Map every wastewater stream before selecting equipment
The Kerman facility requires a measured data-center water balance and a defined residual destination for every stream before a treatment skid can be selected. The boundary should include cooling make-up, evaporation, cooling tower blowdown, drain-down, equipment washwater, domestic sewage, RO reject, and any direct-liquid or immersion-cooling release. Cooling topology must also be confirmed because air-cooled, evaporative, direct-liquid, immersion, and hybrid systems produce different flows and compositions. Obtain source-water analyses, monthly demand, cooling configuration, chemical dosing, current cycles of concentration, expected IT-load changes, and proposed destinations before sizing. The household-equivalent estimate cited by the Congressional Research Service describes a 100 MW U.S. facility averaged across cooling strategies; it is not a Kerman design flow. A comparable data center wastewater treatment guide provides a useful stream-mapping framework.
| Water-balance item | Engineering information required | Decision controlled |
|---|---|---|
| Cooling make-up and evaporation | Measured demand, source chemistry, cooling configuration, cycles of concentration | Blowdown generation and treatment train |
| Cooling tower blowdown | Peak and daily flow, temperature, pH, TDS, suspended solids, hardness, alkalinity, silica, metals, biocides, and corrosion inhibitors | Pretreatment, desalination, stabilization, and residual route |
| Drain-down and equipment washwater | Flow, suspended solids, oil and grease, cleaning chemicals, and metals | Equalization, flotation, filtration, and disposal route |
| Domestic sewage | Measured flow, organic load, wastewater characterization | Dedicated biological treatment capacity |
| RO reject and other residuals | Quantity, composition, precipitation tendency, storage and destination | Recovery objective and concentrate management |
| Direct-liquid or immersion release | Fluid identity, concentration, safety data, and incident-response requirements | Specialist segregation or destruction |
Choose a treatment train for each residual stream
Cooling-tower blowdown requires a chemistry-led train including equalization, representative sampling, solids removal, membrane pretreatment, desalination, stabilization, disinfection, and a defined residual route. Water Utility Report’s 2026 summary identifies possible elevated salts, heavy metals, biocides, corrosion inhibitors, and altered pH, requiring sampling of both make-up water and circulating-loop chemistry. Domestic sewage should remain separate to prevent increased solids and biological load in the blowdown. Equipment washwater needs characterization for suspended solids, oil and grease, cleaning chemicals, and metals before equalization or flotation is selected.
| Stream | Indicative treatment sequence | Selection control |
|---|---|---|
| Cooling-tower blowdown | Equalization and sampling; solids removal if required; UF or equivalent pretreatment; RO; stabilization; disinfection if required; residual management | Actual feed chemistry, cooling-loop compatibility, reuse target, and permitted residual route |
| Domestic sewage | Dedicated biological treatment followed by membrane separation | Measured flow and organic load |
| Equipment washwater | Equalization; dissolved air flotation where justified; filtration; targeted chemical treatment | Oil, solids, cleaning chemistry, metals, and jar-test results |
| Suspected refrigerant, PFAS, or coolant release | Isolation and compatible separation or specialist destruction | Confirmed fluid identity, concentration, and manufacturer requirements |
The referenced MBR integrated wastewater treatment system combines activated sludge with submerged PVDF filtration below 1 micron and has a stated equipment capacity of 10–2,000 m³/day. That is a catalog range, not a Kerman sizing value. Likewise, the referenced DAF machine has a stated range of 4–300 m³/h; assign capacity only after measured washwater flow and contaminants are known. Do not route a suspected coolant release through a biological, UF, or RO train until its identity and concentration are confirmed and a compatible method has been demonstrated.
Decide whether the project should reduce discharge or maximize reuse

The project objective must distinguish between lower discharge with continued residual discharge, partial reuse with a lawful residual route, and higher recovery with active scale control plus concentrate or salt handling. This choice determines whether the buyer needs a pretreatment-dominated system, an RO and blending system, or a more complex high-recovery train with precipitation and residual management. The comparison should use recovered water, freshwater displaced, concentrate generated, compliance exposure, energy, chemicals, cleaning frequency, redundancy, storage, blending, downtime, and operator workload. Maximum membrane recovery is difficult to justify when precipitate or concentrate has no reliable destination.
| Project objective | Treatment concept | Residual and operating burden | Decision rule |
|---|---|---|---|
| Reduced discharge | Minimum treatment needed to meet the confirmed destination requirement | Continues a lawful residual-discharge obligation | Use when compliance, not water recovery, is the primary need |
| Partial reuse | Pretreatment, qualified permeate, controlled blending, and a residual route | Concentrate remains manageable; product quality requires continuing control | Use when measured water savings justify membrane treatment and the residual can be handled reliably |
| Higher recovery | RO with active scale control and additional concentrate or salt handling | Greater energy, chemical, cleaning, monitoring, maintenance, and operator demands | Use only when the recovered-water value and confirmed destination justify the added system |
The referenced industrial RO system for cooling-water reuse states recovery rates up to 95%. This is a maximum catalog claim, not a guaranteed Kerman recovery rate. Bidders should demonstrate recovery under the tender’s actual feed chemistry, including concentrate quantity and composition.
