Confirm the discharge route and design duty
A Bogotá hotel generally needs an A/O package treatment plant for smaller sites and an MBR system for larger or reuse-focused properties. The 2026 guidance uses a threshold of 30 m³/day: below it, WSZ is the lower-cost choice; above it, or when LEED v4.1 BD+C Water Credit applies, MBR is recommended. Size guest demand at 180–250 L per occupied room per day, apply the 1.15 altitude correction, then add food-service, laundry, spa and pool-backwash loads. Hotels with kitchens serving at least 60 covers per day need upstream grease removal and DAF. Final permit limits and discharge routes must be confirmed for the site.
Confirm the discharge route and design duty
The receiving point determines the treatment target before equipment is selected. The HydropureWater guidance identifies a sewer-discharge envelope of BOD₅ ≤ 50 mg/L, TSS ≤ 50 mg/L, FOG ≤ 20 mg/L and total coliforms ≤ 1,000 NMP/100 mL. For direct discharge to a surface-water body, it identifies a tighter “vertimiento” tier, typically written as BOD₅ ≤ 30 mg/L, with site-specific requirements to be confirmed in the CAR permit rather than inferred from the sewer envelope (HydropureWater, 2026).
Before requesting a MBR membrane bioreactor proposal, establish whether the property will discharge to a sewer or directly to a surface-water body. The jurisdiction, receiving authority, discharge point and proposed reuse must be documented. Current CAR permit extracts and any applicable refinements should be obtained directly; the research is commercial guidance rather than a current primary-source CAR or Minambiente page.
Collect current and forecast occupancy, measured or metered wastewater flow, discharge elevation, available footprint and the intended reuse objective. These are necessary inputs for a defensible equipment schedule. Use W Bogotá only as an operating reference: the property has 168 rooms, an indoor pool and a full-service Away Spa, not as a universal sizing standard (Luxury Latin America, 2015).
| Procurement input | What the supplier needs | Why it changes the selection |
|---|---|---|
| Discharge route | Destination, authority, point of discharge and current permit extract | Sets the applicable treatment and monitoring basis |
| Occupancy and flow | Current and forecast occupied rooms, measured flow, kitchen and laundry data | Determines design duty |
| Site constraints | Footprint, excavation access, discharge elevation and utility locations | Constrains WSZ civil works and MBR layout |
| Reuse objective | Intended reuse applications and required water quality | Determines whether polishing and additional disinfection are needed |
Calculate average and peak wastewater demand

Guest-room demand is calculated first, then each non-room stream is added separately. The rule is 180–250 L per occupied room per day, multiplied by 1.15 for Bogotá’s 2,640 m altitude, with kitchen demand at 30 L per cover and laundry at 100 L per room turnover (HydropureWater, 2026). This is a design workflow, not a substitute for site flow records or influent testing.
- Calculate occupied rooms as available rooms multiplied by occupancy.
- Multiply occupied rooms by the selected room wastewater rate: 180, 200 or 250 L per occupied room per day.
- Multiply that result by 1.15 for the altitude correction.
- Add kitchen wastewater: meal covers multiplied by 30 L per cover.
- Add laundry wastewater: room turnovers multiplied by 100 L per turnover.
- Add spa and pool-backwash flows only after confirming their operating frequency, temperature and chlorination status.
- Calculate the morning peak using the peak factor of 2.0–2.5, then size equalization for four hours at peak (HydropureWater, 2026).
Benchmarks provide a sanity check for these calculations. A 50-room property at 70% occupancy produces 12–17 m³/day before kitchen and laundry surcharges. A 168-room property produces 50–65 m³/day before food-service surcharges. These values are property-scale checks from the 2026 source, not added together or treated as measured site flows.
| Worksheet field | Site entry | Calculation or source |
|---|---|---|
| Available rooms | Enter number | Hotel inventory |
| Occupancy | Enter percentage | Current and forecast |
| Occupied rooms | Calculate | Available rooms × occupancy |
| Room wastewater rate | Select L/occupied room/day | 180–250 L per occupied room per day |
| Altitude factor | 1.15 | Bogotá correction for 2,640 m |
| Guest-room flow | Calculate m³/day | Occupied rooms × rate × 1.15 ÷ 1,000 |
| Meal covers | Enter daily covers | × 30 L/cover |
| Room turnovers | Enter daily turnovers | × 100 L/turnover |
| Spa and pool-backwash | Enter separately | Confirm temperature, chlorine and discharge frequency |
| Peak flow | Calculate | Apply the peak factor of 2.0–2.5 |
Choose WSZ or MBR from the calculated flow
Calculated flow serves as the first platform screen for equipment selection. Below 30 m³/day and without a LEED target, the 2026 guidance identifies the underground WSZ package plant as the lower-cost option. Above 30 m³/day, or whenever LEED v4.1 BD+C Water Credit is in scope, it recommends the MBR membrane bioreactor (HydropureWater, 2026).
