Set the reuse endpoint before selecting a treatment train
The right greywater recycling system in Switzerland depends mainly on the reuse endpoint, incoming water quality, required control of solids, pathogens and organic load, and the available footprint. Eawag describes greywater as the wastewater stream with the highest water volume and lowest pollutant concentrations, while identifying irrigation and toilet flushing as established reuse applications. A UF-based route is appropriate when the design objective is membrane filtration without biological treatment; an MBR route combines biological treatment with membrane separation; and a biological package may suit sites with suitable wastewater characteristics and discharge access. Swiss requirements must be verified for the specific reuse route and site before equipment is ordered.
Begin by defining the intended fixture, exposure pathway and required reuse water quality. Eawag identifies irrigation and toilet flushing as reuse applications for treated greywater and notes that advanced treatment can support higher-quality uses. Not every reuse endpoint can be met by a particular package.
The two risk-review scenarios in the S2 microbial-risk study are toilet flushing and food-crop irrigation. For toilet flushing, identify the fixture supply, flush characteristics and whether storage or distribution creates additional contact points. For food-crop irrigation, identify whether the proposal involves contact with edible crops, the irrigation method and the exposure route. The S2 study found that a lack of health-risk assessment hindered the popularity of on-site non-potable reuse, so the project should require a microbial-risk assessment rather than rely on treatment descriptions alone.
Ask the prospective treatment supplier to provide the proposed output-water specification and the documents that demonstrate compliance with it. The site owner should also confirm whether the water will enter a potable-water plumbing system or remain segregated as non-potable water. The latter arrangement may require confirmation that cross-connections and backflow risks are controlled.
Compare UF, MBR and biological treatment routes
Select the treatment architecture by matching required process functions to verified influent and reuse data, rather than choosing a technology from its generic description. The available evidence supports functional distinctions but provides no verified Swiss capacities, prices or site-specific treatment limits.
- UF: A hollow-fiber ultrafiltration system performs membrane filtration without biological treatment. Consider this option only after establishing whether the required organic-load and pathogen controls can be achieved without upstream biological conversion.
- MBR: An integrated MBR membrane bioreactor combines biological treatment with membrane separation. This is relevant where biological conversion and membrane solids separation must operate as an integrated treatment train.
- Biological package: A packaged biological route may be suitable where the influent characteristics, treatment objectives, discharge access and maintenance arrangements support that architecture. The relevant project evidence should demonstrate whether the package provides the required solids, organic-load and microbial treatment without an unresolved gap.
Eawag characterises greywater as the highest-volume, lowest-pollutant-concentration wastewater stream. The S5 review adds that generation rates are influenced by lifestyle, fixture types and climatic conditions, while contaminants are associated with detergent type and household practices. These observations provide context, not a basis for assuming that a Swiss site will meet a supplier’s design condition.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Reuse in toilets | Consider UF, MBR or biological treatment according to the required organic-load, solids and microbial controls; do not treat membrane filtration alone as proof of suitability. | Intended fixture, daily and hourly flow, influent COD and BOD, suspended solids, turbidity, pathogens and required reuse water-quality profile. |
| Irrigation involving food crops | Require a project-specific microbial-risk assessment and a treatment train that addresses the identified exposure route. | Crop-contact proposal, irrigation method, source-stream contributions, detergent indicators, pathogen data and monitoring plan. |
| High organic load or variable source streams | Favor a route with documented biological conversion where the analysis confirms that requirement; compare that function with UF and assess UF and MBR options. | Fixture-by-fixture greywater contributions, detergent profile, sampling results and the complete treatment-train concept. |
| Solids separation is a stated requirement | MBR integrates biological treatment with membrane separation; UF provides filtration without biological treatment, so its position in the train must be justified. | Clarified solids target, downstream clarification requirement, membrane performance data and effluent specification. |
| Available footprint, utilities or installation access is constrained | Do not recommend a capacity until skid dimensions, utilities and access are reconciled with the site. | Available footprint, electrical and utility requirements, drainage routes, delivery access and installation constraints. |
Before comparing quotations, use the UF-versus-MBR comparison for greywater recycling to frame process functions. For a wider route review, assess UF, MBR and packaged biological treatment, while keeping the Swiss site inputs separate from examples from other jurisdictions.
Build the Swiss site and compliance input pack

The project engineer or site owner must confirm the Swiss discharge or reuse route and the competent review body; the available research does not establish either a permit limit or an approval route for a specific site.
- Establish the water route. State whether treated greywater remains on site for reuse, is discharged to a sewer or enters another discharge route, and identify the receiving-water context if relevant.
- Identify the competent authority. Request confirmation of the authority or review body responsible for the proposed reuse and discharge arrangement at the project location.
- Define the permit basis. Obtain the applicable permit conditions, treatment objectives and monitoring requirements in writing. Do not infer a Swiss treatment capacity, effluent limit or approval date from the available evidence.
