# HydropureWater — Industrial Wastewater & Pure Water Treatment Equipment > HydropureWater manufactures wastewater treatment systems (DAF flotation, MBR bioreactors, integrated sewage plants, sludge dewatering) and pure-water production lines (reverse osmosis 72-10,000 m3/d, ultrafiltration 2-40 T/h, EDI polishing, water softeners, bottled-water filling lines) for 6 major industries; equipment exported to 30+ countries. 15+ years, 1,000+ projects delivered (cumulative, China and export). ## Company Facts - Full name: HydropureWater - Brand: HydropureWater / HydropureWater - Founded: 2009 - Headquarters: Hangzhou, Zhejiang, China - Export markets: 30+ countries, including Africa, the Middle East, North America and Southeast Asia (export register, as of Sep 2026) - Certifications: ISO 9001, ISO 14001, CE marking - Website: https://hydropurewater.com - Email: bhuybhuybhuh@gmail.com - Phone: +86 166-0638-0944 ## Core Equipment Categories ### DAF Dissolved Air Flotation Systems - Capacity: 4–300 m³/h - Applications: Oil-water separation, TSS/colloid removal, grease removal - Industries: Food processing, oil & gas, textile, pharmaceutical - URL: /product/cat-daf-flotation-systems/index.html ### MBR Membrane Bioreactor Systems - Membrane type: PVDF flat-sheet - Permeate output: 32–135 m³/d per module - Effluent quality: Turbidity <1 NTU, meets Class 1A discharge - URL: /product/cat-mbr-membrane-systems/index.html ### Integrated Sewage Treatment Equipment - Capacity: 1–80 m³/h - Installation: Underground or above-ground - Discharge standard: China Class 1B (GB 18918) - URL: /product/cat-integrated-sewage-treatment/index.html ### Sludge Treatment & Dewatering Equipment - Types: Plate & frame filter press, belt press, screw press - Moisture content: ≤60% after dewatering - URL: /product/cat-sludge-treatment/index.html ### Chemical Dosing Systems - Chemicals: PAC, PAM, NaOH, HCl, NaClO - Control: PLC automatic dosing with flow-proportional control - URL: /product/cat-chemical-dosing-systems/index.html ### Water Purification Equipment - Types: Multi-media filters, activated carbon filters, RO systems - Output: 0.5–100 m³/h - URL: /product/cat-water-purification/index.html ### Disinfection Equipment - Types: Chlorine dioxide generators (chemical & electrolytic) - Capacity: 50–5000 g/h - URL: /product/cat-disinfection-equipment/index.html ### Screening & Pretreatment - Types: Rotary mechanical bar screens, fine screens - Channel width: 400–2000 mm - URL: /product/cat-screening-pretreatment/index.html ### Air & Dust Treatment - Types: Odor control and exhaust gas treatment systems for wastewater plants - URL: /product/cat-air-dust-treatment/index.html ### Reverse Osmosis Systems - Capacity: 72-10,000 m3/d; seawater (SWRO) and brackish-water (BWRO) duty available - Applications: Process water, boiler feed, drinking water, desalination - URL: /product/cat-reverse-osmosis-systems/index.html ### Ultrafiltration Systems - Capacity: 2-40 T/h; hollow-fiber PVDF membranes, 0.03 micron - Applications: Turbidity/SS removal, RO pretreatment, drinking water supply - URL: /product/cat-ultrafiltration-systems/index.html ### Pure Water & Bottling Equipment - Types: EDI electrodeionization polishing, water softeners (1-45 T/h), commercial direct-drinking systems, bottled water production lines (blowing-filling-labeling-packaging) - URL: /product/cat-pure-water-bottling-equipment/index.html ### Spare Parts & Consumables - Types: RO/UF membranes and filter elements, filter cartridges (10-40 inch), FRP tanks, control valves, dosing pumps, filter media - URL: /product/cat-spare-parts-consumables/index.html ## Industries Served - [Food & Beverage Processing](/industry-food.html): High BOD/COD, grease, organic solids - [Textile & Dyeing](/industry-textile.html): High-color wastewater, dye removal, water reuse - [Chemical Processing](/industry-chemical.html): Toxic organics, high-concentration COD - [Pharmaceutical Manufacturing](/industry-pharma.html): API removal, MBR with extended sludge retention - [Oil & Gas](/industry-oil.html): Oily wastewater, produced water, refinery effluent - [Municipal Wastewater](/industry-municipal.html): Urban sewage, rural integrated treatment ## Key Pages - [Home](https://hydropurewater.com/) - [All Products](https://hydropurewater.com/product/index.html) - [Blog & Technical Articles](https://hydropurewater.com/blog/index.html): 8,000+ engineering guides covering equipment selection, costs, regulations, and troubleshooting for industrial wastewater treatment worldwide - [About Us](https://hydropurewater.com/about.html) - [Contact Us](https://hydropurewater.com/contact.html) - [Request a Quote](https://hydropurewater.com/request-quote.html) - [Industries Overview](https://hydropurewater.com/industries.html) ## Technical Capabilities - Process design: Pilot testing → process simulation → engineering design → equipment manufacturing - Custom engineering: Turnkey solutions tailored to specific wastewater characteristics - After-sales: Remote monitoring, spare parts supply, on-site maintenance teams - Design standards: HJ 2007, GB 18918, GB 8978, US EPA guidelines ## Frequently Asked Questions - Q: What is the typical lead time for custom equipment? A: 30–45 days for standard models, 60–90 days for custom-engineered systems. - Q: Do you provide installation and commissioning services? A: Yes, we offer worldwide installation, commissioning, operator training, and ongoing technical support. - Q: What discharge standards can your equipment meet? A: Our systems achieve China Class 1A/1B (GB 18918), EU Urban Wastewater Directive standards, and US EPA Clean Water Act limits depending on configuration. - Q: What is the minimum order quantity? A: No MOQ — we supply single units to complete treatment plants. ## Chinese Website - URL: https://www.wateretechs.com - Language: Chinese (Simplified) - Content: Same products and services, localized for domestic market ## Industrial Wastewater Database - Textile Wastewater by Country | HydropureWater: /industries/textile/ - Textile Wastewater in Bangladesh — Dossier | HydropureWater: /locations/bangladesh/textile-wastewater/ - Textile Wastewater in Pakistan — Dossier | HydropureWater: /locations/pakistan/textile-wastewater/ - Food & Beverage | HydropureWater: /industries/food/ - Chemical Manufacturing | HydropureWater: /industries/chemical/ - Pharmaceutical Manufacturing | HydropureWater: /industries/pharma/ - Oil & Gas | HydropureWater: /industries/oil/ - Municipal Wastewater | HydropureWater: /industries/municipal/ - Connected knowledge graph: /database/ - Published study samples and standards carry source links, dates and applicability. These are references; equipment sizing requires site measurements.