivered as one assembly.
Process Train
- 1Stream/spring intake
- 2Integrated submerged UF tank
- 3Clean-water tank
Ref. D-005. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).