Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation
Industry News

Engineer presents sewage-to-wealth systems in Lagos, Nov 2026

Engineer presents sewage-to-wealth systems in Lagos, Nov 2026

At a wastewater-engineering lecture in Lagos, Engr. Fadipe Oladele Elnathan presented a hybrid anaerobic-aerobic sewage treatment plant and ELNAT 100 Series biodigesters that recover biogas, treated water and fertiliser from sewage; one operational model produces 262 cubic metres of biogas per day, equivalent to 118 kg of LPG, according to Daily Champion Newspaper.

In a report published on 13 November 2026, the newspaper said Fadipe addressed engineers at the 17th Ralph Alabi Memorial Public Lecture organised by the Nigerian Society of Engineers Ikeja Branch in Lagos on 11 November 2026, where he called for engineering solutions to be developed as businesses that can scale, rather than remain confined to technical problem-solving Daily Champion Newspaper.

Key takeaways

  • One operational sewage-treatment model produces 262 cubic metres of biogas per day, equivalent to 118 kg of LPG Daily Champion Newspaper.
  • Independent laboratory analyses at three sites reported COD and BOD reductions exceeding 99 percent in several cases, with effluent meeting or approaching regulatory standards for discharge and reuse Daily Champion Newspaper.
  • ELFAD Concept Limited uses a hybrid anaerobic-aerobic sewage treatment plant and ELNAT 100 Series biodigesters to produce biogas, non-potable treated water and nutrient-rich digestate for agriculture Daily Champion Newspaper.
  • Many installations are positioned beneath driveways, car parks or landscaped areas, recovering land that conventional septic systems would occupy Daily Champion Newspaper.

What happened

The source described a Nigerian wastewater system that treats raw sewage while recovering several outputs. ELFAD Concept Limited’s hybrid anaerobic-aerobic treatment plant and ELNAT 100 Series biodigesters convert sewage into cooking and power fuel, treated water for non-potable reuse and nutrient-rich digestate for agriculture Daily Champion Newspaper.

Laboratory analysis at a supermarket in Ikeja GRA, a flour mill in Calabar and a facility in Lekki Phase 1 found COD and BOD reductions exceeding 99 percent in several cases, while the effluent met or approached regulatory standards for discharge and reuse Daily Champion Newspaper. The reported figures are reductions rather than final effluent concentrations, so the source does not provide the inlet loading, final BOD or COD values in mg/L, or the specific discharge and reuse conditions applied.

The newspaper reported that one operating model produces 262 cubic metres of biogas per day, equivalent to 118 kg of LPG, alongside treated water and an annual fertiliser potential measured in tens of thousands of kilogrammes Daily Champion Newspaper. No plant-wide wastewater treatment capacity, population-equivalent loading, capital cost or delivery schedule was reported for that model.

Fadipe, identified by the source as the Nigerian Society of Engineers Engineer of the Year 2025 and overall winner of the 2025 NSE Innovation Competition, presented a six-stage pathway: Identify, Investigate, Design, Test, Commercialise and Scale Daily Champion Newspaper. He also assigned engineers a 90-day practical task to select a real problem, cost it, design a response and demonstrate a pilot Daily Champion Newspaper.

“A Problempreneur is an engineer who sees a problem others have learned to live with, and builds a business that solves it,” said Fadipe, managing director and chief executive officer of ELFAD Concept Limited Daily Champion Newspaper.

Specification read

The reported biogas output can be expressed consistently as 262 m³/day, but the source did not report the corresponding wastewater flow in m³/day or a population-equivalent capacity. It also did not state whether that figure applies to one plant or a combined operating model, so buyers should not convert it into a design flow without confirmation. The reported 118 kg of LPG is an energy-equivalent comparison rather than a wastewater-treatment capacity Daily Champion Newspaper.

For a conventional municipal treatment train, the relevant sequence is screening, primary treatment, biological treatment—such as A2O, MBR, MBBR, SBR or UASB—and tertiary treatment or disinfection, with DAF or ZLD where solids, polishing or water recovery requires them. This event bears directly on the anaerobic-aerobic biological stage and on integrated resource recovery; the source did not identify the inlet screening, primary, tertiary, disinfection or solids-handling configurations, nor whether DAF or ZLD was present Daily Champion Newspaper.

If your plant enquiry involves a 262 m³/day biogas-recovery model for industrial or commercial wastewater, reported COD and BOD reductions exceeding 99 percent, and pressure to meet discharge or non-potable reuse standards, this is what it means for you: evaluate the biological process for both treatment performance and recovered gas, then verify flow, final BOD/COD in mg/L, compliance limits and the balance of the treatment train. Plant and process context can be compared through our municipal wastewater overview and our integrated sewage treatment systems, while food-sector comparisons are covered in DAF versus clarifier treatment for food and beverage wastewater.

FAQ

What wastewater flow and population equivalent does the 262 m³/day biogas model handle?

The source reports 262 cubic metres of biogas per day, equivalent to 118 kg of LPG, but does not state the corresponding wastewater flow, plant capacity or population equivalent Daily Champion Newspaper. A buyer should request wastewater flow, design loading and the number of installations covered before sizing treatment equipment.

What final BOD and COD can the sewage treatment systems achieve?

Independent analyses at three reported sites found COD and BOD reductions exceeding 99 percent in several cases, with effluent meeting or approaching regulatory standards for discharge and reuse Daily Champion Newspaper. The source does not provide final effluent concentrations in mg/L, so those values and the applicable limits must be confirmed for the proposed plant.

What does the project cost, and how long will delivery and commissioning take?

Neither capital cost nor delivery and commissioning time was reported. The only time-bound action was Fadipe’s 90-day assignment for engineers to demonstrate a pilot, which was an instructional challenge rather than a procurement schedule Daily Champion Newspaper. Obtain a supplier quotation, delivery programme and commissioning plan before selecting equipment.

How should a buyer select a supplier for a biogas-recovery wastewater plant?

The reported evidence points to verified treatment performance, site-tested operation and the ability to recover usable products. Independent laboratory analyses were reported, along with 262 cubic metres of biogas per day from one operating model Daily Champion Newspaper. A buyer should request reference-site data, test protocols, guarantees tied to inlet loads and an explanation of how gas, treated water and digestate will be used.

References

  1. Nigerian Engineer turns sewage crisis into wealth: NSE Engineer of the Year Champions “Problempreneur” revolution

Related Articles

DAF vs. Clarifier for Food & Beverage Wastewater in 2026
Nov 18, 2026

DAF vs. Clarifier for Food & Beverage Wastewater in 2026

Compare DAF and clarifiers for food and beverage wastewater, including FOG removal, energy use, siz…

AI Growth
Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us