Plate and Frame Filter Press for Sludge Dewatering
Zhongsheng Environmental plate and frame filter presses deliver efficient solid-liquid separation for municipal and industrial sludge dewatering, with filtration areas from 1 m² to 500 m² and manual, hydraulic, or fully automatic PLC-controlled operation.
High-Efficiency Sedimentation Tank (Lamella Clarifier)
Zhongsheng Environmental high-efficiency sedimentation tanks (lamella clarifiers) combine sludge recirculation, flocculation, and inclined-plate separation in a single compact structure — achieving surface loading rates of 20–40 m/h while reducing chemical consumption by up to 30%.