Start with the reuse destination and required water quality
Choose between source-segregated UF and MBR for a greywater recycling system in Egypt by matching the route to the required non-potable reuse quality, available footprint and treatment objectives. UF can remove bacteria, colloids and suspended solids, while MBR combines biological treatment with membrane filtration. Neither route should be selected from household percentages alone. Obtain measured flows, influent characterization and destination-specific requirements, then compare vendors on one scope covering collection, treatment, disinfection, storage, pumping, controls and acceptance testing.
Define every intended destination separately. Toilet flushing, laundry, cooling and irrigation have different exposure patterns, supply requirements and monitoring obligations. Record the required reuse water quality for each use rather than applying one generic “greywater quality” specification. If laundry or another specified use is intended, ask the client to identify whether it is a permitted application under the applicable project criteria.
Establish whether blackwater is excluded at source. A source-segregated greywater project should define the fixtures and drainage connections included, what happens if contaminants or blackwater enter the stream, and how that event is detected and controlled. Do not accept a supplier’s greywater claim if the proposed equipment is being priced against an unspecified combined-sewage duty.
Request the applicable Egyptian authority, code and client acceptance criteria. The evidence establishes neither a current approval procedure nor a numeric discharge limit for this project, so regulatory compliance must remain a verification item. The detailed UF versus MBR greywater selection method and the broader UF, MBR and package-plant comparison provide selection logic, but the applicable Egyptian requirements must be confirmed for the intended reuse route.
Use the New Cairo study as a compound-scale benchmark, not a universal design rule. It evaluated 365 buildings and 7,512 units under stated per-capita assumptions [S1]. Its scale and assumptions may help frame a large Egyptian development, but they cannot replace project measurements, destination requirements or site verification.
Quantify the flow that the plant must handle
Size the plant from measured source-segregated greywater generation and destination demand, not from national potential estimates. Obtain flow data by fixture and occupancy period, including average day, peak period and minimum operating flow. Specify whether the design includes only the confirmed reuse period or provides storage and equalization for periods when greywater production falls below toilet-flushing demand.
The New Cairo study recorded total greywater production of 6,300 m³/day, while toilet-flushing demand was 2,700 m³/day, under the study’s stated per-capita assumptions [S1]. Those figures are scenario inputs, not default values for an Egyptian project. The important relationship was that recovered volume exceeded flushing demand, making potable-water offset demand-limited and leaving potential surplus for other non-potable uses [S1].
For the buyer’s RFQ, request the following project data:
- Average and peak source-segregated greywater generation, measured by fixture and occupancy period.
- Daily, peak and minimum destination demand for toilet flushing or other non-potable uses.
- Measured operating flow for the proposed treatment train, including any planned recovery or recycle stream.
- Storage and greywater flow-balancing requirements across unequal production and demand periods.
- Influent samples for suspended solids, turbidity, organic load, pathogens and other contaminants relevant to the intended destination.
The alternative greywater treatment-route comparison is useful for structuring that comparison, but project flow measurements remain the controlling inputs.
Compare UF and MBR against the actual project duty

Select the route that satisfies the measured duty and site constraints. UF is a filtration barrier; MBR adds biological treatment before membrane separation. That distinction can make UF attractive where the quality objective, organic-load variation and operating conditions support a physical treatment route. MBR may be considered where biological treatment is required within the compact treatment train, but its operator, maintenance, aeration and membrane-fouling demands must fit the site.
These technical differences influence the selection process for specific site conditions. The New Cairo model used coagulation, multimedia filtration and chlorination [S1], while UF and MBR remain alternative commercial routes requiring project-specific evaluation. Compare equipment on the conditions that can change the decision rather than on membrane pore size alone.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Source-segregated greywater with a low, relatively stable organic load | Evaluate a hollow-fiber UF water treatment system when its required separation and reuse-water quality are demonstrated by representative influent data. | Measured suspended solids, turbidity, organic load, pathogens, operating flow and required reuse-water quality. |
| Source-segregated greywater requiring biological treatment within a compact train | Evaluate an integrated MBR membrane bioreactor, including biological and membrane stages as one treatment duty. | Influent characterization, membrane-fouling tendency, footprint, aeration arrangement and operator capability. |
| Variable production and non-potable demand occurring at different times | Include greywater flow balancing, storage and destination-demand controls rather than relying on annual averages. | Hourly or time-of-day flow measurements, peak demand, minimum production and required storage duration. |
| Reuse destination with a defined health or contamination exposure | Set the required treatment and disinfection performance from the destination-specific acceptance criteria. | Client specification, applicable Egyptian criteria and sampling plan; no current numeric requirement is established by the available evidence. |
For any candidate route, request membrane material information, expected cleaning requirements, replacement assumptions and evidence of performance with representative greywater. Do not accept catalogue performance at clean-water conditions as proof of sustained site performance.
