Premium Times Nigeria reported on 7 November 2026 that wastewater and toilet waste from buildings were flowing directly into open public drainage channels across residential and commercial areas of Lagos Island.
The investigation found sewage discharging along streets in Itafaji, including Braimoh-Igbo Street, where nurse Enomfon Okure said she had covered her nose before taking a few steps from her apartment because black wastewater flowed slowly through an open drainage channel beside the road (Premium Times Nigeria).
Key takeaways
- Premium Times Nigeria reported that building pipes were discharging wastewater and toilet water directly into public drainage channels across residential and commercial areas of Lagos Island.
- At Tinubu Square, traders said wastewater and sewage from public toilets and commercial buildings were flowing into the drainage network serving the area, according to Premium Times Nigeria.
- Tailor Ibrahim Abubakar said wastewater regularly flowed through the drains in front of the market, while clothing seller David Nonso said traders had endured the foul smell for years (Premium Times Nigeria).
- The report described closely packed development on Lagos Island, with trader David Nonso attributing the problem partly to buildings being too close together and leaving insufficient space for soakaways (Premium Times Nigeria).
What happened in residential districts
Over several weeks, Premium Times Nigeria visited Braimoh-Igbo Street, Obe Street, Alli Street, Massey Street, Kakawa Street, Okepopo Street, Isale Gangan Street, Adeniji Adele, Tinubu Square and other parts of Lagos Island.
Across the residential and commercial areas visited, the newspaper observed pipes from buildings discharging wastewater and toilet water directly into public drainage channels (Premium Times Nigeria).
Enomfon Okure, a nurse and mother of four, said the foul conditions had become part of her mornings since she moved to the neighbourhood with her family in January 2025 (Premium Times Nigeria). She said: “I don’t allow them to play outside because if they fall into the gutter, it will be dangerous” (Premium Times Nigeria).
Okure said she and her husband eventually decided to send their children back to Akwa Ibom to stay with relatives because of the environment (Premium Times Nigeria).
The problem extends into a commercial district
At Tinubu Square, one of Lagos Island’s busiest commercial centres, traders told Premium Times Nigeria that wastewater and sewage from public toilets and commercial buildings flowed into the drainage network serving the area.
The newspaper observed wastewater and sewage flowing through open drains beside rows of shops as traders and shoppers moved through the commercial district (Premium Times Nigeria).
David Nonso, who sells clothing materials at the square, said: “When people flush, everything goes into the gutters. The smell can be terrible, especially when it rains or when the weather is very hot” (Premium Times Nigeria). He also attributed the problem partly to dense development that left no space for soakaways (Premium Times Nigeria).
Specification read
The report did not state an aggregate wastewater flow, treatment capacity, pollutant concentration or population equivalent, so the affected scale cannot be converted into cubic metres per day or sized from the published information (Premium Times Nigeria).
The reported discharge bears directly on collection and preliminary treatment. A conventional treatment train for mixed domestic wastewater would normally assess screening, primary settling, biological treatment, tertiary treatment and disinfection, with the selected biological process based on the actual flow, organic loading, effluent standard and site constraints. The source does not provide the influent flow, BOD, COD, duty cycle or receiving-water requirement needed to choose among A2O, MBR, MBBR, SBR or UASB configurations. For a plant operator comparing approaches, the Integrated Sewage Treatment route covers the treatment scope, while Municipal infrastructure is relevant where the issue extends across a dense commercial and residential district.
If your plant has direct sewer connections discharging untreated wastewater into open public drains, your enquiry should define flow in m³/day, BOD and COD in mg/L, the required effluent standard and the available footprint before comparing biological configurations or treatment packages (Premium Times Nigeria).
The reported lack of space for soakaways also means that collection, pretreatment and treatment selection must be assessed together rather than treating drainage clearance as an isolated issue (Premium Times Nigeria).
FAQ
What flow rate is needed to scope a treatment plant for the affected Lagos Island communities?
The report did not publish an aggregate wastewater flow, so it cannot support a flow-based plant size. A buyer would need measured or verified flows by drainage catchment, together with the required treatment standard and operating profile. Those inputs would allow screening, primary, biological, tertiary and disinfection stages to be compared (Premium Times Nigeria).
Which treatment process is most suitable where buildings have little space for soakaways?
The source does not provide enough design data to select a process. Buyers should compare screening, primary treatment, biological options and tertiary or disinfection requirements using verified flow, BOD, COD, effluent limits and footprint. The reported space constraint makes those inputs essential rather than allowing a technology to be chosen from the report alone (Premium Times Nigeria).
How should a supplier be selected for a dense urban drainage-sewerage project?
The source identifies dense development and limited space for soakaways as operational constraints, but it does not compare suppliers, costs or delivery schedules. A procurement team should request a scope tied to verified flow, wastewater characteristics, treatment objectives, site access and local execution requirements before asking for a compliant technical and commercial proposal (Premium Times Nigeria).
What information is needed before estimating cost and lead time?
Cost and lead time cannot be estimated from the report because no flow, wastewater analysis, treatment target, capacity, footprint or delivery programme was published. A reliable enquiry should include those items together with information about collection points and discharge points, allowing vendors to define the treatment train, site works and commissioning schedule (Premium Times Nigeria).