MBR integrated unit replacing an older process to reach tighter discharge limits in a rural district.
Project Background
An existing rural sewage system could not reach the tightened discharge standard; the site had no room for larger tanks.
Our Solution
An MBR integrated unit that delivers the higher effluent class in the same footprint, installed as a drop-in upgrade.
Process Train
- 1Screening
- 2Anoxic
- 3MBR (membrane bioreactor)
- 4Disinfection
- 5Discharge
Ref. D-033. Client identity is withheld under our client-confidentiality policy. Capacity is shown as a capacity class (design value rounded up to the next 5 at its second significant digit).