Wastewater treatment expert: +86-181-0655-2851 Get Expert Consultation

MBR Membrane Systems

MBR Membrane Bioreactor Wastewater Treatment System

Integrated MBR membrane bioreactor system combining activated sludge treatment with submerged PVDF membrane filtration. Delivers near-reuse-quality effluent (<1 μm filtration) with 60% smaller footprint than conventional systems. Ideal for municipal sewage, industrial process water, and water reuse projects from 10 to 2,000 m³/day.

MBR Flat Sheet Membrane Module (DF Series)

DF series PVDF flat sheet membrane modules for submerged MBR applications. Features 0.1 μm pore size with integrated aeration box for continuous membrane scouring. Individually replaceable membrane elements, stainless steel frame, and 10–20× lower energy consumption than external cross-flow systems. Available in 80–225 m² configurations producing 32–135 m³/day.

Contact
Contact Us
Call Us
+86-181-0655-2851
Email Us Get a Quote Contact Us