Define the greywater route before selecting equipment
Choose ultrafiltration (UF) when the greywater is relatively low-strength and the design objective is solids removal, membrane polishing and reuse such as irrigation or limited non-potable demand; choose a membrane bioreactor (MBR) when biological treatment is required for a more demanding reuse quality target or changing source composition. Neither option should be selected from peak flow alone. The source split, hourly flow profile, COD, BOD5, turbidity, suspended solids, coliforms, reuse endpoint and local approval route must be confirmed first. A 2026 Brazilian residential study found turbidity consistently below 5 NTU and COD below 5 mg·L−1, but these results are not Portuguese acceptance criteria.
Start with the physical route rather than the equipment name. Record whether showers, washbasins, baths and laundry contribute to the proposed system. Keep kitchen wastewater and sewage outside the scope unless they are separately designed, permitted and included in the treatment duty.
Obtain hourly and daily greywater flow rates, including peak simultaneous discharges, from the project owner or site operator. The same source profile should identify how much water comes from each fixture and how demand changes seasonally. This data determines storage volume, pumping duty, membrane sizing and whether a duty/standby arrangement is justified.
Define the destination before defining the process. Toilet flushing, irrigation, cooling-water make-up and other non-potable reuse have different water-quality, monitoring and operating requirements. Request the required reuse quality, application conditions and the project owner’s evidence of the applicable Portuguese approval route. The available research does not identify the responsible Portuguese authority or approval procedure, so the supplier must substantiate that route rather than assume it.
The UF versus MBR greywater selection framework provides a useful comparison structure, while the greywater recycling equipment comparison helps frame the procurement boundary. Neither replaces site measurements or local approval evidence.
Match source conditions and reuse needs to treatment routes
Select the least complex treatment route that can reliably meet the defined reuse requirement. Source segregation and physical filtration may suit relatively clean washbasin flows where the selected reuse route supports that approach. UF adds membrane separation and polishing; an integrated MBR membrane bioreactor combines biological treatment with membrane separation. Transitions between these stages require careful hydraulic balancing to ensure consistent effluent quality.
| Discharge route or influent problem | Governing rule or process option | What data settles it |
|---|---|---|
| Relatively clean washbasin flow isolated from other greywater | Consider source segregation, physical filtration and disinfection where the chosen reuse route supports them; assess a hollow-fiber UF water treatment system if membrane polishing is required. | Fixture-level flow profile, particulate loading, turbidity, suspended solids, coliforms and the intended reuse endpoint |
| Mixed shower, bath, washbasin and laundry greywater with variable organic loading | Use pretreatment before UF or MBR; require biological treatment when the reuse specification cannot be met by membrane polishing alone. | COD, BOD5, turbidity, suspended solids, grease, daily and peak flows, and source-specific sampling results |
| Combined system requiring biological treatment and membrane solids separation | Evaluate an integrated MBR membrane bioreactor, including aeration, membrane operation, sludge or solids handling and the required controls. | Influent characterization, reuse-quality specification, footprint, utility connections, electrical supply and operator-maintenance resources |
| Storage and reuse demand occur at different times | Include storage turnover and reuse-system interlocks in the treatment scope rather than sizing only from average daily flow. | Hourly inflow and demand profiles, seasonal variation, available storage volume and drainage route |
One integrated case provides useful technical evidence but is not a procurement guarantee. In the residential study reported by ACS Omega, the system combined constructed-wetland pretreatment, continuous aeration, cartridge filtration and ultraviolet disinfection. Turbidity remained below 5 NTU, COD was under detection limits (<5 mg·L−1), and thermotolerant coliforms were absent. The reported treatment train therefore included biological and disinfection stages, not UF alone.
For the proposed Portuguese installation, require evidence that the selected route addresses its actual sources. A hollow-fiber UF water treatment system should be evaluated against the required solids separation and polishing duty; an MBR should be evaluated where biological treatment is necessary. Neither route can be justified from peak flow or a generic reuse label alone.
Check the evidence against the Portuguese project

Do not convert study results into Portuguese guarantees without a project-specific design and approval basis. The ACS Omega study monitored a residential integrated rainwater and greywater recycling system in Rio Verde, Brazil, for 16 months. Its location, combined rainwater-and-greywater configuration and treatment train differ from an unspecified Portuguese site, so its results demonstrate one system’s operation rather than establish equivalence with Portuguese reuse rules or the proposed source waters.
The study also reports average potable water savings of 41%, with a minimum of 28% and maximum of 51%, and self-sufficiency through six consecutive months without rainfall. These are study-specific outcomes. They are not expected savings for a Portuguese project, where demand, rainfall, source composition, storage and operating conditions may differ.
Before award, require each bidder to identify the Portuguese approval route, applicable technical requirements, test methods and parties responsible for design verification. Ask for supporting documents that trace each proposed parameter to the intended reuse application and regulatory submission. If the bidder cannot identify the route or required evidence, that is a compliance risk to resolve contractually.
