Chlorine dioxide generators and disinfection systems for drinking water, hospital wastewater, and swimming pool water treatment.
HydropureWater Chlorine Dioxide Generators produce high-purity ClO₂ disinfectant on-site using proven chemical or electrolytic methods. Available in eight configurations — from compact manual units (50 g/h) to fully automated industrial systems (20,000 g/h) — these generators deliver reliable microbial control for municipal drinking water, hospital effluent, industrial cooling loops, and process wastewater. Compliant with EPA, EU Drinking Water Directive 98/83/EC, and WHO Guidelines for Drinking-water Quality.
Full pipeline UV-C sterilizer range - flange, quick-connect, double lamp, medium-pressure, self-cleaning, outdoor rainproof and open-channel configurations. Chemical-free disinfection effective against chlorine-resistant Cryptosporidium and Giardia, with no by-products or taste change.
The HydropureWater Medical Wastewater Treatment System is a compact, fully automated unit engineered for clinics, dental offices, veterinary hospitals, and small medical facilities. Combining multi-stage filtration with ozone disinfection (99%+ kill rate), it meets EPA and EU Urban Waste Water Directive 91/271/EEC discharge requirements in a footprint as small as 0.5 m² — with no chemical dosing, no noise, and no secondary pollution.
Ozone generators in portable, benchtop and cabinet formats plus water tank self-cleaning disinfectors, AOT photo-oxidation catalytic sterilizers and silver ion processors. Prevents bacterial regrowth in storage tanks and oxidizes taste, odour and colour compounds.