Build an RFQ scope that permits a like-for-like comparison
Issue one normalized RFQ so every quotation answers the same design and performance questions. Define collection boundaries, flows, operating periods, recovery, storage, destination demand and treatment performance before asking for a price. A supplier may then state which technical route and exclusions produce that price.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Design basis and collection | Source-segregated fixtures included; average, peak and minimum flow; operating hours; recovery target; greywater flow-balancing and storage duty. | No measured flow basis, unclear blackwater exclusion, or annual averages used without peak and minimum-flow values. |
| Treatment train | UF or MBR configuration, pretreatment, membrane type, cleaning method, disinfection stage and required reuse-water quality. | Route selected without representative influent data; guarantees stated only at clean-water conditions; disinfection omitted. |
| Pumping, storage and distribution | Destination pumping, tank duty, controls, local instrument scope, power supply and required monitoring. | Storage, duty pumps, controls or instrumentation excluded without identifying who supplies them. |
| Civil works and site interfaces | Collection connections, drainage route, equipment foundations, access, utilities, installation restrictions and available footprint. | Civil works or utility connections left undefined, shifting site risk to the buyer after award. |
| Commissioning and acceptance | Supplier or client samples, test methods, sampling points, performance demonstration and responsibility for remedy of failure. | No acceptance protocol, no agreed sample ownership, or “demonstration” without measurable criteria. |
| Operating and lifecycle commitments | Membrane replacement basis, chemical consumption, power demand, cleaning frequency, spare parts, O&M responsibilities and training. | Consumable prices, membrane life, cleaning assumptions or maintenance responsibility are excluded from the price. |
| Approvals and regulatory interface | Identify the applicable Egyptian authority or code, client criteria and the party responsible for each submission. | Supplier claims general compliance without naming the requirement or document that must be verified. |
State who supplies water-quality data, site utilities, civil works, permits, commissioning samples and acceptance testing. Require each quotation to list exclusions and assumptions. Membrane replacement, chemical consumption, power demand and O&M responsibilities are not quantified by the available case study, so they must remain explicit commercial items rather than assumed inclusions.
Test the business case without confusing case data with a quote

Use the New Cairo economics to test what a complete compound-scale system may cost, but not as a unit quotation for your project. The study reported greywater-system CAPEX of 3.37 million USD, equivalent to 535 USD/(m³/day), for its modeled compound, including disaggregated in-building supply, transfer networks and treatment-plant components [S1].
It reported OPEX of 0.06 USD/m³, equal to 137,970 USD/year at design flow, and straight-line levelized cost of water of 0.133 USD/m³ on a treated-volume basis [S1]. Potable-offset LCOW was 0.311 USD/m³ over a 20-year analysis horizon [S1]. Reproduce that last metric only after confirming recovered-water utilization and the offset assumptions; it is not interchangeable with cost per cubic metre treated.
Request a vendor quotation against the confirmed flow, treatment train, storage, disinfection, pumping, controls, civil interface and acceptance scope. Do not scale the New Cairo CAPEX or LCOW without local site inputs. The case study offers a benchmark for discussion of the detailed UF versus MBR greywater selection method; it does not establish an Egypt-wide equipment price or a current project quotation.
Frequently Asked Questions
What will a greywater recycling system in Egypt cost?
No Egypt-wide equipment price is established by the available evidence. The only supported economic benchmark is the New Cairo study’s 3.37 million USD CAPEX for its modeled compound, together with 0.06 USD/m³ OPEX and 0.133 USD/m³ treated-volume LCOW [S1]. Request itemized quotations for the confirmed treatment route, collection, disinfection, storage, pumping, controls, civil works, commissioning and O&M, then compare them on that common scope.
Should we choose UF or MBR for an Egyptian non-potable reuse project?
Choose UF when representative influent data and the destination-specific reuse-water quality support a filtration barrier and the site can manage its cleaning and maintenance duties. Consider MBR when biological treatment is required and the available footprint, power, aeration arrangement and operator capability support the combined biological and membrane process. The New Cairo model used coagulation, multimedia filtration and chlorination [S1], so the evidence does not make either commercial route mandatory in Egypt.
What flow and site data should we provide before requesting a quotation?
Provide measured average, peak and minimum source-segregated greywater generation by fixture and occupancy period; destination demand; available footprint; utilities; drainage route; installation restrictions; and representative influent results for suspended solids, turbidity, organic load, pathogens and relevant contaminants. Also request the applicable Egyptian authority, code and client acceptance criteria, because the supplied evidence establishes no current numeric discharge limit or approval route.
How should we select and compare suppliers for delivery, sizing and compliance risk?
Check that each supplier has priced the same flow basis, recovery target, treatment train, disinfection, storage, pumping, controls, utilities and acceptance protocol. Require named membrane and replacement assumptions, chemical consumption, power demand, cleaning obligations, O&M responsibilities, delivery scope and document responsibilities for the Egyptian approval route. The detailed UF versus MBR greywater selection method can guide route review, but supplier compliance remains an item to verify rather than a general claim to accept.