80 m³/h Ultrafiltration Plant for a Township Water Supply

Mountain spring water for a township, purified by UF skids so residents get clean tap water year-round regardless of seasonal turbidity.

Project Background

A township water plant used mountain spring water that turned turbid after rain. Residents needed clean tap water without a large conventional plant or full-time chemical dosing.

Our Solution

80 m³/h of hollow-fibre UF in parallel skids with automatic backwash, sized so one skid can be taken offline for cleaning while the town stays supplied.

Process Train

  1. 1Spring-water intake
  2. 2Raw-water pump
  3. 3Sand filter
  4. 4UF membrane skids
  5. 5Clean-water tank
  6. 6Distribution

Ref. D-002. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).

How We Deliver

Projects of this type are delivered in the nine stages below. Installation, commissioning and other on-site stages follow each contract's scope. Every stage within our scope produces a written record that we keep on file.

  1. 1 Design basis confirmationAverage and peak flow, influent or gas data, discharge or reuse target Record producedDesign basis sheet
  2. 2 Process & mechanical designProcess calculations, equipment selection, layout and piping Record producedCalculation book, P&ID, general arrangement
  3. 3 Manufacturing & quality controlMaterial and in-process inspection of the main equipment Record producedMaterial & QC records
  4. 4 Factory acceptance test (FAT)Trial run against the design parameters before dispatch Record producedFAT record
  5. 5 Packing & dispatchPacked, marked and shipped against the equipment list Record producedPacking list
  6. 6 Installation or supervisionPer contract scope Record producedInstallation record
  7. 7 CommissioningStart-up, parameter tuning and interlocks Record producedCommissioning log
  8. 8 Performance verificationEffluent or emission checked against the design basis Record producedPerformance test record
  9. 9 Training, handover & after-salesOperator training, document handover, after-sales support Record producedO&M manual, training record

Planning a similar project? Start with these six parameters

  1. FlowDaily average and peak (m³/day and m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH and anything unusual
  3. Discharge targetThe standard you must meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Send your parameters — initial process recommendation within 24 hours

Frequently Asked Questions

This project is listed in the 80 m³/h capacity class: the design value rounded up to the next 5 at its second significant digit. Exact design values are not published.
The process train was: Spring-water intake → Raw-water pump → Sand filter → UF membrane skids → Clean-water tank → Distribution.
Yes. Send us your daily and peak flow, influent quality, discharge or reuse target, operating hours and site constraints, and our engineers will reply with an initial process recommendation within 24 hours.

Planning a similar project?

Share your flow, influent quality and discharge target — our engineers respond within 24 hours.