Choosing wastewater flow and level sensors for a sewer network starts with the conditions at each measuring point and the use of the data, not with a brand. A wet well that foams and surges, a part-full pipe that silts up and a channel that can flow backwards each need a different measuring principle. Veitur's tender notice in Iceland gives the scope and the dates of a coming purchase but leaves the technical specification inside the tender documents. This article is our selection advice and preparation checklist; it is not a reading of the tender documents, not bidding or legal advice, and not a statement of what Veitur requires.
What the Veitur notice says
Notice VEU-2611-0074 names Veitur as the purchaser and the type as a purchase of goods and services. Tender documents were made available on 2026-11-20 at 08:36, and the submission deadline and the opening of bids are both 2027-01-08 at 14:00. The purchaser asks for offers for flow and level sensors (rennslis- og hæðarskynjara) for use in sewer systems (fráveitukerfum), in accordance with the tender terms (source for all details above: the public notice page). It is an invitation to tender, not an award.
Choose by measuring point, not by catalogue
The notice does not describe the measuring points. It states no quantities, sites or technical requirements and points to the buyer's electronic procurement portal for the tender documents. So start from the kinds of point a sewer system usually contains and ask at each one: what do the water surface and the channel look like, what will the reading be used for, and how will the crew reach the instrument? The table is our checklist, not the purchaser's; the answers belong in the tender documents and on site.
| Measuring point | Options to confirm | Evidence to ask for |
|---|---|---|
| Level in a wet well or inspection chamber | Non-contact radar, ultrasonic or submersible pressure | Operating record in comparable chambers |
| Flow in a part-full pipe or open channel | Area-velocity, or a weir or flume with level measurement | On-site verification and comparison data |
| Data output and integration | Signal type, communication path and power source | Interface description and test records |
| Installation and maintenance access | Confined-space entry, lifting, power supply, frost protection | Installation method and maintenance routine |
Level in wet wells and inspection chambers
- Non-contact radar and ultrasonic instruments look down from the top of the chamber, so nothing sits in the wastewater. Foam, a turbulent surface and water vapour disturb ultrasonic echoes more than radar echoes, and a grease layer can send back a signal that does not follow the water line. Ask how false echoes from ladders and pipes are mapped out during set-up.
- Submersible pressure sensors ignore foam and vapour, but grease, rags and silt can coat or bury them, so plan a lifting arrangement and a cleaning interval.
- Turbulence at the inlet makes the surface jump; a stilling arrangement or signal damping may be needed.
Flow in part-full pipes and open channels
- Area-velocity instruments combine a velocity reading with a level reading to compute flow and suit existing sewers that cannot be taken out of service. Silt on the invert changes the cross-section and can bury a bottom-mounted sensor, so ask how deposition is handled.
- A weir or flume with a level sensor gives a fixed level-to-flow relationship, at the cost of head loss and of solids and grease settling upstream; it suits points where these effects can be managed.
- Backwater and reverse flow change both the level and the direction of movement. Ask whether high downstream water can push the flow backwards and whether the instrument must measure in both directions.
Data output and integration
The use of the data decides the output. A level reading for pump control has to arrive quickly and cleanly; a flow reading for reporting has to be stable and traceable. Confirm the signal type (analog current loop, pulse or digital bus), the communication path out of an underground chamber, where a metal cover can block radio, and the power source. None of this is stated on the public page; take it from the tender documents.
Installation and maintenance access
Most sewer measuring points are confined spaces. Reaching them can call for an entry permit, gas testing, ventilation, lifting gear and traffic control, so prefer an instrument that can be checked from the surface. Allow for frost on exposed parts, snow on covers and weaker battery output in cold weather.
What to have ready before 2027-01-08
The submission deadline and the opening of bids are both 2027-01-08 at 14:00. We suggest one file per offered measuring point, built from the items below. This is our preparation checklist, not a list of requirements set by Veitur.
- Datasheet for the point: measuring principle, wetted materials and mounting position.
- Installation description: access, fixing method, power, communication and frost protection.
- Calibration and verification method: how the reading is checked on site and re-checked after cleaning.
- Maintenance and spare parts plan: cleaning interval, consumables, spares and who does the work.
- References from comparable sewer applications, with the chamber or channel conditions stated.
- Delivery time: stated plainly, with the assumptions it depends on.
Questions on quantities, sites, accuracy class, output signal or the evaluation method should go through the purchaser's contact channel given in the tender documents. The public page does not describe a question-and-answer period, so do not plan on one.
Selection mistakes to avoid
- Choosing a brand first. One model rarely suits every chamber; a principle that works in a calm wet well can fail in a silting, surging pipe.
- Treating level as flow. Converting one level reading with an assumed cross-section ignores silt, backwater and reverse flow; confirm whether the point needs a velocity measurement or a hydraulic structure.
- Reading the notice as the specification. The public page gives the scope and the dates only; accuracy class and evaluation method have to come from the tender documents.
Related reading on this site
The pages below are general engineering references from our site, not equipment selected for the Veitur procurement. For level instruments in pump stations, see Radar Level Transmitter in Sewer Lift Stations: 2026 Engineering Guide. For comparing metering principles, see Flow Meter Wastewater Treatment: Best Types, Selection & ROI Guide. For the country context, see Wastewater Treatment in Iceland.
FAQ
What does the Veitur notice not say?
It gives no quantities, sites or number of measuring points, and no measuring principle, accuracy class, output signal or evaluation method. Look for these in the tender documents reached through the buyer's electronic procurement portal.
Which measuring principle suits a sewer level measuring point?
It depends on the chamber. Examine non-contact radar first where foam, vapour or grease would disturb an ultrasonic echo or foul a submerged sensor; ultrasonic instruments can be enough in calmer chambers; submersible pressure sensors suit points where the sensor can be lifted and cleaned regularly. Confirm the required performance from the tender documents.
Where does the area-velocity method fit?
In existing part-full pipes and open channels that cannot be taken out of service, where a velocity reading and a level reading can be combined to compute flow. Check silt, backwater and possible reverse flow first, because each changes the relation between level and flow.
What should a supplier have ready before the deadline?
A datasheet per offered measuring point, an installation description, a verification method, a maintenance and spare parts plan, comparable sewer references and a stated delivery time. The deadline is 2027-01-08 at 14:00, when the bids are opened as well. Questions go through the purchaser's contact channel in the tender documents.