Confirm the Greywater Boundary and Intended Reuse
Define the source boundary before selecting equipment: bathing and laundry greywater excludes toilet, urinal, kitchen-sink and dishwasher wastewater (S2). If those sources must be included, UF is no longer a stand-alone comparison; biological treatment and a broader sewage-treatment route become necessary. Record every proposed reuse, obtain the owner’s treated-water quality criteria, and confirm the applicable local water reuse approval route before sizing equipment.
Ask the site team for a source-by-source inventory, average and peak daily flow, and the influent characteristics that may vary over time: suspended solids, organics, fats, oils and pathogens. Also document the available footprint, utility connections, drainage conditions and whether reclaimed water will contact people. These inputs determine whether the project is a dedicated greywater system or a decentralized wastewater treatment project with a broader treatment train.
List intended uses separately, including toilet flushing, laundry, irrigation and cleaning, and obtain written approval criteria from the relevant authority. Do not treat equipment performance, a published case study or a product specification as permission to connect reclaimed water. For a wider comparison, use the site-specific site-specific greywater equipment comparison as a decision framework, then validate the result against Canadian site data and approvals.
Compare UF, MBR and Packaged Treatment Routes
Select the treatment route based on the source boundary, treatment objective and end-use quality target rather than product capacity alone. UF is a membrane filtration barrier; it does not by itself establish the biological reduction, disinfection or authority approval needed for a selected reuse. An MBR combines biological wastewater treatment with membrane separation and is relevant where the design must reduce organics and solids before reuse. A packaged sewage treatment plant becomes the appropriate comparison when toilets, urinals or other wastewater are included within the project boundary.
The Canadian northern demonstration used an electrochemical treatment system without chemical addition and met the NSF/ANSI 350 criteria cited for that decentralized treatment application (S2). This does not establish that another membrane route, end use or jurisdiction is approved. Require the supplier to state the standard, application, sampling method and operating conditions supporting its proposal, and confirm those requirements with the relevant authority.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Only showering, bathing and laundry are collected | Compare UF as the physical-treatment option with an MBR where biological treatment is required by the owner’s quality target. | Source inventory; peak and average flow; suspended solids, organics, fats, oils and pathogen characteristics; intended end use. |
| Toilets, urinals, kitchen sinks or dishwashers enter the system | Use a packaged sewage treatment route or a broader biological treatment train; a UF-only route is not an equivalent project boundary. | Complete wastewater flow schedule, influent design data, footprint, drainage arrangement and local approval pathway. |
| Owner requires a named reclaimed-water quality target | Map the target to the proposed process, including any required biological treatment, membrane filtration and disinfection. | Owner specification, applicable plumbing or water reuse requirements, proposed test methods and end-use conditions. |
| Equipment is proposed for a Canadian site | Require jurisdiction-specific confirmation; product capability alone does not establish approval. | Authority and engineer named for design, jurisdiction, permit path, operating conditions and acceptance criteria. |
Request an ultrafiltration system for greywater treatment only after confirming its treatment scope and quality claim. If biological reduction is necessary, compare that boundary with an MBR membrane bioreactor for greywater reuse. The decision remains conditional until the site data and local approval requirements are resolved.
Test the Business Case Against Actual Reuse

Build savings from water the site can actually collect, treat and consume. Greywater from bathing and laundry activities typically represents about 50% of potable water consumption (S2), but that fraction does not establish the recoverable reuse volume at a particular commercial building.
The northern Canadian demonstration modelled a 35% savings in operating costs for water for commercial customers only if all treated greywater could be used for toilet flushing and laundry (S2). A Swedish case study reports potential savings of up to 50% of water used on site where bathroom wastewater supports non-direct functions such as washing vehicles and landscaping; that is case-study scope, not a Canadian guarantee (S3).
Calculate the business case from:
- Collected greywater flow and its variability.
- Reclaimed water that can be used at the intended flow rate.
- Current water and hauling costs.
- Treatment operating costs, including energy and consumables.
- Maintenance, monitoring, residuals handling and replacement demand.
Exclude reuse volume that cannot be consumed because of demand, storage limitations, seasonal variation or downstream restrictions. Also exclude water savings that the approved reuse route cannot deliver.
Turn the Selection into a Quotable Equipment Scope
Compare bids against a common process scope and acceptance basis. Require a process-flow diagram, source-by-source flow schedule, hydraulic and loading calculations, membrane or biological design basis, treated-water targets and complete site acceptance tests. The quotation should identify the authority or engineer responsible for each design item and distinguish supplier work from owner-provided information.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Treatment capacity and process basis | Average and peak flows, operating hours, source boundary, hydraulic calculations, loading basis and treatment train. | A single product-capacity figure with no influent limits, design calculations or operating assumptions. |
| Treated-water performance | Stated target, applicable standard, end use, sampling locations, test methods and site acceptance conditions. | Compliance claimed without naming the tested condition, authority requirement or acceptance protocol. |
| Installation and utilities | Supply boundaries for piping, controls, power, drainage, ventilation, access and owner-provided works. | Unclear responsibility for site works, utilities, controls integration or regulatory submittals. |
| Residuals and consumables | Chemical or nutrient handling, solids removal, storage, disposal route, monitoring and replacement obligations. | Exclusion of recurring consumables or disposal costs that materially change the operating case. |
| Commissioning and maintenance | Training, startup support, acceptance testing, operating documentation, maintenance scope and support responsibilities. | Commissioning or performance obligations left undefined, with no responsible party named. |
Require the performance guarantee to state its influent limits, operating hours, intended end use, acceptance tests and remedy for non-performance. For community implementation, the University of Alberta ReuseWater.ca WRR Roadmap provides guidance for meaningful engagement with affected communities (S5).
Further Reading
Frequently Asked Questions
When is UF alone appropriate, and when is an MBR or package plant justified?
UF alone is a candidate only when the source boundary and owner’s treated-water target can be met by the proposed membrane process. Choose an MBR when biological treatment is required within the greywater treatment train. Choose a packaged sewage route when the system must treat broader building wastewater, including toilet, urinal, kitchen-sink or dishwasher flows. The source inventory, influent data and reuse target settle the selection.
What site inputs should the supplier obtain before pricing a greywater recycling system in Canada?
Request the source inventory, average and peak flows, influent characteristics and variability, intended end uses, owner quality targets, footprint, utilities, drainage conditions and approval path. The buyer should also identify which design submissions and approvals remain the owner’s responsibility through its engineer or the relevant authority.
What performance evidence is needed before signing an equipment supply agreement?
Require a stated performance guarantee tied to influent limits, operating hours and intended reuse. Specify the complete site acceptance test, sampling locations, test methods, treatment target and applicable approval condition. A membrane or equipment capacity statement by itself is not evidence of compliant reuse.
How should quotations be compared on equal scope for a commercial greywater recycling project?
Use the same bid schedule for treatment train, capacity, treated-water target, controls, installation, utilities, commissioning, maintenance, training and acceptance testing. Identify exclusions for piping, controls, chemical or nutrient handling, solids disposal and owner-provided information. Request a priced line item for each included or excluded scope, together with the responsible party, rather than comparing headline equipment prices alone.