Start with the reuse application and acceptance criteria
For a wastewater treatment and water reuse system in Denmark, start with the intended use and required water quality, then select the process train. UF can remove bacteria, colloids and suspended solids without chemicals; MBR combines biological treatment with membrane separation; RO can produce high-purity permeate for demanding process applications. Disinfection remains a separate design decision. A documented Danish plant reused 50,000–70,000 m³ annually after filtration and disinfection, while a 2026 survey covered operators representing approximately 36 % of Denmark’s treatment capacity. The final choice depends on influent characteristics, reuse application, local requirements, footprint and operating resources.
Define each use separately. Process water, facility cleaning, surface flushing, mixing and spraying duties do not necessarily share the same acceptance criteria, exposure pattern or applicable Danish requirements. For every duty, state the required flow, operating duration, water-quality limits, users, application equipment and consequence of a failure to meet specification.
A documented Danish case provides useful examples rather than a universal template. The plant reused treated wastewater for cleaning the facility, flushing surfaces and mixing, reusing between 50,000 and 70,000 m³ annually, according to Danish Clean Water. Each use still needed a defined technical-water specification; the case does not establish that another site may use water in the same way.
Before selecting equipment, request the average influent flow, seasonal and diurnal variation, contaminant profile, current discharge or reuse requirement, available footprint, utilities, installation constraints, sludge characteristics and residual-handling route. Use the wastewater treatment and reuse system selection framework to convert these inputs into a site-specific design brief.
A Danish operator survey covering approximately 36 % of treatment capacity shows active interest in reuse practices, barriers and opportunities, according to Desalination and Water Treatment. It does not prove that a particular reuse application is permitted at your site. Confirm the applicable discharge, reuse and occupational-safety requirements with the relevant Danish authority.
Match the source water to the correct treatment route
Choose the treatment route by identifying the contaminant and water-quality problem, not by selecting a named technology in advance. Industrial wastewater may contain complex contaminants such as heavy metals, pharmaceuticals and chemicals; a Danish market overview identifies membrane filtration, reverse osmosis and advanced oxidation as possible responses. That overview is not evidence that every industrial stream requires all three.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Biodegradable organic load | Biological treatment may be required before physical membrane separation. | Request influent COD, BOD, nutrient concentrations, flow variability and pH. |
| Suspended solids, colloids or particles | UF provides physical separation; an UF water treatment system may be appropriate when the required quality does not demand broader dissolved-solids removal. | Request particle-size distribution, solids loading, required turbidity and backwash or cleaning constraints. |
| Biodegradable industrial wastewater requiring membrane separation | An integrated MBR wastewater reuse system combines biological treatment and membrane separation in one treatment route. | Request organic loading, membrane flux assumptions, footprint, aeration demand and sludge-extraction route. |
| Dissolved salts, heavy metals, pharmaceuticals or other persistent contaminants | RO or advanced oxidation may be needed, potentially after UF pretreatment. | Request the complete contaminant profile, reuse-water specification, concentrate-disposal route and pretreatment needs. |
| Potential reuse contamination | Disinfection must be assigned to the selected duty; do not assume membrane separation satisfies every pathogen requirement. | Request the microbial criterion, application method, monitoring plan and local authority confirmation. |
The following table and framework help align specific contaminants with appropriate treatment technologies. Use the DAF, MBR or AOP wastewater treatment comparison as a process-selection aid, not as a substitute for site analysis. The comparison should be closed only when each proposed unit has a defined contaminant-removal duty and measured influent basis.
Add filtration and disinfection according to the intended use

Filtration and disinfection remain separate decisions from the main treatment train. In the documented Danish case, treated wastewater passed through a water filter before storage, then received on-site disinfection before use as technical water.
That installation generated disinfectant from common salt, water and electricity. Danish Clean Water identifies hypochlorous acid as the active substance and reports control of Legionella, Salmonella and E. coli at the concentrations used. These results apply to the reported installation and water matrix; they do not establish a concentration, dose or performance guarantee for another site.
The operating commitment is material to procurement. The cited installation required weekly salt refilling and twice-yearly service. For another matrix or reuse application, UV or another disinfection technology may be suitable, but only after a documented review of water chemistry, flow, exposure, fouling potential and the required microbial outcome. A UV disinfection system should therefore be compared against chemical disinfection by treated-water quality, operating resources, monitoring and maintenance—not by purchase price alone.
Confirm spraying duties with the relevant Danish authority. The cited plant reports an exemption allowing technical water for spraying tasks under the Danish Working Environment Authority’s regulations on sewage work, etc. That exemption belongs to the documented case; another project should obtain its own written confirmation rather than inherit the precedent.
Build the quotation around performance and site boundaries
Compare bids on complete system scope and measurable acceptance criteria, not equipment labels alone. The quotation should state design flow, peak flow, influent limits, treated-water targets, intended reuse and the applicable Danish compliance basis for the project.
