Choose the greywater route before selecting equipment
For a commercial project in Togo, choose UF when the incoming greywater is relatively consistent and the objective is physical filtration before controlled non-potable reuse; consider MBR when biological treatment and membrane separation are required, particularly where greywater and blackwater are combined. Commercial systems commonly collect wastewater, filter or treat it, and pump it for toilet flushing or irrigation. A reliable selection requires source flows, water quality, demand, footprint and local approval inputs, not only a daily capacity estimate.
Commercial greywater consists of wastewater from showers, handwash basins and bathtubs intended for non-potable reuse. Keep blackwater drainage separate unless the project intentionally adopts a combined-wastewater route. This distinction determines whether the treatment train must handle only relatively clean household wastewater or a broader stream requiring biological treatment and tighter process control.
For an existing building where the wastewater streams are already combined, a combined route may be easier to implement. GreywaterAction reports that separating streams can be less cost-effective in that situation and describes MBR treatment of combined wastewater for toilet flushing, irrigation and cooling. That is a general commercial observation, not evidence of conditions or approval requirements in Togo.
Map the intended reuse before selecting equipment. Commercial evidence identifies toilet flushing and landscape irrigation as non-potable applications, while S4 identifies toilet flushing and other non-potable uses. Do not infer drinking-water suitability from filtration performance. For a procurement decision, record whether the treated water will serve toilets, irrigation or another identified use, and then define the corresponding outlet quality and monitoring requirements with the local project professional.
The regional UF and MBR greywater comparison provides additional context, but the technology decision still depends on the actual source streams and project conditions.
Compare UF and MBR for commercial greywater reuse
Select the process by condition, not by membrane label. UF is the more direct option when the source is separated greywater and the required duty is filtration ahead of controlled non-potable reuse. MBR is the relevant option when biological treatment and membrane separation are required, especially for a combined stream or a more demanding biological treatment scope. Neither technology automatically establishes local permission for reuse in Togo.
S4 reports that one supplier’s packaged greywater system filters to 0.02 microns and offers daily treatment capacities from 3,600 to 48,000 litres per day. It also reports 99.99% bacteria removal. These are supplier-specific claims for the offered system, not universal design limits or acceptance criteria. Require the supplier to demonstrate how its selected configuration performs on the project’s expected influent and outlet requirements.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Separated shower, handwash and bathtub wastewater | Use a commercial UF greywater treatment system when physical filtration is the specified treatment scope and the supplied stream is sufficiently consistent for the proposed process. | Hourly and daily source flows, peak-flow profile, water-quality analysis and the required non-potable outlet quality |
| Greywater and blackwater are already combined | Assess an MBR membrane bioreactor for water reuse when biological treatment and membrane separation are required. | Combined-stream composition, treatment objectives, control requirements and available operating footprint |
| Source quality varies substantially or biological load is uncertain | Do not select a filtration package from peak daily flow alone; resolve the process duty with testing and a supplier’s written design basis. | Representative water samples, usage records, contaminant characterization and the supplier’s stated sizing method |
| Required reuse is non-potable but public exposure or system complexity is high | Require a more complete treatment and disinfection assessment, consistent with the commercial observation that higher-use and higher-exposure buildings need more complex systems. | Reuse points, exposure conditions, storage arrangements, monitoring provisions and local project criteria |
Do not infer Togo approval from a micron rating, bacteria-removal claim or package capacity. The available commercial information does not identify a Togo authority, national reuse code or project-specific approval route. The UF versus MBR commercial greywater comparison is useful for process comparison, but German or UK guidance must not be presented as Togo regulation.
Collect the site data that controls sizing and price

Request measured operating data, not building floor area alone. The procurement package should establish hourly and daily source flows, peak-flow conditions, water quality, non-potable demand, footprint, utilities and approval constraints before a supplier fixes the equipment capacity.
- Establish the source streams. Record whether showers, handwash basins and bathtubs can remain separate from blackwater, and whether any existing drainage alterations would combine them.
- Measure supply. Obtain hourly and daily flow records, including peak periods, occupancy variation and expected low-supply conditions.
- Characterise quality. Request representative analysis covering the contaminants relevant to the selected process and intended reuse.
- Define demand. List each toilet, urinal or irrigation point and the operating profile of the non-potable water supply.
- Check installation constraints. Confirm footprint, access for maintenance, electrical supply, pumping distance and operating conditions.
- Confirm approval ownership. Name the Togo authority or project professional responsible for identifying the applicable route and project criteria.
Compare available supply with demand. S4 states that when supply exceeds demand, sizing around demand avoids oversizing and reduces the risk of treated water sitting unused or becoming stagnant. That principle does not remove the need to check peak demand and operational storage requirements.
Require every quotation to state whether its capacity figure represents design flow, daily throughput or instantaneous treatment rate. The available commercial excerpts do not establish a single sizing standard for Togo. Also assign responsibility for the flow survey, water analysis, building drawings, utility information and local-authority correspondence; these inputs should not remain an undefined supplier assumption.
