Choose the Reuse Route Before Selecting Equipment
For a greywater recycling system in Sweden, choose the reuse route first, then decide whether source-segregated treatment should use soil infiltration, ultrafiltration with validated disinfection, or a membrane bioreactor. A KTH study found that rotavirus required a 0.7–3.7 log reduction across its simulated exposure scenarios, while Campylobacter required 2.2 log for groundwater recharge. MBR can provide near-reuse-quality effluent and biological treatment; UF can remove bacteria, colloids and suspended solids, but neither product specification alone proves site compliance. Obtain flow, influent, reuse and location data before requesting a quotation.
The procurement brief should define the intended application: irrigation, toilet flushing, groundwater recharge, process water or direct contact. Each route creates a different exposure scenario and therefore requires a different treatment and validation basis. The UF versus MBR comparison for greywater recycling is useful as a process reference, but it does not replace a site-specific Swedish assessment.
Use the KTH definition of source-segregated greywater: domestic household wastewater from sinks, the shower, washing machine and dishwasher without toilet input. Obtain the source-segregation drawings and confirm whether toilet wastewater is physically excluded. Also request average and hourly peak greywater flow, proposed reuse volume, available footprint, drainage connections, utilities and operator maintenance capability.
Before comparing quotations, ask the project’s Swedish authority contact which environmental, approval and site-specific requirements apply to the proposed reuse route. The evidence reviewed for this article does not establish a current Swedish permit, discharge limit or universal reuse standard. The quotation request should identify the intended authority, permit basis and responsible party rather than treating a general microbiological study as regulatory approval.
Compare the Treatment Routes by What Must Be Removed
Select the process by matching treatment barriers to the reuse exposure and the contaminants present at the inlet. The KTH study identifies soil infiltration as the most common practice for greywater treatment in Sweden and recommends observing wastewater-infiltration recommendations for greywater as well. It also suggests that active sludge may not be suitable because greywater has low carbon content, while chemical precipitation may remove phosphorus and viruses efficiently.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Groundwater recharge or direct-contact reuse | Consider a barrier approach supported by project-specific pathogen validation; MBR may be relevant where biological treatment and membrane separation are required. | Exposure scenario, site hydrogeology, inlet faecal indicators, pilot results and the applicable Swedish authority decision. |
| Irrigation or another non-potable reuse route | Assess soil infiltration, UF with validated disinfection, or MBR against the contaminants relevant to the application. | Intended use, daily demand, hourly peak, influent characterization and validated water-quality targets. |
| Low organic carbon in source-segregated greywater | Do not assume conventional active sludge is suitable; investigate chemical precipitation where phosphorus and virus removal are relevant. | Organic load, nutrient data, treatment objectives and comparative removal data for the proposed route. |
| Suspended solids, colloids and bacteria | Evaluate UF water treatment system performance and the downstream disinfection barrier; use the MBR membrane bioreactor where biological treatment is part of the required route. | Inlet turbidity and suspended solids, membrane configuration, disinfection validation and project-specific acceptance values. |
Request the influent characteristics needed to establish performance: suspended solids, turbidity, organic load, pH, temperature and faecal indicators. Request pilot or validation data under the proposed inlet conditions, not only generic membrane specifications. For a deeper process check, use the greywater recycling equipment selection material as a comparison aid, while retaining the Swedish site data as the governing basis.
Build the Hygiene and Reuse Validation Plan

Define the hygiene evidence by exposure route before accepting a treatment route. The KTH study evaluated direct contact, irrigation, groundwater recharge and recreational-water exposure scenarios. Use the scenario matching the proposed reuse to determine which treatment barriers and sampling results must be demonstrated.
The study reported a rotavirus reduction requirement of 0.7–3.7 log across its simulated exposure scenarios and a Campylobacter reduction requirement of 2.2 log for groundwater recharge. Its screening-level acceptable risk criterion was 10−3. That criterion belongs to the research assessment; it must not be represented as a Swedish regulatory limit or site-specific approval.
Require the supplier to state:
- the sampling points and operating conditions;
- the analytical methods and organisms or indicators included;
- the acceptance values and whether they apply to each reuse scenario;
- the test duration and representation of expected operating variation; and
- the party responsible for sampling, testing, interpretation and corrective action.
