Set the Irish route and reuse objective
Selecting a greywater recycling system in Ireland requires determining whether the project needs direct diversion, ultrafiltration (UF) or an MBR system. Start with the greywater sources, peak flow and intended reuse: academic evidence separates low-load streams from higher-load kitchen or laundry wastewater (S4). Direct diversion can suit non-potable uses, UF is a physical treatment option, and MBR combines biological treatment with membrane filtration. Northern Ireland guidance references the Building Regulations (NI) 2012 (as amended) and DAERA pollution-prevention guidance, but the final route must still be verified against the site and jurisdiction (S2).
Confirm whether the site is in the Republic of Ireland or Northern Ireland before treating one approval route as universal. For Northern Ireland, record the Building Regulations (NI) 2012 (as amended) and DAERA pollution-prevention guidance as items to verify with the relevant authority, rather than assuming that the guidance quoted by a supplier is the complete approval basis (S2).
Define the destination before selecting equipment. Uisce Éireann identifies toilet flushing, watering plants and washing external areas as principal business uses for greywater (S5). Record whether the reclaimed water will have direct human contact, enter a potable-water plumbing arrangement, or be used in another non-potable application. That decision determines the performance evidence, sampling points and approval discussions that the design authority needs to complete.
Ask the local authority or commissioning body what evidence it requires. Request the applicable approval route, reuse conditions, required water-quality parameters, sampling method, witnessing requirements and responsible operator. A generic statement that greywater is “suitable for reuse” does not establish compliance for a particular site.
Compare direct diversion, UF and MBR
Classify the incoming streams before comparing equipment. The review by Water Science & Technology defines low-load greywater as excluding kitchen and laundry streams, while high-load greywater includes kitchen and/or laundry wastewater (S4). This source classification is a general treatment reference, not an Irish approval standard, so it should be combined with site-specific water quality and the intended reuse.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Suitable low-load stream for a defined non-potable reuse | Consider direct diversion where the route, storage conditions and reuse objective do not require the additional treatment provided by UF or MBR. | Source inventory; average and peak flow; storage requirement; reuse destination; available gravity gradient; the local authority’s acceptance basis. |
| Greywater requiring physical separation before reuse | Consider an ultrafiltration system for Irish greywater treatment, while obtaining confirmation that the selected membrane process is appropriate for the actual stream and acceptance criteria. | Water-quality analysis; source segregation; required solids removal; reuse destination; footprint; cleaning and maintenance access. |
| Kitchen and/or laundry wastewater included, or a more comprehensive biological treatment requirement | Consider an MBR membrane bioreactor for greywater reuse where biological treatment and membrane separation form part of the specified process. | Measured contaminant load; organic and solids characteristics; flow profile; treatment objectives; required footprint; utilities; sludge and membrane maintenance provisions. |
| Site with restricted gravity, footprint or maintenance access | Do not select on treatment name alone. Compare the route against pumping, electrical demand, installation constraints and the supplier’s operating obligations. | Available gradient; available footprint; electrical supply; drainage routes; access for maintenance; response times and local service support. |
The route comparison should end with a written design basis, not a product preference. If the project includes kitchen or laundry flows, do not treat a low-load assumption as the design basis until the supplier has seen the source data. The academic treatment evidence is geographically general, while the Irish guidance provides the jurisdictional context; neither replaces project-specific approval.
Collect the site data that settles the equipment choice

Obtain a measured flow and demand basis before requesting equipment pricing. The supplier needs average and peak greywater flows, operating hours, storage requirements and the number and type of fixtures contributing to the stream. Without those inputs, neither the treatment duty nor the storage provision can be checked. Ask for a site water audit or equivalent measurement record; the Uisce Éireann water conservation guidance identifies water audits as the starting point for business water-use management (S5).
Document source segregation, especially whether kitchen or laundry wastewater is included. S4 identifies this distinction when comparing treatment requirements, while the composition of greywater is influenced by fixture types, lifestyle, detergents and household practices in the broader review (S3). Request water-quality data rather than asking the supplier to infer contaminant load from the label “greywater.”
Collect the physical constraints needed for installation planning: available gravity gradient, footprint, drainage routes, electrical supply and maintenance access. Identify whether pumps, electrical components or continuous operation are acceptable at the site. The Northern Ireland source describes designs that avoid pumps and electrical components where the site gradient allows, but that is a design strategy rather than a universal specification (S2).