The project owner should separately confirm with the competent Portuguese body which approval and discharge or reuse provisions apply. The comparison of UF and MBR for greywater recycling can support technical discussion, but it does not establish Portuguese approval requirements for this site.
Build a quotation scope that fixes the technical boundary
Require every bidder to price the same duty, interfaces and proof of performance. The RFQ should state the design flow basis, eligible greywater sources, pretreatment, treatment train, storage, pumping, reuse distribution, controls and electrical supply. Establishing a clear technical boundary prevents the risk of comparing incompatible UF and MBR proposals.
| Quote line item | Technical scope to specify | Red flags to check before signing |
|---|---|---|
| Design basis and source segregation | Fixture-level source list, hourly and daily flows, peak simultaneous discharge, influent characterization and explicit exclusion of kitchen wastewater and sewage unless separately permitted. | “Sized for peak daily flow” without an hourly profile, or a source list that differs between bidders |
| Pretreatment and treatment train | Physical filtration, aeration or biological treatment, membrane stage, disinfection, backwashing, membrane cleaning and sludge or solids handling as applicable. | Generic treatment descriptions with no operating mode, control sequence or solids-disposal boundary |
| Pumping, storage and reuse distribution | Equipment duty, pump changeover, storage volume, turnover provisions, reuse controls and interlocks, drainage route and available connections. | Storage, ancillary pipework or drainage connections omitted because they were assumed to be “by others” |
| Instruments and sampling | Named instruments, sample points, signal outputs, calibration responsibility and the method for demonstrating each agreed reuse-quality parameter. | Only a general statement that the outlet will “meet reuse standards,” without parameters or test methods |
| Commissioning and handover | Commissioning duration, training, operating manual, as-built drawings, test certificates, membrane and consumable information, warranty and operator tasks. | No named acceptance stage, no responsibility for laboratory testing, or handover documents excluded from price |
| Supply and installation boundary | Delivery point, installation, civil works, electrical supply, controls integration, spares, duty/standby configuration, exclusions and site assumptions. | Supply-only pricing presented as an installed price, with exclusions discovered after award |
Require suppliers to identify all exclusions and assumptions explicitly. Ask them to state delivery scope, installation boundary, commissioning duration, warranty, operator-training content and recurring operator tasks. These fields determine whether quotations can be compared without hidden scope differences.
Set acceptance criteria before the equipment is delivered

Define acceptance as a documented test, not a supplier statement. For every agreed parameter, specify the influent sampling method, operating condition, test duration, laboratory method, responsible party and acceptance requirement. State whether performance is demonstrated during commissioning, a stability test or a fixed operating period, and record the treatment train’s operating state throughout the test.
Include functional demonstrations for equipment actually supplied: automatic controls, alarms, membrane backwash, membrane cleaning, storage turnover, pump changeover and reuse-system interlocks. These checks establish whether the treatment train works as an integrated system rather than whether individual components operate in isolation.
Make handover records contractual deliverables. Require the operating manual, as-built drawings, test certificates, training records and membrane or consumable replacement information. The effluent turbidity monitoring guide explains why monitoring should be defined as part of the performance scheme. Do not accept a general claim of compliance without the corresponding records.
The final review should reconcile three items: the approved source and reuse profile, the as-built treatment train, and the acceptance-test results. Any discrepancy should be resolved through the contract’s test, correction and acceptance procedure.
Frequently Asked Questions
What flow data should I provide before asking for a greywater recycling system in Portugal?
Provide hourly and daily flow rates, peak simultaneous discharges, the fixture-level source split and seasonal reuse demand. Include the proposed storage volume and drainage route. These inputs are needed to check membrane and pump duty, storage turnover and the duty/standby configuration; average daily flow alone is insufficient.
Should the project use UF or MBR for greywater treatment?
Use UF when the selected reuse target can be met with solids removal and membrane polishing of the supplied greywater, subject to pretreatment and disinfection. Use MBR when biological treatment is required. Confirm the decision against COD, BOD5, suspended solids, turbidity, coliforms, source variability and the final reuse specification rather than equipment type alone.
What should I include in a greywater recycling system quotation to compare cost fairly?
Require a priced scope covering source segregation, design flows, pretreatment, treatment train, storage, pumping, reuse distribution, controls, electrical supply, instruments, commissioning, training and acceptance testing. Ask each bidder to list exclusions, site assumptions, delivery and installation boundaries, warranty and operator tasks. Since the available research contains no Portuguese equipment price, a defensible cost comparison requires project-specific quotations on this common scope.
Which Portuguese approval evidence should the supplier provide?
Ask the bidder to identify the proposed Portuguese approval route, applicable technical requirements, supporting documents, test methods and responsible design-verification parties. The project owner must confirm the route with the competent Portuguese body because the available evidence identifies neither a responsible authority nor a site-specific approval procedure. Treat a generic statement of compliance as insufficient.