Desulfurization scrubbers and bag filter dust collectors for industrial flue gas and dust emission control.
HydropureWater's Flue Gas Desulfurization (FGD) Scrubber combines SO₂ removal and particulate collection in a single integrated tower. Using lime/limestone wet scrubbing, it achieves high desulfurization efficiency while producing reusable gypsum byproduct — with no moving parts, low operating cost, and compliance with EPA NSPS, EU Industrial Emissions Directive 2010/75/EU, and World Bank emission guidelines.
The HydropureWater Pulse Jet Baghouse is a high-efficiency fabric filter dust collector engineered for coal-fired boilers and industrial furnaces. Featuring low-pressure long-bag pulse cleaning, an integrated bypass system, and modular construction, it achieves particulate emission levels below 10 mg/Nm³ — meeting EPA NSPS, EU Industrial Emissions Directive 2010/75/EU, and BAT-AEL requirements.