Require the supplier to identify what is included, what is excluded, who owns each interface and what evidence will demonstrate performance. The supplied information contains no comparable Denmark equipment prices, so request an itemized quotation rather than use an unsupported price benchmark.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Core treatment | Process route, design flow, peak-flow handling, treated-water targets, pretreatment and membrane or media replacement. | Performance is stated without influent limits, flow conditions or a named reuse application. |
| Disinfection and storage | Disinfection method, contact provisions, storage volume, turnover, instrumentation and monitoring responsibilities. | Disinfection is assumed rather than specified, or no chemical, salt or power supply is identified. |
| Pumping and utilities | Duty allocation, redundancy assumptions, electrical requirements, water demand and drainage or reject handling. | Installation utilities are left open-ended or excluded without a responsibility schedule. |
| Controls and instrumentation | Control narrative, interlocks, alarms, data logging, remote access and operator interface. | No defined alarm response, setpoint ownership or manual fallback is included. |
| Residuals and consumables | Sludge, concentrate, spent media and chemical handling, plus replacement intervals and first-fill quantities. | The quote treats residual disposal or membrane replacement as outside the contract without stating who bears it. |
| Validation and handover | FAT, site testing, performance demonstration, agreed reuse-performance acceptance, training, documentation and warranty scope. | Acceptance is based only on equipment startup rather than the agreed reuse water quality. |
| Installation and commissioning | Civil works, deliveries, installation, utilities connections, commissioning sequence and site access assumptions. | Civil, electrical or connection works are excluded without a schedule of allowances and responsibilities. |
Clear documentation of site boundaries prevents gaps in contractor responsibilities. For an existing wastewater plant, use the adding tertiary treatment to an existing wastewater plant tender structure to test whether each bidder has included interfaces with the current installation. The operator survey’s coverage of approximately 36 % of Denmark’s treatment capacity indicates active operator engagement with reuse, but it is not a universal adoption rate or a substitute for site evidence.
Select a supplier by capability and lifecycle accountability

A credible bidder must disclose the process capability behind its price and accept responsibility for the lifecycle commitments it proposes. Ask each supplier to state membrane pore size or separation mechanism, design-flow range, treated-water specification and operating-resource assumptions.
Request evidence for delivery, installation, commissioning, operator training, maintenance support and replacement-part availability. For membrane systems, also ask how cleaning, fouling response, membrane replacement and recovered concentrate will be managed. The RO and UF membrane replacement scope should identify what is supplied and what remains the site operator’s responsibility.
Compare lifecycle factors using submitted energy and consumable assumptions, labour requirements, replacement exposure, residual handling and downtime consequences. Danish Clean Water reports that the unit and technical-water filtration system at its cited plant had paid off, leaving operating costs. That is one plant’s calculation, not a Danish equipment-price benchmark and not a basis for assuming savings at another site.
Use the operator-survey findings on reuse practices, barriers and opportunities to ask bidders about reliability, regulatory fit and practical operating constraints. The final selection should follow documented site data, process suitability, acceptance evidence and lifecycle responsibility—not a claim that one technology is universally appropriate.
Frequently Asked Questions
What should a Danish reuse quotation include before comparing prices?
Require each bidder to itemize treatment, disinfection, storage, pumping, controls, utilities, residual handling, installation, commissioning, validation, training, spares and warranty. No comparable Denmark equipment prices are established here, so request a site-specific quotation using the design flow, peak flow, influent limits, reuse application and treated-water targets. Check that performance testing and acceptance apply to the agreed reuse duty rather than merely to equipment startup.
Can UF, MBR or RO be selected from the reuse application alone?
No. The reuse application establishes the required water quality, but the source water determines the treatment route. Request representative influent data, contaminant loading, flow variability and residual-disposal constraints. Use an UF water treatment system when physical separation is the verified duty, an integrated MBR wastewater reuse system when biological treatment and membrane separation are required, and RO or advanced oxidation only where dissolved contaminants justify them.
Does membrane treatment remove the need for disinfection?
Do not assume it does. The documented Danish case combined filtration and storage with on-site disinfection before technical-water use, and its reported microbial control depended on hypochlorous acid generated from salt, water and electricity. For another project, require a pathogen-risk and water-chemistry review that determines whether chemical disinfection, UV or another method is suitable, together with monitoring, consumables and maintenance responsibilities.
How should a buyer evaluate supplier delivery and compliance risk?
Ask bidders to provide the proposed delivery and installation schedule, site-interface assumptions, commissioning plan, operator-training scope, maintenance support and replacement-part arrangements. Require the quotation to identify the applicable Danish discharge, reuse and occupational-safety basis for the project, and obtain confirmation from the relevant Danish authority for the intended use. This check should be completed before purchase order because neither a technology selection nor a supplier catalogue establishes site-specific permission.