Start with the reuse application and measured demand
For a greywater recycling system in Mexico, the immediate decision is whether the project should proceed as a localized pilot and whether UF or MBR is justified by measured flow and water quality. In Mexicali, reported greywater generation was 170–176 L·capita−1·day−1, but most raw samples exceeded regulatory limits for organic load and turbidity even for non-potable uses. Mexico lacks a dedicated greywater-management regulation; NOM-003-SEMARNAT-1997 only indirectly provides treated-wastewater reuse criteria. Therefore, do not select equipment from daily flow alone: obtain source-by-source flow and raw-water test data, confirm the reuse route with the relevant authority, and define acceptance criteria before requesting quotations.
Define each intended reuse point before selecting a membrane or packaged treatment system. Specify whether reclaimed water will serve toilet flushing, irrigation, washing or another non-potable demand, and identify the water-quality basis required for that use. A treatment objective without a defined receiving application does not support an equipment selection.
Request average and peak flow for each source, operating hours, storage requirements and expected variability. Separate laundry, showers, sinks and kitchen drains because each stream changes the treatment problem. Do not include kitchen wastewater automatically: the sources identified in the Mexicali review included showers, sinks and laundry, while the cited raw-water characterization focused on domestic washing machines.
The Mexicali study reported greywater generation of 170–176 L·capita−1·day−1. Use that result as a site-study reference, not a universal Mexican sizing factor. A separate review reported wastewater generation in Mexico reaching up to 154 L per capita per day, but that broader figure is not interchangeable with measured greywater flow. The comparison of UF, MBR and package-plant greywater routes is useful only after the site’s actual reuse demand is established.
Test the untreated water before choosing treatment
Direct diversion should not be treated as the default. In the Mexicali study, most raw samples exceeded permissible regulatory limits for organic load and turbidity even for non-potable uses, indicating that untreated domestic greywater required pretreatment before reuse. The same review reported a scaling risk in conveyance and treatment systems and identified softening or precipitation-control stages as considerations; it did not establish a universal pretreatment specification for every Mexican site.
Obtain laboratory and operating data for turbidity, suspended solids, organic load, microbial indicators, detergents, hardness and salts. Match sampling locations to the actual source streams and include repeat samples across representative operating conditions. Ask the laboratory and the local authority for written acceptance criteria: the research does not provide a complete numerical acceptance table for a Mexican greywater project.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Direct diversion to a non-potable use | Proceed only if source characterization supports the proposed reuse without treatment. | Reuse-point demand; source-by-source turbidity, suspended solids, organic load, microbial indicators and detergent results. |
| High turbidity, suspended solids or organic load | Evaluate biological pretreatment, UF or MBR rather than relying on direct reuse. | Raw-water matrix, hydraulic profile, required clarification or solids removal, and the receiving application. |
| Hardness or scaling tendency | Assess whether softening or precipitation control is needed before membrane treatment. | Hardness, salts, temperature and operating data; confirmation from the relevant Mexican authority or project engineer. |
| Microbial exposure at the reuse point | Define the required disinfection and polishing sequence. | Microbial indicators, intended users or application, exposure route, storage conditions and local technical requirements. |
UF is a solids-separation barrier rather than a substitute for biological treatment. If the raw water carries substantial organic load, evaluate a hollow-fiber UF greywater treatment system only after identifying the required upstream biological and pretreatment stages. An integrated MBR greywater reuse system combines biological treatment with membrane separation, but that configuration still depends on the raw-water matrix and operating controls.
Compare UF, MBR and package-treatment routes

Route selection depends on contaminant removal, hydraulics and operating conditions rather than membrane type alone. Compare each option against the same measured source flow, reuse application, footprint, utilities, automation level, solids-handling requirement and available operator skill.
Use UF when the wastewater has already received suitable biological and pretreatment stages and the decision concerns solids separation or final polishing before a defined reuse. Use MBR when the project requires an integrated biological treatment and membrane-separation train and can support its electrical, control, cleaning and membrane-maintenance requirements. In either case, request the detailed UF versus MBR selection method for a route-by-route assessment rather than accepting a generic performance claim.
Consider a packaged biological route when decentralized installation is the stated objective. The WSZ package combines anoxic and aerobic biological contact oxidation, sedimentation and disinfection in one buried unit. Compare that arrangement with the WSZ underground integrated sewage-treatment option, but require the supplier to explain how its process train applies to the defined greywater sources. The product scope is not proof of suitability for a particular reuse.
- If the raw-water data show high organic load and solids, do not shortlist UF as a stand-alone solution.
- If biological treatment and membrane solids separation must be integrated and adequate technical support is available, develop an MBR alternative.
- If decentralized deployment, access and operating staffing favor a packaged biological unit, request a complete package-train proposal and verify its reuse-performance basis.
- Compare all shortlisted routes against the same source flow, water-quality objective, receiving application, footprint and commercial scope.
