JY series all-in-one water purification system integrates coagulation, flocculation, sedimentation, filtration, and automatic backwash in a single compact unit. Fully automatic operation treats surface water with turbidity up to 3,000 mg/L to below 3 mg/L. Ideal for rural water supply, small towns, industrial process water, and mine water treatment with capacities from 10 to 200 m³/h.
Zhongsheng Environmental industrial RO systems deliver ultra-pure permeate at recovery rates up to 95%, serving pharmaceutical, semiconductor, food & beverage, and power generation applications worldwide. Fully automated PLC-controlled operation with continuous output and minimal chemical consumption.
Zhongsheng Environmental multi-media filters remove suspended solids, turbidity, and colloidal matter from raw water, achieving SDI values suitable for downstream RO membrane protection. Robust, low-maintenance vessels with long-life filter media and automated backwash.