An industrial-group project department needed domestic water from a turbid reservoir; a 4 m³/h UF unit inside a stainless tank enclosure solved it.
Project Background
The project department of a large industrial group drew domestic water from a local reservoir: sufficient volume, but turbid, with sediment, organics and some pathogens.
Our Solution
A 4 m³/h ultrafiltration unit housed inside a modular stainless-steel water-tank enclosure, so the whole system could be placed outdoors without a building.
Process Train
- 1Reservoir intake
- 2Sand filter
- 3UF unit (4 m³/h)
- 4Stainless storage tank