Size the system from measured flows and feed chemistry
System capacity must follow measured peak and daily flows for each segregated stream, current chemistry, cooling-loop conditions, chemical programs, and expected future load. Catalog capacities are screening tools only. The referenced UF range of 2,000–40,000 L/h cannot become the project capacity until measured flow and pretreatment demands are established. Likewise, the 500–1,500 mg/L TDS and 10–25 mg/L suspended-solids guidance cited by Genesis Water Technologies for many cooling-tower systems is not an Iranian discharge standard and must not be used as one.
| Sizing input | Required evidence | Equipment effect |
|---|---|---|
| Peak and daily flow | Continuous metering and operating records for each stream | Defines equalization, pretreatment, membrane, and biological capacity |
| Feed chemistry | Representative source and residual-stream analyses | Defines membrane type, scaling control, chemical dosing, and reject management |
| Cooling-loop compatibility | Temperature, pH, hardness, alkalinity, silica, corrosion limits, and chemical program | Defines stabilization, disinfection, blending, and monitoring |
| Residual destination | Confirmed quantity, composition, storage, and route limits | Limits recovery and determines whether concentrate treatment is required |
| Future operation | IT-load scenario, operating hours, redundancy, and maintenance strategy | Sets installed capacity and standby provision |
The referenced UF pretreatment for cooling-blowdown reuse uses 0.03 micron PVDF membranes, automatic backwash, and air scour. Its stated turbidity acceptance of up to 300 ppm is not a guarantee for every Kerman feed. Collect representative samples across operating conditions and require a pilot or engineering trial where scaling, silica, biological growth, or new coolant chemistry creates material uncertainty. The associated RO and UF membrane filter elements should be selected against demonstrated feed conditions rather than headline micron ratings.
Confirm the residual route with Iranian authorities

The selected residual route must be confirmed with the relevant Iranian environmental and water authorities and the receiving sewer utility or industrial pretreatment operator before the treatment train is frozen. Review direct discharge, sewer acceptance, industrial pretreatment, permitted quantity, temperature, pH, suspended solids, dissolved solids, residual chemicals, metals, monitoring, and reporting requirements against current local rules. These are destination-specific constraints that must be established during the planning phase.
U.S. examples show why receiving-system capacity and peak-flow commitments belong in the engineering basis. Black & Veatch’s commercial guide, updated in 2026, reports that an updated Goodyear development agreement involved $36 million toward an approximately $90 million treatment-plant expansion securing 1.2 million gallons per day of capacity, while a Shreveport draft agreement estimated approximately 2.5 million gallons per day of wastewater and blowdown. These figures demonstrate the scale of infrastructure commitments; they are not Kerman capacities or Iranian requirements. The same guide notes that utilities may impose pretreatment conditions, capacity assessments, and connection restrictions. A wastewater engineering guide for Iran should be used as context, not as a substitute for current local confirmation.
Use two checks before issuing a tender: obtain written confirmation of the acceptable residual quantity and quality, and establish who owns the connection, monitoring, reporting, and future capacity requirements. If sewer capacity, peak-flow agreement, or residual acceptance is unresolved, keep the residual-management and reuse alternatives open in the commercial offer.
Turn the concept into a vendor-guaranteed tender package
Every bidder should receive the same measured flows, feed chemistry, reuse objective, residual destination, operating conditions, and commissioning criteria. The contract should guarantee performance at the actual feed conditions rather than at clean-water conditions or a catalog maximum. A cooling-blowdown treatment decision framework provides a useful structure for separating freshwater reduction, lawful residual discharge, and reliable reuse-water quality.
| Guarantee or bid item | Required basis | Acceptance check |
|---|---|---|
| Flow and recovery | Measured peak and daily feed; actual chemistry; stated operating mode | Recovery is demonstrated at the specified feed conditions, not inferred from a maximum rate |
| Product-water quality | Cooling-loop and reuse specifications | Limits include the parameters relevant to scaling, corrosion, biology, and intended use |
| Concentrate | Quantity, composition, precipitation tendency, storage, and destination | Residual route and contingency are contractually allocated |
| Operating burden | Energy, chemicals, cleaning intervals, bypass, fail-safe behavior, and redundancy | Bids state consumption and maintenance assumptions |
| Implementation | Commissioning, training, spares, local support, and schedule | Delivery and performance milestones are tied to acceptance evidence |
Request itemized pricing for pretreatment, membranes, controls, pre- and post-treatment chemicals, residual management, commissioning, training, spares, and service rather than comparing skid-only quotations. Where treatment depends on chemical addition, the automatic chemical dosing system should be tied to a testing-based dose and control strategy; equipment availability does not establish the required chemical or dose. Include source analyses, flow records, cooling chemistry, site climate, electrical supply, operating availability, and product-water specifications in the tender. Define sampling points, test conditions, acceptance criteria, rejection remedies, warranty boundaries, stabilized performance tests, training deliverables, local support, and guaranteed delivery and commissioning dates.
Reject bids that provide nominal capacity, generic recovery, or compliance claims without the actual feed chemistry and test method. A qualified bid should identify its design assumptions and demonstrate how the treatment train, cooling system, residual route, and operating safeguards work together.
Frequently Asked Questions
How much does a Kerman data center wastewater and cooling blowdown treatment plant cost?
No source-supported project price is available, so a defensible cost cannot be quoted yet. Request measured peak and daily flows, source and residual chemistry, stream separation, cooling configuration, reuse objective, residual route, site utilities, pretreatment needs, controls, commissioning scope, and local service obligations. Require itemized prices for those elements; a skid-only quotation will conceal the major cost and risk drivers.
Should UF, RO, and MBR systems be combined into one skid?
Not simply because the technologies can be integrated. The engineering basis calls for segregated objectives: UF may pretreat cooling blowdown before RO, while domestic sewage generally follows a dedicated biological process. Ask each bidder to define stream boundaries, backflow prevention, product-water destinations, and operating interlocks. The correct check is whether each unit has a demonstrated feed, duty, and required product or discharge specification.