For collection and treatment alternatives, a greywater treatment option comparison for Latin America can support route screening, but Mexican regulatory verification and site-specific acceptance criteria remain separate decisions.
Verify the Mexican compliance and pilot route
Regulatory route confirmation must precede equipment specification. The Mexico-focused review identified the absence of a current, specific regulation governing greywater management in Mexico. NOM-003-SEMARNAT-1997 was the only indirect reference identified in the research; it establishes water-quality criteria for treated-wastewater reuse without explicitly distinguishing greywater from blackwater.
Ask the relevant authority, identified for the project location, whether the proposed activity will be treated as reuse, discharge, a decentralized pilot or another regulated route. Request the applicable documents and written confirmation of the permit authority, local technical requirements and intended reuse criteria. A literature review or academic study is not a permit and cannot resolve a site-specific compliance question.
For an early deployment, the utility in the Mexicali study considered localized pilot projects viable, particularly within newly constructed housing developments. That supports considering a pilot route, but it does not remove the need for site-specific institutional confirmation. Define the pilot’s duration, monitoring plan, operating responsibility, end-use controls and decision criteria before equipment purchase.
Separate verified requirements from missing information. The verified regulatory position is the identified gap in dedicated Mexican greywater rules and the indirect reference to NOM-003-SEMARNAT-1997. The unresolved project inputs are the governing authority, approval route, numerical reuse limits, discharge conditions and local technical requirements that apply to the specific site.
Build an RFQ scope and screen commercial red flags

Suppliers should quote verified site data and unresolved approvals rather than presenting a generic package. Require each bidder to state its design flow, hydraulic profile, included source streams, raw-water basis, treatment objective, reuse point and assumed approval route. Tie guarantees to agreed site data and defined acceptance tests.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Collection, equalization and storage | Source inlets, screens or traps, pumping, equalization volume, operating schedule and drainage provisions. | Design flow is omitted, kitchen drainage is assumed without confirmation, or storage is excluded. |
| Treatment and polishing | Complete process train, treatment objective, pretreatment basis, membrane or biological configuration, disinfection and reuse-point outlet duties. | UF is offered as the sole response to high organic load, or generic guarantees replace source-water requirements. |
| Reuse distribution and controls | Distribution to each identified reuse point, controls, alarms, utility connections and access arrangements. | Reuse points are not coordinated with the hydraulic design, or automation is described without site conditions. |
| Utilities, commissioning and training | Electrical demand, water and chemical inputs, commissioning tests, training, O&M manual and spare-parts schedule. | Civil works, utility upgrades, installation, training or long-term consumables are excluded without clarification. |
| Performance and compliance | Agreed test methods, acceptance conditions, sampling responsibility, regulatory assumptions and document deliverables. | The supplier claims universal Mexican compliance without identifying the authority, route or applicable criteria. |
Before signature, require the treatment train, electrical requirements, drawings, controls narrative, O&M manual, commissioning plan, acceptance-test method and long-term consumables schedule. Require any excluded civil work, installation item or utility connection to appear explicitly in the commercial offer. Unsupported compliance statements, omitted flow data, generic water-quality guarantees and unexplained civil-work exclusions are reasons to hold signature and require clarification.
Frequently Asked Questions
Which measured data should be supplied to obtain a meaningful equipment quotation?
Provide average and peak greywater flows by source, operating schedules, storage requirements, source-stream definitions and the intended reuse points. Include raw-water test results for turbidity, suspended solids, organic load, microbial indicators, detergents, hardness and salts. Also provide the jurisdiction, available footprint, utilities, access, drainage, treatment objective and staffing information. These are project inputs to request, not values the supplier should infer from a national average.
When is UF preferable to MBR, and what pretreatment limitation applies?
Prefer UF for solids separation or polishing when suitable biological treatment and any required pretreatment already address the raw-water organic load. Choose an MBR configuration when integrated biological treatment and membrane separation suit the reuse objective and the site can support membrane operation, cleaning and controls. UF is not a substitute for biological treatment of high-organic-load greywater; confirm the required upstream process from the site data.
How should the site define acceptance criteria without a dedicated national greywater standard?
First obtain written direction from the relevant authority on whether the project is reuse, discharge, a decentralized pilot or another regulated route. Then combine the applicable authority requirements with the receiving application and the measured raw-water matrix. Specify each acceptance parameter, test method, sampling location, frequency and responsible party. NOM-003-SEMARNAT-1997 may provide indirect treated-wastewater reuse criteria, but the research does not establish it as a complete greywater-specific acceptance regime.
What delivery, installation, training and operating-cost items should appear in the supplier’s scope?
Request separate pricing for equipment delivery, installation, civil and mechanical connections, electrical supply, controls, utilities, commissioning, training, initial chemicals and membranes, maintenance, operator support and long-term consumables. Also require the spare-parts schedule and exclusions list. Without a quotation, the buyer should request these items as individually priced alternatives rather than accept an undisclosed package total or assume that civil works and operating costs are included.