UF/RO reuse train returning treated plating rinse-water to the line.
Project Background
Rinse wastewater from plating lines had to be treated and returned to production to cut fresh-water intake and discharge volume.
Our Solution
Chemical precipitation for metals, then UF and RO so the permeate is clean enough to go back to the rinse tanks.
Process Train
- 1Plating rinse wastewater
- 2Chemical precipitation
- 3Multi-media filter
- 4UF
- 5RO
- 6Reuse to rinse tanks
Ref. D-027. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).