Use the greywater equipment sizing and quotation guidance as a checklist framework, while ensuring that every local requirement is verified for the Togo site.
Set the quotation scope and acceptance criteria
Compare offers on the same process boundary and acceptance basis. State the design flow, source streams, expected influent, required outlet quality, reuse points, storage assumptions and required operating availability in the quotation.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Greywater collection and equalization | Source fixtures, dedicated collection pipework, equalization volume, pumping requirements and backflow/cross-connection provisions | Collection pipework or building-service alterations are omitted, or blackwater is assumed to be separated without confirming the existing drainage |
| Treatment and disinfection | Selected UF or MBR process, treatment duty, disinfection stage, controls and supplier’s stated performance basis | Filtration claims are presented as universal guarantees, or no influent assumptions and outlet criteria are stated |
| Pumping, storage and distribution | Pump duties, storage turnover, dedicated non-potable pipework, reuse connections and physical separation from potable water | No method is specified for preventing cross-connection, or pipework is shown as an uncosted buyer allowance |
| Installation and commissioning | Civil works, connections, electrical work, controls, commissioning activities, training and handover documentation | Installation and commissioning are excluded without a written responsibility matrix and schedule |
| Performance testing and O&M | Mutually agreed sampling method, test conditions, acceptance criteria, monitoring, maintenance plan and documentation | Factory testing is confused with site acceptance, or the test protocol and remedy for failure are not defined |
| Permits and local compliance | Named responsible party, confirmation of the Togo approval route and a schedule for site-specific criteria | The supplier assumes approval without naming the authority, document or client responsibility |
Require a site performance test with a mutually agreed sampling method. The available research supports filtration and disinfection concepts, but it does not establish a Togo discharge standard. Treat 0.02 micron filtration, 3,600 to 48,000 litres per day and 99.99% bacteria removal as supplier claims to verify for the quoted configuration, not as universal acceptance criteria.
Also require the quotation to identify how dedicated collection and distribution pipework are handled and how cross-connection between potable and non-potable systems is prevented. Costing should show exclusions and responsibilities for collection, equalization, treatment, disinfection, pumping, storage, controls, installation, commissioning, training, permits and long-term O&M. S4 notes that commercial-system cost varies with project variables, so a defensible price requires a quotation based on the same defined scope.
Plan verification for the Togo project

Resolve the local approval route before ordering. The commercial information describes treatment practices but does not name a Togo regulator, permit, national reuse code or approval procedure. The project designer or client should identify the applicable authority, submission requirements and site-specific reuse and discharge criteria.
Use academic review material to test the design assumptions, not to invent a local rule. KITopen notes that decentralized greywater implementation depends on technical and legal conditions as well as stakeholder impact. This supports a structured design review involving the owner, designer, operator, local authority and other affected parties, but it does not establish a specific Togo obligation.
Before purchase, assemble the following evidence:
- Permit or approval correspondence identifying the responsible Togo authority and project requirements;
- A design basis covering source streams, measured flows, water quality, demand, footprint and utilities;
- Test certificates for the specified equipment and proposed factory and site test protocol;
- Warranties, installation manuals, commissioning records, operator training materials and O&M procedures;
- A responsibility matrix for design, civil works, pipework, installation, permits, testing, training and maintenance.
Make approval confirmation a pre-order gate. If the responsible local professional cannot identify the applicable route and criteria, the technology and price should remain provisional rather than being converted into an unconditional purchase order.
Frequently Asked Questions
How should daily capacity be calculated when quoting a commercial greywater recycling system in Togo?
Require the supplier to state whether the quoted capacity is average daily throughput, design flow or instantaneous treatment rate, and to provide the calculation inputs. Submit hourly and daily source-flow data, the peak-flow profile, water-quality analysis and non-potable demand. Compare available supply with demand, but do not select equipment from a single daily total.
What is the practical difference between a UF filtration package and an MBR biological treatment system?
UF is a filtration route suited to a separated greywater duty where physical filtration is the defined treatment scope. MBR combines biological treatment with membrane separation and is the more relevant assessment when greywater and blackwater are combined or biological treatment is required. The decision must be confirmed against influent quality, outlet requirements and local reuse criteria rather than a generic technology preference.
What should be excluded from the initial system quotation?
Ask for a line-item scope showing what is included and what is excluded, especially collection pipework, building services, civil works, distribution pipework, permits, electrical work, commissioning, training and long-term O&M. S4 states that commercial-system cost depends on several variables and cannot be represented reliably by a one-size-fits-all price, so no defensible price should be issued without the project data and scope.
Which approvals and evidence are needed before accepting the installation in Togo?
Before ordering, require the project designer or client to identify the applicable Togo authority, submission requirements and project-specific reuse and discharge criteria. Before acceptance, request approval correspondence, the final design basis, applicable equipment certificates, factory-test records, mutually agreed site-test results, cross-connection controls, warranties, commissioning records, training evidence and O&M documentation. No filtration claim should substitute for that approval and acceptance chain.