Industrial RO plant with FRP pressure vessels recovering reuse water from mine wastewater.
Project Background
Mine wastewater with elevated dissolved solids and hardness had to be treated for reuse on site rather than discharged.
Our Solution
Multi-media and UF pretreatment feeding an RO train in FRP pressure vessels, with antiscalant dosing tuned to the mine water chemistry.
Process Train
- 1Mine drainage
- 2Multi-media filtration
- 3UF
- 4Antiscalant dosing
- 5RO
- 6Reuse water tank
Ref. D-024. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).