- Complete the site data package. Request daily greywater flow and the hourly profile, source streams and fixture contributions, influent analysis, reuse demand, available footprint, utilities and installation access.
- Confirm monitoring. Eawag’s research includes online monitoring of chemical and microbial quality of treated greywater. Ask the supplier to state which parameters can be monitored, where, by which method and how results will be recorded.
For the influent package, request suspended solids, turbidity, COD, BOD, pathogens and detergent indicators. The source-stream list must distinguish bathroom, laundry and kitchen contributions where relevant, because S2 analyzed household greywater from those sources and S5 identifies fixture type, lifestyle and detergent use as influences on generation and contaminants.
Ask for representative sampling records and the sampling plan used to establish the design basis. A supplier should identify any assumption, exclusion or additional test required before it can guarantee a duty point or treatment objective.
Convert the selection into an RFQ and acceptance checklist
A comparable quotation must state the design basis and include the treatment objectives, performance tests and operating responsibilities. Values should remain open until the site inputs and Swiss compliance route are confirmed.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Design and duty basis | Daily and hourly greywater flow, source streams, measured influent characteristics, reuse demand, design objectives and operating conditions. | Unstated flow assumptions, generic “typical” influent data, or no stated boundary between treatment and downstream storage. |
| Treatment train | Pre-treatment, UF, biological treatment, membrane separation, post-treatment and disinfection or other microbial-control steps where justified. | Process functions omitted, membrane filtration presented as biological treatment, or an unverified claim that the package meets the reuse endpoint. |
| Reuse water quality | Required output parameters, sampling points, test methods, monitoring frequency and response actions for out-of-limit results. | No output specification, reliance on equipment name alone, or undefined acceptance authority. |
| Microbial risk and verification | Scenario-specific microbial-risk assessment for toilet flushing or food-crop irrigation, as applicable, together with the proposed verification approach. | Generic disinfection claims without exposure assumptions, pathogen monitoring or a defined verification method. |
| Utilities and installation | Footprint, drainage connections, electrical and water-service requirements, utilities demand, access requirements and installation interfaces. | Excluded site works, unpriced civil works or installation constraints absent from the commercial schedule. |
| Commissioning and acceptance | Pre-start checks, functional tests, performance tests, sampling plan, acceptance criteria, training, as-built documents and operating manual. | Commissioning limited to demonstrations, no measurable acceptance test, or final payment before required documents and training are delivered. |
| Lifecycle and operating costs | Request a cost-and-performance basis covering membrane or consumable replacement, maintenance, energy and utilities, monitoring, controls, sludge or residuals handling, and specialist service support. | Prices excluded without an estimating basis, no maintenance schedule, or exclusions for consumables and waste streams. |
| Swiss compliance interface | Permit assumptions, authority information, evidence supporting the proposed route and a schedule of supplier information required for approval. | Claimed blanket approval, invented permit limits, or unclear responsibility for site-specific submissions and regulatory liaison. |
Use the IWA Publishing technoeconomic source as the basis for requiring cost and performance to be presented together rather than requesting an isolated purchase price. Request the currency, pricing basis, included scope and exclusions, but do not insert an assumed price or consumption value before flow, utilities and treatment objectives are known.
Require the supplier to state who owns each risk: performance demonstration, instrumentation, calibration, sample collection, laboratory analysis, residual handling, operator training, maintenance and regulatory documentation. The S2 study supports requiring a defined microbial-risk approach for the selected scenario and its verification method.
Frequently Asked Questions
Which site data control the choice between UF, MBR and biological treatment?
The controlling inputs are the intended reuse endpoint, daily and hourly flow, source-stream composition, measured influent characteristics, reuse demand, footprint and utilities. Ask the site owner for flow records, fixture contributions, suspended solids, turbidity, COD, BOD, pathogen and detergent data, plus an influent sampling plan if these measurements do not exist.
How should UF and MBR be compared for greywater reuse?
Compare UF as membrane filtration without biological treatment against MBR as an integrated combination of biological conversion and membrane separation. The deciding evidence is the required organic-load, solids, pathogen and reuse-water-quality performance under the verified site conditions, not the membrane category alone.
What should be included in a costed quotation?
Request equipment, pre-treatment, the complete treatment train, utilities, installation interfaces, commissioning tests, monitoring, training, documentation, maintenance, consumables, residuals handling and lifecycle service scope. Require the quotation to identify exclusions and the cost-and-performance basis, while leaving all values open until the design inputs are available.
Which Swiss compliance items must be verified before delivery?
Verify the discharge or reuse route, receiving-water context, applicable permit conditions, competent review body, required output-water specification and site-specific obligations before accepting delivery. Obtain those items from the project authority or project engineer; the available research does not establish a Swiss permit limit, treatment capacity, approval date or named authority for the site.