Our Wastewater Treatment Equipment
Ozone generators in portable, benchtop and cabinet formats plus water tank self-cleaning disinfectors, AOT photo-oxidation catalytic sterilizers and silver ion processors. Prevents bacterial regrowth in storage tanks and oxidizes taste, odour and colour compounds.
Complete component and consumable supply for RO, UF and softening plants: FRP and stainless tanks, salt and dosing tanks, control valves, pressure gauges, flowmeters, conductivity meters, RO controllers, metering pumps and bulk media including resin, carbon, quartz sand and softener salt.
DF series PVDF flat sheet membrane modules for submerged MBR applications. Features 0.1 μm pore size with integrated aeration box for continuous membrane scouring. Individually replaceable membrane elements, stainless steel frame, and 10–20× lower energy consumption than external cross-flow systems. Available in 80–225 m² configurations producing 32–135 m³/day.
HydropureWater multi-media filters remove suspended solids, turbidity, and colloidal matter from raw water, achieving SDI values suitable for downstream RO membrane protection. Robust, low-maintenance vessels with long-life filter media and automated backwash.