For UF, the validation package should address membrane integrity or performance, upstream treatment, downstream disinfection and faecal-indicator performance. For MBR, it should address biological treatment, solids separation, membrane performance and any additional disinfection barrier. Neither route should be accepted solely on pore size, nominal permeate quality or a general claim of reuse suitability.
Turn the Selection into a Quotable System Scope
A comparable quotation must define the complete treatment train and assign responsibility for every performance claim. The industrial wastewater reuse systems comparison provides a broader reference, but the greywater quotation should follow the actual site boundaries and reuse route.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Source segregation and collection | Show collection points, exclusion of toilet wastewater, pipework interfaces, accessible isolation and the responsibility for upstream works. | Collection is assumed without drawings, or cross-connection risks are outside the supplier’s scope. |
| Equalization and pretreatment | Specify flow basis, design peak, storage behavior, screening, pumping and the treatment required before the selected membrane process. | No design flow is stated, or high-strength events are excluded without an operating response. |
| UF or MBR process | State the process objective, tested inlet water quality, membrane arrangement, control philosophy, cleaning provisions and treatment boundaries. | Reuse suitability is guaranteed from membrane pore size or generic performance data alone. |
| Disinfection or additional barriers | Define the barrier, dose or control where applicable, monitoring, verification method and responsibility for maintaining the validated condition. | Disinfection is merely listed without an acceptance method, operating trigger or validated performance criterion. |
| Storage, pumping and controls | Include non-potable water reuse storage, reuse demand, pump duties, controls, alarms, data records and interfaces with the reuse point. | Storage and distribution are omitted, leaving reuse quality unprotected between treatment and use. |
| Commissioning and validation | Assign installation, training, startup, sampling, laboratory analysis, acceptance testing and handover of operating documentation. | The supplier supplies equipment but leaves project-specific hygiene testing or Swedish authority liaison to the buyer without agreement. |
| Commercial and lifecycle terms | Separate delivery, installation, commissioning, training, spare parts, membrane replacement assumptions, warranty exclusions and performance-test responsibilities. | Delivery, installation, validation, membrane life and warranty obligations are bundled or excluded ambiguously. |
State the flow basis, design peak, treatment objective, reuse route, tested inlet quality, footprint, utilities, installation boundary, operator hours and commissioning responsibilities in the RFQ. For monitoring and control details, the pH and ORP controller guide can help identify instrument duties, but it does not establish the required values for this project.
Make acceptance conditional on two separate demonstrations: hydraulic performance under the stated flow conditions and project-specific water-quality and hygiene performance for the intended reuse. Require the quotation to name the compliance basis and responsible Swedish authority contact. If it cannot, treat that as an unresolved commercial and approval risk rather than an implied approval.
Further Reading
Frequently Asked Questions
What inputs determine the preliminary size of a greywater recycling system in Sweden?
Request average and hourly peak greywater flow, source-segregation drawings, influent characteristics, intended reuse route, available footprint and utilities. These inputs establish the preliminary hydraulic and treatment basis. Do not size the system from membrane nominal capacity alone, because the actual flow condition and inlet water quality must be included in the supplier’s sizing calculation.
How should UF and MBR systems be compared for acceptance?
Compare hydraulic performance under the stated peak and operating conditions, then require project-specific water-quality and hygiene validation for the selected reuse exposure. The acceptance package should name sampling points, analytical methods, test conditions, acceptance values and responsible parties. For groundwater recharge or direct-contact reuse, require the supplier to explain how the proposed barrier addresses the KTH study’s rotavirus and Campylobacter findings without presenting them as Swedish regulatory limits.
Which supplier-selection criteria matter more than membrane specifications?
Assess the complete scope: source-segregation interfaces, equalization and pretreatment, storage and pumping, disinfection or other barriers, controls, monitoring, commissioning, training, validation and maintenance responsibilities. Require membrane replacement assumptions, warranty exclusions and delivery, installation and performance-test duties to appear as separate quotation items. A proposal that relies only on pore size or nominal permeate quality is incomplete for procurement.
Does the research establish the Swedish permit or discharge requirements for this project?
No. The reviewed evidence does not establish a current Swedish permit, discharge limit or universal reuse standard. Ask the site’s responsible Swedish authority which approval applies to the proposed reuse route, and require the supplier to identify the project-specific compliance basis and supporting validation documents. General research can inform treatment selection, but it cannot substitute for that authority decision.