MBR reuse targets in that guidance are BOD₅ ≤ 10 mg/L and TSS ≤ 5 mg/L, with a footprint 60% smaller than conventional activated sludge. Treat these as selection targets rather than automatic project guarantees. The selected process, polishing train, hydraulic loading and reuse application must be confirmed in the supplier’s design.
| Decision condition | Initial platform | Supplier check required |
|---|---|---|
| Below 30 m³/day; no LEED target | Underground WSZ package plant | Duty at peak, buried footprint, excavation and disposal route |
| Above 30 m³/day | MBR membrane bioreactor | Membrane loading, redundancy, controls and cleaning assumptions |
| LEED v4.1 BD+C Water Credit in scope | MBR route | Reuse-quality basis, polishing, UV and project-specific targets |
| Constrained land | Compare MBR footprint with buried WSZ | Total installed area, access, civil works and expansion provisions |
Do not select on the threshold alone. A WSZ plant may minimize above-ground occupation because it is buried, while MBR may reduce the footprint relative to conventional activated sludge. Require both quotations against the same calculated average flow, peak flow, reuse target, excavation allowance and permit basis.
Build the pretreatment and specialty-stream train

The biological stage should receive segregated and conditioned wastewater, not every hotel stream at full concentration. When the kitchen operates at 60 covers per day or more, the 2026 guidance specifies a grease trap followed by dissolved air flotation before biology. The DAF removes FOG upstream of the aeration tank; when comparing procurement options, use the DAF versus clarifier selection analysis to define the required duty.
Spa and pool-backwash streams require separate handling. Operators should segregate these, quench them to below 35 °C and dechlorinate before biological treatment. Hot or chlorinated water routed directly into the main biological stream can damage the process. Confirm each stream’s temperature, chlorine concentration, volume and discharge schedule during site data collection.
Equalization should absorb guest-room peaks and laundry turnover surges. The rule sizes equalization for four hours at peak. For sludge, the source estimates 0.8–1.2 kg dry solids per m³ treated and identifies plate-and-frame dewatering as a compact mechanical option. For comparison with alternatives, see the guide to hotel wastewater sludge dewatering options.
| Stream or function | Required inclusion | Design basis |
|---|---|---|
| Kitchen wastewater | Grease trap, then DAF where kitchen operation is ≥ 60 covers/day | Meal covers and measured FOG loading |
| Spa and pool backwash | Segregation, cooling below 35 °C and dechlorination | Temperature, residual chlorine and flow records |
| Guest-room and laundry peaks | Equalization | Four hours at the calculated peak |
| Sludge | Collection, thickening and mechanical dewatering | 0.8–1.2 kg dry solids per m³ treated |
| Equipment delivery | Plate-and-frame press option | Confirm cake handling and off-site disposal route |
Specify disinfection, monitoring and compliance evidence
Treatment and disinfection should be specified as separate functions. The 2026 guidance selects UV at 40 mJ/cm² as the preferred sewer-discharge option and states that a chlorine dioxide generator can be added where the CAR permit requires a residual. Compare the specified UV disinfection equipment and, where required, a chlorine dioxide generating system against the confirmed permit route.
For properties above 70 rooms, the guidance expects a flow-metered sampling manhole with an automatic composite sampler at the discharge point. Until the authority confirms otherwise, carry this into the civil and monitoring schedule. The sewer design envelope remains BOD₅ ≤ 50 mg/L, TSS ≤ 50 mg/L, FOG ≤ 20 mg/L and total coliforms ≤ 1,000 NMP/100 mL, subject to verification against the current permit and applicable refinements (HydropureWater, 2026).
Require shortlisted suppliers to provide:
- Current permit extracts and confirmation of which authority governs the discharge.
- Influent testing covering flow, BOD₅, COD, TSS, FOG, temperature, pH and relevant kitchen and specialty-stream characteristics.
- Signed process guarantees tied to the calculated design flow and applicable discharge route.
- O&M assumptions covering energy, chemicals, membrane replacement, sludge removal, response times and trained staffing.
- General arrangement drawings, excavation details and seismic-anchoring information for Bogotá’s NSR-10 seismic zone, as stated in the 2026 guidance.
- A commissioning protocol covering start-up, performance testing, sampling, operator training and handover of monitoring records.
Frequently Asked Questions
What will a decentralized hotel wastewater treatment system cost in Bogotá?
The 2026 guidance gives an all-in operating estimate of USD 800–1,500 per m³/day per year, with cost varying by technology, energy, chemicals and membrane replacement (HydropureWater, 2026). Request a site-specific quote broken into equipment, civil works, seismic anchoring, installation, commissioning, utilities, chemicals, membrane replacement, sludge handling and O&M support; no capital price is established by the research.
How should a hotel select and size an equipment supplier?
Require each bidder to demonstrate its sizing calculation, performance guarantees, general arrangement drawings, seismic-anchoring design, commissioning protocol, O&M scope and experience preparing permit documents. Compare bids using the same average flow, four-hour equalization basis, peak condition, reuse target and confirmed discharge route.
Which treatment limits apply to a surface-water discharge?
The guidance identifies a tighter vertimiento tier, typically BOD₅ ≤ 30 mg/L, for direct surface-water discharge under a CAR permit.