Finally, ask the site owner or design authority to identify the intended reuse standard, required sampling points and the authority or commissioning party that will verify compliance. Record who owns the reclaimed-water system after handover, who performs routine checks and who responds to an alarm or non-compliant result.
Build an RFQ scope and screen supplier claims
Require each quotation to state the duty basis, flow basis, source streams, reuse destination, treatment process, supplied equipment, utilities, installation scope and exclusions. If those items are missing, the quote cannot be compared consistently because different suppliers may be pricing different boundaries. The RFQ should also identify the approval route being assumed and require any departure from it to be stated in writing.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Design basis and equipment duty | State source streams, average and peak flow, operating hours, storage requirement, reuse destination and measured water-quality basis. | A quote based only on “commercial greywater reuse” without source segregation, flow basis or reuse conditions. |
| Treatment process | Name each treatment stage and explain its purpose, including storage, solids separation, membrane or biological treatment, and disinfection where proposed. | Direct diversion, UF and MBR presented as interchangeable without explaining why the selected process fits the influent. |
| Supply and installation boundary | List tanks, membranes, pumps, controls, pipework, drainage alterations, electrical work, commissioning and training separately. | “Complete system” wording that conceals civil works, plumbing, power, drainage or commissioning exclusions. |
| Verification and acceptance | Define sampling points, methods, parameters, responsible tester, witnessing party, acceptance response and handling of failures. | No acceptance basis, or an unsupported claim that the equipment alone satisfies the applicable Irish approval route. |
| Maintenance and support | Set cleaning intervals, membrane or media replacement provisions, spare parts, response times, training and local service arrangements. | Warranty language that excludes consumables, membrane performance or routine site labour without clarification. |
| Commercial responsibility | State price exclusions, site-access assumptions, programme dependencies, approval responsibilities and price-validity conditions. | Unpriced site works or unclear responsibility for obtaining approvals, resolving non-compliance or returning the system to service. |
Use the red-flag table as a pre-signature review, not as an assertion that any supplier is non-compliant. Ask for the missing document: a process flow diagram, duty schedule, approval assumption, maintenance plan, acceptance protocol or itemised exclusion list. In particular, separate equipment supply from civil works, drainage alterations, plumbing, commissioning, verification, training, maintenance and ongoing monitoring.
The academic sources provide treatment context, but they do not resolve Irish site approval. Obtain written confirmation from the relevant authority or commissioning body and retain it with the quotation and acceptance schedule. For a Northern Ireland project, the route should explicitly address the Building Regulations (NI) 2012 (as amended) and DAERA pollution-prevention guidance identified in S2.
Further Reading
- comparison of UF and MBR for greywater recycling
- greywater route comparison for UF, MBR and package plants
- packaged biological options for greywater recycling
Frequently Asked Questions
Should a low-flow Irish site choose direct diversion, UF or MBR?
Choose direct diversion only where the source inventory, reuse destination and local acceptance route support it. Use UF or MBR as candidates when the required treatment objective, measured stream characteristics or site constraints make the additional process necessary. Ask the design authority and supplier to document that decision against the project’s water-quality evidence and reuse conditions; a low flow alone does not establish suitability.
What information must a supplier include in a greywater recycling quotation?
Require the quotation to state source streams, average and peak flow, operating hours, storage, treatment process, reuse destination, utilities, supplied equipment, installation scope, exclusions, commissioning, verification, training and maintenance. For price comparison, ask for the same information and request an itemised list of civil works and site services. Where no quotation has yet been obtained, the buyer must provide these inputs before comparing budget or commercial offers.
How should peak flow, greywater quality and reuse demand be supplied for accurate sizing?
Provide a measured or documented flow profile, the number and type of contributing fixtures, operating hours, storage requirements and any relevant water-quality analysis. Supply the non-potable reclaimed-water demand by destination and operating pattern. Ask the supplier to state the sizing assumptions and identify which additional measurements or site data remain outstanding before accepting the duty.
Which Irish approvals and acceptance evidence should be confirmed before ordering?
Confirm the applicable route with the local authority or commissioning body before ordering, especially where the project is in Northern Ireland. Record the requirements for Building Regulations (NI) 2012 (as amended) and DAERA pollution-prevention guidance where S2 applies, while obtaining the authority’s current interpretation. Before signature, agree sampling points, parameters, methods, witnessing, acceptance response and ownership of non-compliance remediation. The equipment specification should be checked against those written requirements, not accepted as a substitute for them.