Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

Request a Free Quote

Here's What We Ask Before Quoting

Recent inquiries and the questions that let us answer with a real proposal instead of a generic price list.

Six parameters that make a quote possible

  1. FlowDaily average and peak (m³/day, m³/h)
  2. Influent qualityCOD, BOD₅, TSS, pH; anything unusual (oil, ammonia, chlorine, TDS)
  3. Discharge targetThe standard to meet, or the reuse purpose
  4. Operating hoursContinuous or batch; seasonal changes
  5. Site & civil scopeFootprint, power supply, who builds the tanks
  6. Project stageBudgeting, tender, or ready to order

Food & beverage industrial park effluent

Ref. A-001 · Bangladesh · 1,000 m³/d · Food & Beverage
Preliminary assessment issued · Updated Sep 2026

What we ask first Whether high-TDS streams can be segregated at source, the peak factor per production line, and whether civil works (RC tanks) are local scope or ours.

High-ammonia industrial effluent — stripping unit

Ref. A-002 · Gujarat, India · ~150 m³/d · Chemical & Electroplating
Scoping — awaiting client confirmation · Updated Aug 2026

What we ask first Whether the stripping tower is a stand-alone unit or part of a full ETP, the alkali available for pH lift, and how the recovered ammonia (ammonium sulphate or ammonia water) will be handled.

Community sewage treatment station

Ref. A-003 · Buenos Aires, Argentina · ~35 m³/d · Municipal & Community
Engineering assessment in progress · Updated Aug 2026

What we ask first The discharge or reuse standard that applies (irrigation reuse changes the disinfection stage), the available footprint, and whether operation will be unattended.

Tell Us About Your Project

Fill in your project details below and our engineering team will prepare a customized solution and cost estimate within 24 hours.

Flow, influent, discharge target and site constraints help us prepare a useful response.

We respond within 24 hours. Your information is kept confidential.

What Happens Next?

1
Submit Your Requirements

Fill in the form with your project details and wastewater treatment needs.

2
Engineering Review

Our engineers analyze your requirements and design the optimal solution.

3
Receive Your Quote

Get a detailed proposal with system specifications and pricing within 24 hours.

Direct Contact

[email protected]

+86-181-0655-2851

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us